1 |
CMP/200917/0006606 |
17/09/2020
|
25/05/2023
|
Mr Raghushankar Mrs Usharani P |
MANTRI CASTLES PVT LTD |
Mantri Serenity4 |
Mantri Castles Pvt Ltd |
Bengaluru Urban |
Delay compensation as per RERA provisions |
AUTHORITY
|
BENCH6
|
|
2 |
CMP/UR/220706/0009716 |
06/07/2022
|
25/05/2023
|
NAGENDRA PRASAD H S |
SHREE SAI DEVELOPERS & PROMOTERS |
sai grand residency |
shree sai developers and promoters |
Bengaluru Urban |
Rs.5,00,000/- of advance amount alongwith 10% per month as damages as per the agreement dated 09.09.2021, damages pending till april 2022 Rs.50,000/- |
AUTHORITY
|
BENCH6
|
|
3 |
CMP/220625/0009691 |
25/06/2022
|
25/05/2023
|
Varun Bansal |
SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTD |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation should be processed |
AUTHORITY
|
BENCH6
|
|
4 |
CMP/220725/0009800 |
25/07/2022
|
25/05/2023
|
SRINIVASAN NATARAJAN |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund with interest and compensation |
AUTHORITY
|
BENCH6
|
|
5 |
CMP/220316/0009142 |
16/03/2022
|
25/05/2023
|
Shiraz Kunnummale Purayil |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Directing the Respondent Builder to refund the sum of Rs. 52,49,876/-(Rupees Fifty Two Lakhs Forty Nine Thousand Eight Hundred And Seventy Six Only) along with other Monies paid by the Complainant. |
AUTHORITY
|
BENCH6
|
|
6 |
CMP/221103/0010168 |
03/11/2022
|
25/05/2023
|
MAYANK TAYAL, PRACHI TAYAL |
PURAVANKARA LIMITED |
Provident Woodfield |
Puravankara Limited |
Bengaluru Urban |
Permanent boundary wall and club facility |
AUTHORITY
|
BENCH4
|
|
7 |
CMP/200802/0006294 |
02/08/2020
|
25/05/2023
|
PULKIL ARORA |
MANTRI MANYATA LITHOS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Compensation for delay as per RERA. |
AUTHORITY
|
FULLBENCH
|
|
8 |
CMP/220411/0009343 |
11/04/2022
|
25/05/2023
|
MR AMARJEET SINGH GILL |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Request for the refund of the amount with interest |
AUTHORITY
|
BENCH5
|
|
9 |
CMP/220520/0009499 |
20/05/2022
|
25/05/2023
|
Vaibhav Shah, Rekha Kirit Shah and Kirit U Shah |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund and compensation. |
AUTHORITY
|
BENCH6
|
|
10 |
CMP/200316/0005733 |
16/03/2020
|
25/05/2023
|
VIJETHS BABU |
Infinite Builders & Developers |
GM ORCHID ENCLAVE |
Infinite Builders & Developers |
Bengaluru Urban |
Total value paid INR 116600 plus nominal Interest |
AUTHORITY
|
BENCH5
|
|
11 |
CMP/220715/0009755 |
15/07/2022
|
25/05/2023
|
HULIRAJ H |
OZONE REALTORS PRIVATE LIMITED |
Ozone Polestar |
Ozone Realtors Private Limited |
Bengaluru Urban |
Refund of Amount so far paid to the Promoters through Self and Bank along with interest and compensation. Refund of PRE EMIs paid and Home Insurance amount along with compensation of Rs. 5,00,000/- |
AUTHORITY
|
BENCH6
|
|
12 |
CMP/UR/220412/0009354 |
12/04/2022
|
25/05/2023
|
Anil Kumar N S |
MINISTRY OF COMMUNICATIONS EMPLOYEES CO-OPERATIVE HOUSING SOCIETY LIMITED |
New Bangalore City Layout Stage 6 |
Ministry of Communications Employees Co-operative Housing Society Ltd. |
Bengaluru Urban |
I am requesting the honorable authority to intervene and direct the society to allot the site immediately without further delay and provide site allotment and possession to proceed with registration. |
AUTHORITY
|
BENCH6
|
|
13 |
CMP/UR/220629/0009698 |
29/06/2022
|
25/05/2023
|
EMBARCADERO VENTURES LLP |
DURGA PROJECTS & INFRASTRUCTURE PVT LTD |
DURGA PETALS |
DURGA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED |
Bengaluru Urban |
Direct the Developer to execute registered sale deed and hand over possession of apartment bearing No. C-206 and C-1005 and the Developer is also liable to pay a sum of Rs,1,42,79,797/- to complaina |
AUTHORITY
|
BENCH5
|
|
14 |
CMP/200516/0005863 |
16/05/2020
|
25/05/2023
|
PRANAV SINGH |
MOTZKIN PAKR TERRACE |
Motzkin Park Terrace |
Motzkin Ventures |
Bengaluru Urban |
Refund and compensation |
AUTHORITY
|
BENCH5
|
|
15 |
CMP/UR/200824/0006384 |
24/08/2020
|
24/05/2023
|
JAGAT KUMAR AGARWAL |
Mr. Sushi Mantri, Mr. Sriharsha Y.R. Mantri Developers Pvt Ltd |
MANTRI ALPYNE |
MANTRI DEVELOPERS PVT LTD |
Bengaluru Urban |
refund of balance Rs. 1,00,000/- together with interest |
AUTHORITY
|
BENCH6
|
|
16 |
CMP/220719/0009769 |
19/07/2022
|
24/05/2023
|
Nitin Sambyal |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund with Interest and compensation |
AUTHORITY
|
BENCH6
|
|
17 |
CMP/220517/0009473 |
17/05/2022
|
24/05/2023
|
Arman Hayat |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund along with exit. |
AUTHORITY
|
BENCH6
|
|
18 |
CMP/220617/0009647 |
17/06/2022
|
24/05/2023
|
Mohammed Ameen Makkadayil |
SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTD |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay |
AUTHORITY
|
BENCH6
|
|
19 |
CMP/220321/0009218 |
21/03/2022
|
24/05/2023
|
Kondeti Veera Siva Kumar |
PEARL COMMUNITY ONE DEVELOPERS PRIVATE LIMITED |
PALM VISTAS |
PEARL COMMUNITY ONE DEVELOPERS PVT LTD |
Bengaluru Urban |
Direct the respondents to register and deliver possession of villa, BE-02 with completion of pending works as per the agreements, along with MOU and Possession Delay interests within a month. |
AUTHORITY
|
BENCH6
|
|
20 |
CMP/210706/0008099 |
06/07/2021
|
24/05/2023
|
VIVEK SHUKLA |
UNITECH LTD. |
UNIWORLD RESORTS |
UNITECH LTD |
Bengaluru Urban |
Refund of entire amounts as paid with interest and compensation |
AUTHORITY
|
FULLBENCH
|
|
21 |
CMP/200907/0006525 |
07/09/2020
|
23/05/2023
|
HARINI ARAVIND, YAMUNA SETHURAMAN |
TGR PROJECTS INDIA PVT LTD |
Ankshu Ecstasy |
TGR Projects India Pvt Ltd |
Bengaluru Urban |
Refund Rs.5395186 with 12% int & Rs.1000000 comp. |
AUTHORITY
|
BENCH4
|
|
22 |
CMP/180926/0001322 |
26/09/2018
|
23/05/2023
|
SUNIL KUMAR AMBASTHA |
T.K.RAGHAVENDRA, M/S RKR DEVELOPERS PRIVATE LIMITED |
RKR VINAYAKA ENCLAVE |
T.K. RAGHAVENDRA |
Bengaluru Urban |
Refund of deposited amount and the other relief. |
AUTHORITY
|
BENCH4
|
|
23 |
CMP/UR/221115/0010335 |
15/11/2022
|
23/05/2023
|
Sri SANDEEP AGRAWAL |
GOLDEN GATE PROPERTIES LTD |
Golden Days |
M/s. GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
1)To direct the Respondents to refund Rs.3,00,000/- (Rupees Three Lakhs Only) along with applicable interests. 2) To award costs. 3) Such other orders and reliefs that this Hon'ble Authority deems fit |
AUTHORITY
|
BENCH6
|
|
24 |
CMP/UR/211119/0008587 |
19/11/2021
|
23/05/2023
|
Puravankara Limited |
TANUJA PASUMARTHI |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 23.07.2018 bearing registration number JPN-1-04150-2018-19 for apartment no. B5-5A-205. |
AUTHORITY
|
BENCH6
|
|
25 |
CMP/UR/211210/0008710 |
10/12/2021
|
12/05/2023
|
R G SHETTI |
MAITHRI DEVELOPERS |
Shilpitha Splendour |
Maithri Developers |
Bengaluru Urban |
Take action against the Builder and enforce him to obtain the pending NOCs. |
AUTHORITY
|
BENCH4
|
|
26 |
CMP/210415/0007897 |
15/04/2021
|
12/05/2023
|
SUNDEEP TEKI & ANU CHOWDHRY |
M/S RD BUILDTECH AND DEVELOPERS(KAR) PRIVATE LIMITED |
Reliaable Residenza Phase 1 |
Rd Buildtech and Developers(Kar) Pvt Ltd |
Bengaluru Urban |
Sum of INR 2 Lakhs(Booking Amount)with interest @ 18% p.a from date of payment till repayment by Promoter,INR 3 Lakhs for violation of provisions of RERA and allied rules and INR 50,000/-as legal fees |
AUTHORITY
|
BENCH4
|
|
27 |
CMP/200314/0003114 |
14/03/2020
|
12/05/2023
|
RAMLAL GANNA |
BHARAT & BHARATH PROPERTIES , GAURAV BHANDARI BHARAT C |
Pearl Peridot |
Bharat And Bharath Properties |
Bengaluru Urban |
Possession/Refund with Interest,Compensation & dam |
AUTHORITY
|
BENCH4
|
|
28 |
CMP/200909/0005718 |
09/09/2020
|
12/05/2023
|
ABHISHEK PACHISIA |
BHARAT AND BHARATH PROPERTIES, BHARAT C |
Pearl Peridot |
Bharat And Bharath Properties |
Bengaluru Urban |
refund of amount and compensation |
AUTHORITY
|
BENCH4
|
|
29 |
CMP/200630/0005720 |
30/06/2020
|
12/05/2023
|
PUSHPA BAI |
BHARAT AND BHARATH PROPERTIES, B DEEPA, BINDU SHREE BHARATH C , ASHU BHANDARI, GAURAV BHANDARI BHARAT BHANDARI |
Pearl Peridot |
Bharat And Bharath Properties |
Bengaluru Urban |
Refund along with Penalty and Damages |
AUTHORITY
|
BENCH4
|
|
30 |
CMP/200909/0006548 |
09/09/2020
|
12/05/2023
|
ABHISHEK PACHISIA |
BHARAT AND BHARATH PROPERTIES, BHARAT C |
Pearl Peridot |
Bharat And Bharath Properties |
Bengaluru Urban |
Refund of amount paid along with interest and compensation for loss of time and Bank EMI |
AUTHORITY
|
BENCH4
|
|
31 |
CMP/181111/0001623 |
11/11/2018
|
09/05/2023
|
Karthik p s |
Ranjit Kumar Rajarajeshware Buildcon Private Limited |
Parasamani regency |
Rajarajeshwari build con pvt ltd |
Bengaluru Urban |
Interest payments for the delay |
AUTHORITY
|
BENCH4
|
|
32 |
CMP/181211/0001744 |
11/12/2018
|
06/05/2023
|
PURNIMA SIDDU BELKUD & SAROJANI SIDDAPPA BEKUD |
PRADEEP RAGHUNATH MADUSKAR |
GOURIJ - II |
PRADEEP RAGHUNATH MADUSKAR |
Belagavi (Belgaum) |
TO DIRECT RESPONDENT TO COMPLETE PROJECT OF GOURIJ |
AUTHORITY
|
BENCH4
|
|
33 |
CMP/211123/0008625 |
23/11/2021
|
06/05/2023
|
SATHISH THAMARAI SELVAN |
HEBRON PROPERTIES PVT LTD |
Hebron Avenue |
Hebron Properties Pvt Ltd |
Bengaluru Urban |
PLEASE DON'T PROVIDE ANY FURTHER EXTENSION TO THIS BUILDER AND REQUEST YOU TO TAKE SERIOUS ACTION ON THE BUILDER TO MAKE THEM COMPLETE THE PROJECT BY FEB 2022 |
AUTHORITY
|
BENCH4
|
|
34 |
CMP/220217/0009021 |
17/02/2022
|
06/05/2023
|
MANJUNATH KN & RAJANI AMARA |
HEBRON PROPERTIES PVT LTD |
Hebron Avenue |
Hebron Properties Pvt Ltd |
Bengaluru Urban |
Compensation along with Handing over of the Flat as per committed time lines. |
AUTHORITY
|
BENCH4
|
|
35 |
CMP/200718/0006202 |
18/07/2020
|
04/05/2023
|
DUNDAPPA KOTAGI |
AKSHAY TOWN YERIKOPPA |
Akshay Town Yerikoppa |
Suresh Enterprises Pvt.Ltd |
Dharwad |
Issue of agreement as per orders against complaint no. 1044 and payment of delay compensation. |
AUTHORITY
|
FULLBENCH
|
|
36 |
00048/2023 |
10/01/2023
|
03/05/2023
|
Sachin |
SHRIPROP PROJECTS PRIVATE LIMITED |
SHRIRAM SOUTHERN CREST |
SHRIPROP PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Request to get booking amount refund from the promotor |
AUTHORITY
|
BENCH6
|
|
37 |
CMP/211226/0008748 |
26/12/2021
|
02/05/2023
|
MR PAL SAMEER KUMAR ARABINDA |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity3C |
Mantri Developers Private Limited |
Bengaluru Urban |
I need compensation from the promoter/builder/developer @ INR 43000/- per month from 1st Jan2020 until the date of possession |
AUTHORITY
|
BENCH5
|
|
38 |
CMP/UR/200530/0005941 |
30/05/2020
|
02/05/2023
|
MR ERASH HOODA |
MR TAHA-CRM - M/S.GM INFINITE DWELLING |
GM INFINITE ORCHID ENCLAVE |
GM INFINITE |
Bengaluru Urban |
Agreement not Signed , requested for Refund |
AUTHORITY
|
BENCH5
|
|
39 |
CMP/UR/220921/0010038 |
21/09/2022
|
02/05/2023
|
SHRUTHI M KARTHA |
KSR PROPERTIES PVT LTD |
KSR CORDELIA |
KSR PROPERTIES PVT LTD |
Bengaluru Urban |
Flat registration to be done in my name |
AUTHORITY
|
BENCH4
|
|
40 |
CMP/UR/220321/0009184 |
21/03/2022
|
02/05/2023
|
PURAVANKARA LIMITED |
SYED MOHAMMED SHOAIB |
|
|
Bengaluru Urban |
To cancel the Agreement for Sale executed on 30-5-18 and registered as document no. JPN-1-01801-2018-19 in CD No. JPND517for the unit no. B1-1C-1404 and issue direction to concerned sub registrar acco |
AUTHORITY
|
BENCH4
|
|
41 |
CMP/211021/0008458 |
21/10/2021
|
02/05/2023
|
DWARKA NATH ALIAS DEVKI NANDAN |
STERLING URBAN DEVELOPMENTS PRIVATE LIMITED |
Sterling Villa Grande Phase II |
Sterling Urban Developments Private Limited |
Bengaluru Urban |
Possession of the Villa C-96 in the project named Sterling Villa Grand, waiver of Maintenance Charges, Compensation for delay in handing over possession till actual handover, compensation for harasmnt |
AUTHORITY
|
BENCH4
|
|
42 |
CMP/220607/0009595 |
07/06/2022
|
02/05/2023
|
VISHAL SHASHIKANT PATIL |
M.S SHYAMARAJU & CO (INDIA) PRIVATE LIMITED |
Republic of Whitefield (Phase 2) |
Shyamaraju & Co (India) Private Limited |
Bengaluru Urban |
Interest for delay in handing over possession. |
AUTHORITY
|
BENCH4
|
|
43 |
CMP/220613/0009616 |
13/06/2022
|
02/05/2023
|
SREENIVASULU GANDHAVALLA |
PURAVANKARA LIMITED |
Provident Woodfield |
Puravankara Limited |
Bengaluru Urban |
compensation for delay |
AUTHORITY
|
BENCH4
|
|
44 |
CMP/UR/210630/0008074 |
30/06/2021
|
29/04/2023
|
DEEPA K. V. |
VSZN INFRASTRUCTURE PVT. LTD. |
SAN CITY DISHA |
Vsan Infrastructure Pvt. Ltd. |
Bengaluru Urban |
Refund and Compensation of Rs.6,00,000/- along with interest and such other reliefs |
AUTHORITY
|
FULLBENCH
|
|
45 |
CMP/UR/210329/0007851 |
29/03/2021
|
29/04/2023
|
Sivanya R |
Navayuga Properties |
Auro Crystal |
Navayuga Properties |
Bengaluru Urban |
Refund and Compensation |
AUTHORITY
|
FULLBENCH
|
|
46 |
CMP/UR/210623/0008040 |
23/06/2021
|
29/04/2023
|
Deepa K V |
Vsan Infrastructure Pvt. Ltd. |
SAN CITY DISHA |
Vsan Infrastructure Pvt. Ltd. |
Bengaluru Urban |
Refund of Rs.6,00,000/- paid under the Memorandum of Understanding Agreement dated 12.12.2016 along with interest and such other reliefs |
AUTHORITY
|
FULLBENCH
|
|
47 |
CMP/UR/210729/0008171 |
29/07/2021
|
29/04/2023
|
SHIVAM DUBEY |
Brigade Enterprises Limited |
BRIGADE EXOTICA |
Brigade Enterprises Limited |
Bengaluru Urban |
Refund of the Token Amount i.e. 1.5 Lakh rs. |
AUTHORITY
|
FULLBENCH
|
|
48 |
CMP/UR/210104/0007385 |
04/01/2021
|
29/04/2023
|
Mahesh MC |
KBL builder |
raghavan pally property |
KBL builder |
Bengaluru Urban |
interest of return of advance after 3 years and 2 months |
AUTHORITY
|
FULLBENCH
|
|
49 |
CMP/UR/210103/0007383 |
03/01/2021
|
29/04/2023
|
Simpy Sinha |
SR Constructions |
Mana Foliage |
SR Constructions |
Bengaluru Urban |
I want my actual amount - 5 lakh + interest since I requested cancellation from land owner - SR Constructions. Please look into the issue. I am ready to file case in consumer court as well. |
AUTHORITY
|
FULLBENCH
|
|
50 |
CMP/UR/210813/0008242 |
13/08/2021
|
29/04/2023
|
Gurunath Krishnappa |
John Leonard Sequeira |
New Jerusalem Heights, Kinnigoli |
John Leonard Sequeira |
Bengaluru Urban |
Refund amount agreed on 28th March 2018, still not honored in entirity. |
AUTHORITY
|
FULLBENCH
|
|
51 |
CMP/UR/210104/0007388 |
04/01/2021
|
29/04/2023
|
Kirandeep Kaur |
S.Chandrashekar |
Hoskote New Homes, Emprasa Startup City,IT park |
S.Chandrashekar |
Bengaluru Urban |
Refund of Rs 14,44,713 with compensation. |
AUTHORITY
|
FULLBENCH
|
|
52 |
CMP/UR/210329/0007850 |
29/03/2021
|
29/04/2023
|
ketan patel |
jains villa vivianaa |
jains villa vivianaa |
Jains |
Bengaluru Urban |
refund of money and compensation for non delivery over 14 years |
AUTHORITY
|
FULLBENCH
|
|
53 |
CMP/181217/0001766 |
17/12/2018
|
29/04/2023
|
Mr. R Hiremath |
DIVYA INFRA PROPERTIES PVT LTD |
DIVYA JSR LIMELITE |
DIVYA INFRA PROPERTIES PVT LTD |
Bengaluru Urban |
Now sending |
AUTHORITY
|
FULLBENCH
|
|
54 |
CMP/210828/0008279 |
28/08/2021
|
29/04/2023
|
Tathagata Banerjee |
GREEN EARTH VENTURES |
GREEN EARTH ATRIUM |
GREEN EARTH VENTURES |
Bengaluru Urban |
Promoter should pay entire amount received from flats to pay to BWSSB to BWSSB. Remediate issues with STP. Honour 5 year warranty period as signed in sales agreement |
AUTHORITY
|
FULLBENCH
|
|
55 |
CMP/211003/0008413 |
03/10/2021
|
29/04/2023
|
K GOUTHAM SUBBAIAH |
Damden Properties |
Damden Vivo |
Damden Properties |
Bengaluru Urban |
Documents to be signed by the builder, Project to be completed AND handover the same at the earliest |
AUTHORITY
|
FULLBENCH
|
|
56 |
CMP/211215/0008727 |
15/12/2021
|
29/04/2023
|
SUDHIR GANGADHAR |
WINDSOR EDIFICES PRIVATE LIMITED |
WINDSOR TROIKA |
Windsor Edifices Private Limited |
Bengaluru Urban |
to direct the respondent for entire refund with profits, amounting to 21,14,500/- plus interest at 18% from the date of receiving amount, to the complainant, morefully prayed in the attachment |
AUTHORITY
|
BENCH4
|
|
57 |
CMP/220713/0009741 |
13/07/2022
|
29/04/2023
|
MRS SUSHREE SANGITA DALAI |
WINDSOR EDIFICES PRIVATE LIMITED |
WINDSOR TROIKA |
Windsor Edifices Private Limited |
Bengaluru Urban |
Builder shall be directed to hand over possession of my Flat No.1401-A without any further payment and also directed to pay compensation for delay in giving possession. |
AUTHORITY
|
BENCH4
|
|
58 |
CMP/210502/0007939 |
02/05/2021
|
28/04/2023
|
E R SURENDRAN |
CANOPY HOMES & HOLDINGS LLP |
SOUNDARYA PARADISE |
CANOPY HOMES & HOLDINGS LLP |
Bengaluru Urban |
RS. 100 LACS-REFUND OF MONEY PAID (RS.45 LACS) ,INTEREST ON BANK LOAN (13 LACS), COMPENSATION FOR MENTAL AGONY, LOSS , HARDSHIP (RS 21 LACS, INTEREST ON CAPITAL BLOCKED (RS 21 LACS) ., |
AUTHORITY
|
BENCH5
|
|
59 |
CMP/UR/200528/0005938 |
28/05/2020
|
28/04/2023
|
SWATI |
DREAMZ INFRA INDIA PVT LTD |
DREAMZ SHLOKA 2 |
DREAMZ INFRA INDIA PVT LTD |
Bengaluru Urban |
Project never started hence Need Refund money with interest towards booking cancellation |
AUTHORITY
|
BENCH5
|
|
60 |
CMP/UR/191031/0004594 |
31/10/2019
|
28/04/2023
|
PHILO PERIS |
B RAJSHEKHAR |
Elegant Berkely |
B. Rajashekar |
Bengaluru Urban |
Refund |
AUTHORITY
|
BENCH5
|
|
61 |
CMP/UR/190828/0004041 |
28/08/2019
|
28/04/2023
|
RAMIZA BANU |
GULAM MUSTAFA |
E-City Town Phase II |
GM Infinite Dwelling India Pvt Ltd |
Bengaluru Urban |
Refund of the amounts paid till date with interest |
AUTHORITY
|
BENCH5
|
|
62 |
CMP/UR/190904/0004064 |
04/09/2019
|
27/04/2023
|
FARAH SHAIKH |
SRI. GULAM MUSTAFA |
E-City Town Phase II |
GM Infinite Dwelling India Pvt Ltd |
Bengaluru Urban |
Refund with interest & compensation |
AUTHORITY
|
BENCH5
|
|
63 |
CMP/UR/191122/0004318 |
22/11/2019
|
27/04/2023
|
ANCY SUSAN ABRAHAM |
KOLTE PATIL DEVELOPERS LTD |
Kolte Patil Mirabilis |
Kolte Patil |
Bengaluru Urban |
Delay compensation from the builder per RERA rules |
AUTHORITY
|
BENCH5
|
|
64 |
CMP/201104/0007008 |
04/11/2020
|
27/04/2023
|
SYED NOBEL AHMED MUNER |
MANTRI WEBCITY 3B |
Mantri Webcity3B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in Facts of Case |
AUTHORITY
|
BENCH5
|
|
65 |
CMP/220207/0008976 |
07/02/2022
|
26/04/2023
|
Ipsita Banerjee |
SPL TOWERS PRIVATE LIMITED |
Shriram WYT Field -2 |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
We require a refund of my hard earned money of 1 lakh as I do not wish to enter into a sale agreement with Shriram Properties Wytfield Ph 2. |
AUTHORITY
|
BENCH6
|
|
66 |
CMP/UR/210322/0007819 |
22/03/2021
|
24/04/2023
|
S G Sambasivan |
M/S PRESTIGE ESTATES PROJECTS LIMITED |
Prestige White Meadows (but not registered by promoter) |
Prestige Estate Projects Limited |
Bengaluru Urban |
Register T4 or Block B of Phase 2 of Prestige White Meadows under RERA. Also pay a compensation for delayed delivery of 18 months amounting to Rs 52,32,320 |
AUTHORITY
|
BENCH4
|
|
67 |
CMP/UR/210623/0008041 |
23/06/2021
|
24/04/2023
|
Koshy Kuruvilla |
M/S PRESTIGE ESTATES PROJECTS LIMITED |
Prestige White Meadows |
Prestige Estates Projects Ltd. |
Bengaluru Urban |
(a) Promoter be required to register phase 2 of the project under Section 3 (1) of the Act as an ongoing project. (b) Promoter to pay balance interest under Section 18 (1) (a) of the Act. |
AUTHORITY
|
BENCH4
|
|
68 |
CMP/UR/210812/0008239 |
12/08/2021
|
24/04/2023
|
Nirmala Rao and Vishnu Vishwa Murthy |
M/S PRESTIGE ESTATES PROJECTS LIMITED |
Prestige White Meadows |
Prestige Estates Projects Limited |
Bengaluru Urban |
Direct the Developer to pay the compensation which we are entitled to |
AUTHORITY
|
BENCH4
|
|
69 |
CMP/200116/0005234 |
16/01/2020
|
24/04/2023
|
ARCHANA SINGH |
SHRIRAM PROPERTIES PRIVATE LIMITED |
SHRIRAM SAMEEKSHA |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delayed handover compensation for 2 years @ 1225 sq ft built up area at rate of Rs 5 per square foot per month for 24 months = Rs 147000 approx and 18% interest for non payment till date. |
AUTHORITY
|
BENCH4
|
|
70 |
CMP/200610/0006005 |
10/06/2020
|
24/04/2023
|
MEENAKSHI VENUGOPAL |
GOYAL HARIYANA REALTY |
ALANOVILLE |
Goyal Hariyana Realty |
Bengaluru Urban |
Your intervention is requested to get the builder to compensate us on account of interest charges as per the provisions of RERA act 2016. Also passing GST input tax credit as per Sec 171 of CGST act |
AUTHORITY
|
BENCH4
|
|
71 |
00021/2023 |
04/01/2023
|
24/04/2023
|
PRABHAKAR NAIK & POOJA PRABHAKAR NAIK |
FORTUNA URBANSCAPE PVT LTD |
FORTUNA WINDFLOWER |
FORTUNA URBANSCAPE PVT LTD |
Bengaluru Urban |
Even after making several requests SOHAN developer, Mr Murali refused to settle the case Hence RERA to expedite on settlement |
AUTHORITY
|
BENCH4
|
|
72 |
CMP/211124/0008627 |
24/11/2021
|
21/04/2023
|
ADITHYA BIKRAM MISHRA &DIBYA JYOTI MISHRA |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
(i) Direct the respondents to pay delay interest as per Section 16 of the provision of the Karnataka Real Estate Act. legal cost and compensation of Rs. 1500000/- |
AUTHORITY
|
FULLBENCH
|
|
73 |
CMP/210410/0007879 |
10/04/2021
|
21/04/2023
|
SURAJ JANARDAN GHARAT |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
Please request builder to pay me compensation same as the rent I need to pay due to delayed possesion |
AUTHORITY
|
FULLBENCH
|
|
74 |
CMP/220328/0009260 |
28/03/2022
|
21/04/2023
|
MOHIT GUPTA &SADHVI GUPTA |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
DELAY INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
75 |
CMP/210911/0008321 |
11/09/2021
|
21/04/2023
|
RIMSY SAINI &ROHIT SENGAR |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
To provide compensation for delayed project along with rental expense OTHERWISE honor the buyback from respondent along with interest in earliest time possible as per GOI norms. |
AUTHORITY
|
FULLBENCH
|
|
76 |
CMP/210406/0007872 |
06/04/2021
|
21/04/2023
|
SUMIT AHUJA |
FRONTIER SHELTERS PVT. LTD . |
COLUMBIA AALTIUS |
columbia developers pvt ltd |
Bengaluru Urban |
To refund Rs.4,87,500/- which is the sum after forfeiting the 10% of the booking amount of Rs.5,000 and return all the cheques and provide compensation. |
AUTHORITY
|
FULLBENCH
|
|
77 |
CMP/210621/0008017 |
21/06/2021
|
21/04/2023
|
SIDDHARTH KUMAR SRIVASTAVA &JYOTI SRIVASTAVA |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
Compensation against the delay in Flat Handover. ***I REPEAT I DO NOT WANT CANCELLATION or REFUND. *** |
AUTHORITY
|
FULLBENCH
|
|
78 |
CMP/210813/0008241 |
13/08/2021
|
21/04/2023
|
RAVI RAJ |
FRONTIER SHELTERS PVT. LTD . |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
Compensation for delay in posession as per rera rules, compensation for rent being paid due to deplay in possesion, speed up the contruction |
AUTHORITY
|
FULLBENCH
|
|
79 |
CMP/200805/0006312 |
05/08/2020
|
21/04/2023
|
MR.ARJUN R MENON |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
80 |
CMP/220805/0009855 |
05/08/2022
|
20/04/2023
|
PRAVEEN GOPINATHAN |
KOLTE PATIL DEVELOPERS LTD, DRA GROUP (DINESH RANKA) |
MIRABILIS |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
TO REFUND JOINTLY & SEVERALLY, A SUM TOTAL OF Rs 19701/- along with @18% interest PER ANNUM on this amount along with Rs 50,000/- as cost of this litigation. |
AUTHORITY
|
BENCH4
|
|
81 |
CMP/UR/190305/0002356 |
05/03/2019
|
20/04/2023
|
AKBAR ALI |
RAMS ASSOCIATES |
RAMS LAKE VIEW MEADOWS |
RAMS ASSOCIATES |
Bengaluru Urban |
Rs Thirty lakhs to be refunded as compensation |
AUTHORITY
|
BENCH5
|
|
82 |
CMP/200301/0005597 |
01/03/2020
|
20/04/2023
|
KUMAR RAHUL |
JANAPRIYA ENGINEERS |
Pinegrove |
Janapriya Engineers Syndicate Private Limited |
Bengaluru Urban |
Please direct the promoters to return money without any penalty and with any interest deemed appropriate by RERA authorities |
AUTHORITY
|
BENCH5
|
|
83 |
CMP/UR/210308/0007760 |
08/03/2021
|
19/04/2023
|
PRAKASH CHANDRA RAO ALUGGELU |
BABU ADIVEPPA |
Lilium Gardenia |
Dhammanagi Developerss Pvt. Ltd. |
Bengaluru Urban |
1) Adherence to sec 11 of RERA ACT and all its sub clauses until project completion & conveyance 2) compensation Rs. 1,00,000/- at 18% interest p/m from 15th Sept 2016 till completion & conveyance. |
AUTHORITY
|
FULLBENCH
|
|
84 |
CMP/200108/0005051 |
08/01/2020
|
19/04/2023
|
R.RAJASHEKARAN |
RADIANT STRUCTURE |
RADIANT ELITAIRE |
RADIANT STRUCTURES PVT LTD |
Bengaluru Urban |
Complete the Project within 60 days & compensate as per RERA |
AUTHORITY
|
BENCH5
|
|
85 |
CMP/200124/0005046 |
24/01/2020
|
19/04/2023
|
M.NAGARAJU |
RADIANT STRUCTURES PVT LTD |
RADIANT ELITAIRE |
RADIANT STRUCTURES PVT LTD |
Bengaluru Urban |
Complete the Project within 60 days & compensate as per RERA |
AUTHORITY
|
BENCH5
|
|
86 |
CMP/210406/0007866 |
06/04/2021
|
19/04/2023
|
MR.CHARUVIL MATHAI SAMUEL AND OTHERS |
M/S.SOBHA LIMITED |
Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6 |
SOBHA LIMITED |
Bengaluru Urban |
As we haven't been paid any interest/benefit on our payment of Rs.30.45 lakhs for period of 6 yrs, an interest/minimum bank rate be compensated. In addition to that an amount of Rs.3 lakhs be refunded |
AUTHORITY
|
BENCH5
|
|
87 |
CMP/211021/0008457 |
21/10/2021
|
18/04/2023
|
MS REMA.T |
M/S.VSAN INFRASTRUCTURE PVT LTD |
Kaveri |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
Refund full amount |
AUTHORITY
|
BENCH5
|
|
88 |
CMP/220408/0009329 |
08/04/2022
|
18/04/2023
|
ANUSHILA BRAHMA |
FRONTIER SHELTERS PVT. LTD |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
NEED RERA TO TAKE ACTION AGAINST THE BUILDER AND GET POSSESSION DONE AT THE EARLIEST AND ALSO MAKE THEM PAY THE COMPENSATION FOR THE DELAY |
AUTHORITY
|
FULLBENCH
|
|
89 |
CMP/220119/0008826 |
19/01/2022
|
18/04/2023
|
DHEERAJ KUMAR MISHTRA |
MEDA ETERNITY |
Meda Eternity |
MEDA ETERNITY |
Bengaluru Urban |
Fair and equal allocation of parking to all residents as per original plan. Fair Allocation of Visitor Car Parking as per original plan. Compensation from promoters for shortfall in number of parking |
AUTHORITY
|
BENCH5
|
|
90 |
CMP/210106/0007345 |
06/01/2021
|
17/04/2023
|
MR KANDATHIL MATHAI VERGHESE & MS.DHANYA MARY CHERIAN |
M/S.ZUARI INFRAWORLD INDIA LIMITED |
Zuari Garden city - Kaveri Apartments |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
Compensation refund penalty interest cancellation |
AUTHORITY
|
BENCH5
|
|
91 |
CMP/180903/0001220 |
03/09/2018
|
15/04/2023
|
ANUPAM SANTOSH |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in delivery of project ASAP. |
AUTHORITY
|
FULLBENCH
|
|
92 |
CMP/180904/0001223 |
04/09/2018
|
15/04/2023
|
ANIL KUMAR |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Delivery of the project or getting my money back |
AUTHORITY
|
FULLBENCH
|
|
93 |
CMP/180904/0001224 |
04/09/2018
|
15/04/2023
|
ANNAMALAI CHOCKLINGAM |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
to help us get our money or plot back with promis |
AUTHORITY
|
FULLBENCH
|
|
94 |
CMP/180904/0001227 |
04/09/2018
|
15/04/2023
|
PRASANNA TS NARAYANA |
EXCEL DWELINGS INDIA PVT.LTD . |
PRM/KA/RERA/1251/308/PR/180406/001470 |
NOT FOUND |
Bengaluru Urban |
To get delivery of 1 plot and ROI for 2 plots |
AUTHORITY
|
FULLBENCH
|
|
95 |
CMP/180913/0001266 |
13/09/2018
|
15/04/2023
|
RANJUL BALAKRISHNAN |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in Project delivery and compensation |
AUTHORITY
|
FULLBENCH
|
|
96 |
CMP/181002/0001342 |
02/10/2018
|
15/04/2023
|
GIRIPRASAD GORANTALA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
site as promised by builder or refund |
AUTHORITY
|
FULLBENCH
|
|
97 |
CMP/181002/0001341 |
02/10/2018
|
15/04/2023
|
RANGANATH BELLATTI |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Provide the site as builder promised or refund |
AUTHORITY
|
FULLBENCH
|
|
98 |
CMP/190120/0001914 |
20/01/2019
|
15/04/2023
|
TAPAN ACHARYA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
ON TIME DELIVERY OF THE PROJECT AS PROMISED |
AUTHORITY
|
FULLBENCH
|
|
99 |
CMP/190318/0002455 |
18/03/2019
|
15/04/2023
|
ANSHUMAN SINGH |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Refund from the builder |
AUTHORITY
|
FULLBENCH
|
|
100 |
CMP/181004/0001358 |
04/10/2018
|
15/04/2023
|
KRISHNA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
compensation and plot delivery |
AUTHORITY
|
FULLBENCH
|
|
101 |
CMP/190623/0003361 |
23/06/2019
|
15/04/2023
|
SRIRAM KONJETI |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Request for Refund for all the amounts we paid. |
AUTHORITY
|
FULLBENCH
|
|
102 |
CMP/180906/0001242 |
06/09/2018
|
15/04/2023
|
RAHUL GUPTA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in delivery of the project asap. |
AUTHORITY
|
FULLBENCH
|
|
103 |
CMP/180909/0001250 |
09/09/2018
|
15/04/2023
|
YOGESH ANKOLEKAR |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in delivery of project ASAP. |
AUTHORITY
|
FULLBENCH
|
|
104 |
CMP/180904/0001225 |
04/09/2018
|
15/04/2023
|
SHINDE UMESH A |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in delivery of project and ground rentalASAP |
AUTHORITY
|
FULLBENCH
|
|
105 |
CMP/180916/0001278 |
16/09/2018
|
15/04/2023
|
CAPT. RAJESH PATRO |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
LOCATE BUILDER AND HELP IN PROJECT COMPLETION |
AUTHORITY
|
FULLBENCH
|
|
106 |
CMP/181106/0001612 |
06/11/2018
|
15/04/2023
|
RAJNISH DHINGRA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
refund of the money with 15% PA interest |
AUTHORITY
|
FULLBENCH
|
|
107 |
CMP/181206/0001725 |
06/12/2018
|
15/04/2023
|
NIRMALA HARITHA KOCHERLA |
EXCEL DWELINGS INDIA PVT.LTD . |
Pebblecreek |
Excel Dwellings India Private Limited |
Bengaluru Urban |
Help in project delivery or money refund for plot |
AUTHORITY
|
FULLBENCH
|
|
108 |
CMP/210927/0008386 |
27/09/2021
|
15/04/2023
|
KISHAN LAL |
ARYAN HOMETEC PVT LTD |
ARYAN FOUNTAIN SQUARE |
ARYAN HOMETEC PVT LTD |
Bengaluru Urban |
CANCELLATION OF FLAT, RELEASE FROM HOME LOAN AND ALSO REFUND OFALL THE LOSSES AND DEPOSIT AMOUNT WITH INTEREST |
AUTHORITY
|
BENCH5
|
|
109 |
CMP/UR/190318/0002451 |
18/03/2019
|
13/04/2023
|
Kashinath J Naik |
V. NANDAGOPAL & OTHER PARTNERS, M/S TRANS CITY DEVELOPERS |
Orchid Paradise ,Trans Pragathi,Trans Trupthi |
Transcity Developers Bangalore |
Chikballapur |
Refund of money with compensation and 18% interest |
AUTHORITY
|
BENCH6
|
|
110 |
CMP/210303/0007727 |
03/03/2021
|
13/04/2023
|
AMAN DUTTA |
PARKWAY HOMES LLP |
PARKWAY HOMES |
PARKWAY HOMES LLP |
Bengaluru Urban |
Compensation for the delay in handover |
AUTHORITY
|
BENCH6
|
|
111 |
CMP/UR/220204/0008960 |
04/02/2022
|
13/04/2023
|
S M PRASANNA KUMAR |
TRANS CITY DEVELOPERS |
Trans North Edge |
M/s. Trans City Developers |
Chikballapur |
Order for refund of amount with interest |
AUTHORITY
|
BENCH6
|
|
112 |
CMP/UR/190505/0002917 |
05/05/2019
|
13/04/2023
|
MITESH JOSHI |
MANJUNATH REDDY, M/s AMR HOUSING DEVELOPMENT CORPORATION |
AMR OAK |
Manjunath Reddy |
Bengaluru Urban |
Need help to get possession of flat |
AUTHORITY
|
BENCH6
|
|
113 |
CMP/211205/0008682 |
05/12/2021
|
13/04/2023
|
Darshan B Vaadhool |
R K CONSTRUCTIONS |
R K ROYAL PALMS |
r k constructions |
Bengaluru Urban |
Considering the facts above, We request RERA to decide the right compensation for Delay from Builders end and ask for return of all amounts paid at the earliest. |
AUTHORITY
|
BENCH6
|
|
114 |
CMP/210204/0007570 |
04/02/2021
|
13/04/2023
|
KARNABIR DATTA AND JYOSTHREE SENGUPTA |
KRISHNA ENTERPRISES (HOUSING INFRASTRUCURES) INDIA PVT. LTD. |
KRISHNA MYSTIQ (PHASE-I) |
KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED |
Bengaluru Urban |
Delay interest, Delay compensation and damages for quality issues |
AUTHORITY
|
FULLBENCH
|
|
115 |
CMP/221104/0010179 |
04/11/2022
|
13/04/2023
|
DIPTI RANJAN NAYAK |
SPL TOWERS PRIVATE LIMITED |
Shriram WYT Field -2 |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Builder refusing to return the Booking/Token amount of 1 Lakh. Please look this matter seriously and help to to get my amount back. |
AUTHORITY
|
BENCH6
|
|
116 |
CMP/210630/0008079 |
30/06/2021
|
12/04/2023
|
MR.JAGDISH K DEVANANI & MS.KANNAYALAL K DEVNANI |
M/S.MANTRI DEVELOPERS PVT LTD & ANOTHER |
Mantri Centrium |
Mantri Developers Private Limited |
Bengaluru Urban |
REFUND OF THE ADVANCE AMOUNT PAID WITH INTEREST |
AUTHORITY
|
BENCH5
|
|
117 |
CMP/221112/0010244 |
12/11/2022
|
12/04/2023
|
Parijat Saurabh |
M/S. SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED |
SOWPARNIKA PURPLE ROSE |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. |
Bengaluru Urban |
Either allocate Flat or provide Compensation ( booking amount with interest) |
AUTHORITY
|
BENCH6
|
|
118 |
CMP/221112/0010254 |
12/11/2022
|
12/04/2023
|
Sujatha s |
SHRIPROP PROJECTS PRIVATE LIMITED |
SHRIRAM SOUTHERN CREST - Phase -2 |
SHRIPROP PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
paid to the builder directly on razorpay in the site office. we want refund from the sriram properties only. |
AUTHORITY
|
BENCH6
|
|
119 |
CMP/221107/0010211 |
07/11/2022
|
12/04/2023
|
Harsha Vardhana Reddy |
SHRIPROP DEVELOPERS PRIVATE LIMITED |
SHRIRAM LIBERTY SQUARE |
Shriprop Developers Private Limited |
Bengaluru Urban |
Refund of my money |
AUTHORITY
|
BENCH6
|
|
120 |
CMP/220408/0009326 |
08/04/2022
|
12/04/2023
|
MR MADHUSUDANA KUNIGAL VASUDEVAMURTHY |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia:::PRM/KA/RERA/1251/309/PR/171014/000439 |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
direction to the respondents to return entire payment of Rs.97,48,091/-, damages Rs.5,25,000/- and Rs.50,00,000/- towards mental agony |
AUTHORITY
|
BENCH5
|
|
121 |
CMP/220118/0008818 |
18/01/2022
|
11/04/2023
|
KURUVALLI RAJASEKHAR REDDY |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Compensation from builder |
AUTHORITY
|
BENCH4
|
|
122 |
CMP/220203/0008937 |
03/02/2022
|
11/04/2023
|
Darshan K U |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
123 |
CMP/220208/0008988 |
08/02/2022
|
11/04/2023
|
Gnanesh Murthy |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
124 |
CMP/220509/0009436 |
09/05/2022
|
11/04/2023
|
Shekhar Gupta |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
125 |
CMP/220203/0008943 |
03/02/2022
|
11/04/2023
|
Ajay Kashyap |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate project completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to loans and energy wasted following up with the builder. |
AUTHORITY
|
BENCH4
|
|
126 |
CMP/220202/0008916 |
02/02/2022
|
11/04/2023
|
Suresh Govindan |
M/s REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
127 |
CMP/UR/211027/0008476 |
27/10/2021
|
11/04/2023
|
SMT SUNANDA |
M/S NR GREENWOOD CONSTRUCTION PRIVATE LIMITED |
NR ORCHID GARDENIA |
M/s NR GREENWOOD CONSTRUCTION PRIVATE LIMITED |
Bengaluru Urban |
Issue an order directing the Opponent to execute the registered sale deed in favour of the complainant in respect of the Schedule Property as per the terms and conditions of the agreement of sale |
AUTHORITY
|
BENCH4
|
|
128 |
CMP/UR/201109/0006939 |
09/11/2020
|
11/04/2023
|
MUNIREDDY Y |
DR S RAVI AND DR V NANDAGOPAL |
Transcity developers |
V nandagopal and S ravi |
Bengaluru Urban |
Please help me by getting back my full money Rs294000 with interest. |
AUTHORITY
|
BENCH4
|
|
129 |
CMP/UR/211111/0008537 |
11/11/2021
|
10/04/2023
|
RAMYA D R |
UMESH |
C V Developers site allotment |
C V Developers |
Bengaluru Urban |
We request RERA to help us to get the amount of 2,50,000 refund to us from the Developers |
AUTHORITY
|
BENCH4
|
|
130 |
CMP/UR/210809/0008225 |
09/08/2021
|
10/04/2023
|
MS.MONA JAFFER |
M/S.ELEGANT PROPERTIES |
Elegant Altis |
Elegant Properties |
Bengaluru Urban |
For Delivery of the apartment duly completed in a time bound manner together with compensation for delay OR in the alternative compensation of 1 Crore. |
AUTHORITY
|
BENCH5
|
|
131 |
CMP/UR/210809/0008226 |
09/08/2021
|
10/04/2023
|
MR.MOHAMMED NAEMUDDIN KHUDDUS |
M/S.ELEGANT PROPERTIES |
Elegant Altis |
Elegant Properties |
Bengaluru Urban |
For Delivery of the apartment duly completed in a time bound manner together with compensation for delay OR in the alternative compensation of 1Crore. |
AUTHORITY
|
BENCH5
|
|
132 |
CMP/191028/0004570 |
28/10/2019
|
10/04/2023
|
POOJA SANTOSH JOSEPH |
SR RAM CHIRIPING WOOODS |
Shriram Chirping Woods |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Urban |
Original Flat or Compensation & Adjustments |
AUTHORITY
|
FULLBENCH
|
|
133 |
CMP/220825/0009935 |
25/08/2022
|
06/04/2023
|
TULASI RAM THOTA |
FRONTIER SHELTERS PVT LTD |
FRONTIER HEIGHTS |
FRONTIER SHELTERS PVT LTD |
Bengaluru Urban |
Requesting RERA authorities to administer builder to compensate customers for the house loan EMI’s paid and upcoming EMI’s till the flat is given possession with OC |
AUTHORITY
|
BENCH4
|
|
134 |
CMP/210731/0008191 |
31/07/2021
|
06/04/2023
|
L AND T RAINTREE BOULEVARD ALLOTIES WELFARE ASSN. |
L & T CONSTRUCTION EQUIPMENT LTD. |
LTCEL RAINTREE BOULEVARD CL1 |
L&T Construction Equipment Ltd |
Bengaluru Urban |
Action against Respondent for all violations of the provisions of the Act |
AUTHORITY
|
FULLBENCH
|
|
135 |
CMP/220408/0009331 |
08/04/2022
|
06/04/2023
|
SHAHED HASSAN KHALEEL |
MANTRI DEVELOPERS PRIVATE LIMITED |
Mantri Centrium |
Mantri Developers Private Limited |
Bengaluru Urban |
To direct the Respondent to cancel the Agreement of Sale, Construction Agreement and refund the entire amount of Rs. 5,94,09,054 /- and to pay the EMIs until the Complainant receives the entire paymen |
AUTHORITY
|
BENCH6
|
|
136 |
CMP/UR/211021/0008461 |
21/10/2021
|
06/04/2023
|
Koushal Su |
AB PROPERTIES |
AB Phase 2 in Nelamangala |
AB Properties |
Bengaluru Rural |
Request you to get us the to KHATA of Site done at the earliest or get us the refund of amount paid to AB Properties. |
AUTHORITY
|
BENCH6
|
|
137 |
CMP/UR/211016/0008443 |
16/10/2021
|
06/04/2023
|
RAGHUNATH D |
SURESH V, M/S DURGA SHREE VENTURES |
M/s Durga Shree Ventures |
Sri SURESH V |
Bengaluru Rural |
To direct the said firm to immediately refund the said amount to me together with interest to my present address |
AUTHORITY
|
BENCH6
|
|
138 |
CMP/200131/0005301 |
31/01/2020
|
06/04/2023
|
Yudhish Gupta |
YUDHISH GUPTA |
|
|
Bengaluru Urban |
Delay compensation with interest and Rent paid for 2 years due to delay |
AUTHORITY
|
BENCH6
|
|
139 |
CMP/UR/220404/0009310 |
04/04/2022
|
06/04/2023
|
BENEDICTA CASTALINO |
VALERIAN P LOBO - T3 URBAN DEVELOPERS LTD |
T3 URBAN DEVELOPERS LTD |
VALERIAN P LOBO |
Dakshina Kannada |
YES, Refund of Rs 18.00 lakh including interest from date of final payment |
AUTHORITY
|
BENCH6
|
|
140 |
CMP/UR/220324/0009242 |
24/03/2022
|
06/04/2023
|
Sumanth Suresh Hassan |
JAGADISH DEVARAJ |
SVC Orchid |
Jagadish Devaraj |
Bengaluru Urban |
Refund of amount paid along with interest and compensation |
AUTHORITY
|
BENCH6
|
|
141 |
CMP/201007/0006710 |
07/10/2020
|
06/04/2023
|
S RAJA |
ARV INFRASTRUCTURES |
Temple Tree |
ARV Infrastructres |
Bengaluru Urban |
To help in registration of the flat . Compensation for untold miseries , hardship , mental trauma and stress. |
AUTHORITY
|
BENCH6
|
|
142 |
CMP/UR/201217/0007251 |
17/12/2020
|
06/04/2023
|
Aman Saxena |
SOUTHERN HERITAGE BUILDERS AND DEVELOPERS |
RESIDENCY PARK |
SOUTHERN HERITAGE BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Grievance Number: 1735214, please have builder clear my flat (B-006) title and please blacklist him and block all his ongoing projects. |
AUTHORITY
|
BENCH6
|
|
143 |
CMP/UR/220510/0009441 |
10/05/2022
|
06/04/2023
|
A Vasu |
SAI REALTORS |
Sai City New |
SAI REALATORS |
Bengaluru Urban |
Refund the Land Amount along with delay in Compensation |
AUTHORITY
|
BENCH6
|
|
144 |
CMP/UR/220325/0009252 |
25/03/2022
|
06/04/2023
|
Puttaraju T |
SREEKANTH DAS - SREE SAPTHAMATHRUKA DEVELOPERS |
Sree Sapthamathruka Developers Rera: PRM/KA/RERA/1268/378/PR/190719/002693, dated 19-07-2019 |
Sreekanth Das |
Mysore |
Refund with compensation for delay.. |
AUTHORITY
|
BENCH6
|
|
145 |
CMP/UR/220510/0009440 |
10/05/2022
|
06/04/2023
|
A Vani |
SAI REALTORS |
Sai City New |
SAI REALATORS |
Bengaluru Urban |
Refund the Land Amount along with delay in Compensation |
AUTHORITY
|
BENCH6
|
|
146 |
CMP/UR/210915/0008333 |
15/09/2021
|
06/04/2023
|
Santanu Maji |
GOLDEN GATE PROPERTIES LIMITED |
Golden Days |
Golden Gate Properties Ltd |
Bengaluru Urban |
Request for refund of booking amount, Rs 300000 (three lakh) with compensation. Compensation includes composite interest of the three-lakh booking amount at a rate of 15% per year. |
AUTHORITY
|
BENCH6
|
|
147 |
CMP/UR/210827/0008275 |
27/08/2021
|
06/04/2023
|
Pavamanapura layout |
ANITHA BABU RAO |
PAVAMANAPURA LAYOUT SECOND STAGE |
Anitha LAKSHMINARASIMHA BABU |
Bengaluru Urban |
We request Hon'ble Authority to direct Promoter to execute the rectification deed with actual site dimension. |
AUTHORITY
|
BENCH6
|
|
148 |
CMP/UR/210816/0008247 |
16/08/2021
|
06/04/2023
|
ATUL JAIN |
NAZIM PASHA; SYED ANSAR PASHA; |
IT ESTATES |
Ravi Nallur Doreswamy |
Bengaluru Urban |
Request RERA to take prompt action against the fraud builder and provide us justice in form of recovery of money or flat in the project. Meanwhile ban the Builder and its projects from dealings |
AUTHORITY
|
BENCH6
|
|
149 |
CMP/220329/0009280 |
29/03/2022
|
06/04/2023
|
SHRUTHI |
NAVAM BUILDERS |
NAVAM'S BLUEBERRY HEIGHTS' |
NAVAM BUILDERS |
Dakshina Kannada |
WE REQUEST RERA TO TAKE IMMEDIATE ACTION FOR REFUND OF MONEY FOR NON-DELIVERY OF THE APARTMENTS ON TIME. |
AUTHORITY
|
BENCH6
|
|
150 |
CMP/220322/0009237 |
22/03/2022
|
06/04/2023
|
MIR SABER ALI |
KRUTHI DEVELOPERS |
SAI CAMBRIDGE RESIDENCY |
kruthi developers |
Bengaluru Urban |
Request RERA to help me in getting compensation for loss of terrace area and certain amenities. |
AUTHORITY
|
BENCH6
|
|
151 |
CMP/220321/0009231 |
21/03/2022
|
06/04/2023
|
Shyam Ganesh K |
VISHWAM PROJECTS |
Vishwam Projects |
Vishwam Projects |
Bengaluru Urban |
Please ask the builder to fix the issue at the earliest. |
AUTHORITY
|
BENCH6
|
|
152 |
CMP/220307/0009083 |
07/03/2022
|
06/04/2023
|
OSURI DEVENDRA PHANIKAR |
SUPERTECH LIMITED |
Supertech Micasa |
SUPERTECH LIMITED |
Bengaluru Urban |
Action against the Respondent in CMP/190225/0002280 under section 63 and 69(1) of RERA Act 2016 is prayed for in order to weed out unscrupulous Promoters from the arena of Real Estate business |
AUTHORITY
|
BENCH6
|
|
153 |
CMP/UR/211206/0008690 |
06/12/2021
|
06/04/2023
|
Santosh Kumar Awasthi and Sumedha Awasthi |
TGS CONSTRUCTIONS PRIVATE LIMITED |
TGS ROCKFORD |
TGS Constructions Private Limited |
Bengaluru Urban |
Request for refund of Rs 690000 with interest on grounds of father's death and elderly mother's poor health condition. |
AUTHORITY
|
BENCH6
|
|
154 |
CMP/UR/190512/0002991 |
12/05/2019
|
05/04/2023
|
GANESHA KOGGU NAIK |
EXCEL DWELLINGS INDIA PVT LTD |
Pebble Creek |
Excel Dwellings India Pvt Ltd |
Bengaluru Urban |
Return back our money spent with due interest |
AUTHORITY
|
BENCH4
|
|
155 |
CMP/201126/0006906 |
26/11/2020
|
05/04/2023
|
SHRISHA KODANCHA |
HOYSALA PROJECTS PRIVATE LIMITED |
Hoysala Ace-II |
Hoysala Projects Private Limited |
Bengaluru Urban |
Direct the Respondent to pay delay compensation and damages till the date of receipt of Occupancy Certificate. Direct the Respondent to complete the construction at the earliest and form Association. |
AUTHORITY
|
BENCH4
|
|
156 |
CMP/220520/0009498 |
20/05/2022
|
05/04/2023
|
Xavier Mascarenhas |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Return all the money paid along with applicable interest rate based interest payments and penalties back to me |
AUTHORITY
|
BENCH6
|
|
157 |
CMP/220420/0009374 |
20/04/2022
|
05/04/2023
|
Shailendra Jain & Ruchi Jain |
Shrivision Towers Private limited |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Need RERA's immediate attention and action on builder to get us some relief, please put some pressure on builder to make some good progress and plan to deliver our home soon + compensation |
AUTHORITY
|
BENCH6
|
|
158 |
CMP/210217/0007149 |
17/02/2021
|
05/04/2023
|
AARATHI ALAT SAJEEV &NIJIL KUMAR K P |
B VEENAVANI |
SAI SUNSHINE |
B VEENAVANI |
Bengaluru Urban |
Payment of compensation of Rs.45,00,000/- with interest at 18% from the date of payment till actual payment due to non- completion of the project and the mental agony caused to the Complainants |
AUTHORITY
|
FULLBENCH
|
|
159 |
00123/2023 |
31/01/2023
|
05/04/2023
|
Chintu Varkey |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0001 along with refund of Rs. 31,00,089/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
AUTHORITY
|
BENCH4
|
|
160 |
00124/2023 |
31/01/2023
|
05/04/2023
|
Chintu Varkey |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0091 along with refund of Rs. 10,05,302/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
AUTHORITY
|
BENCH4
|
|
161 |
CMP/200712/0006143 |
12/07/2020
|
03/04/2023
|
Shiladitya Patnaik |
LILY REALTY PVT LTD |
Pashmina Waterfront -Phase-I |
Lily Realty Pvt Ltd |
Bengaluru Urban |
Completion and handover of my flat and adequate compensation for the delay |
AUTHORITY
|
BENCH6
|
|
162 |
CMP/200925/0006664 |
25/09/2020
|
03/04/2023
|
Arun Ramasubramanian |
LILY REALTY PRIVATE LIMITED |
Pashmina Waterfront -Phase-I |
Lily Realty Pvt Ltd |
Bengaluru Urban |
Compensation, Refund, Completion of pending works |
AUTHORITY
|
BENCH6
|
|
163 |
CMP/200925/0006665 |
25/09/2020
|
03/04/2023
|
H Subramanian and Pushpa Subramanian |
LILY REALTY PRIVATE LIMITED |
Pashmina Waterfront -Phase-I |
Lily Realty Pvt Ltd |
Bengaluru Urban |
Compensation, Refund, Completion of pending work |
AUTHORITY
|
BENCH6
|
|
164 |
CMP/UR/201231/0007372 |
31/12/2020
|
03/04/2023
|
P SIVARAJ |
MR. S G BHARATH @ BHARATH REDDY |
Aryan Hometec Pvt Ltd |
Mr. S G Bharath @ Bharath Reddy |
Bengaluru Urban |
Amount Refund As Early As Possible. |
AUTHORITY
|
BENCH4
|
|
165 |
CMP/UR/220201/0008889 |
01/02/2022
|
03/04/2023
|
SRIRAM GANESHAN |
CANOPY ESTATES (P) LTD., |
CANOPY CLASSIC |
CANOPY ESTATES (P) LTD., |
Bengaluru Urban |
Non completion of the project as per the Joint Development Agreement dated 17-06-2010 |
AUTHORITY
|
BENCH4
|
|
166 |
CMP/UR/220601/0009569 |
01/06/2022
|
03/04/2023
|
VINAY NIRANJAN |
BANGALORE DEVELOPMENT AUTHORITY |
BDA GUNJUR Phase 2 Flats |
Bangalore Development Authority |
Bengaluru Urban |
Amenities, project complition, BESCOM connections |
AUTHORITY
|
BENCH4
|
|
167 |
CMP/220607/0009596 |
07/06/2022
|
03/04/2023
|
SAI SANKAR BALIVADA |
KOLTE PATIL DEVELOPERS LTD |
MIRABILIS |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
May please instruct M/s Kolte Patil to refund Booking amount |
AUTHORITY
|
BENCH4
|
|
168 |
CMP/220721/0009791 |
21/07/2022
|
03/04/2023
|
ARUN PATIL |
PURAVANKARA LIMITED |
Purva Coronation Square |
Puravankara Limited |
Bengaluru Urban |
Interest on delay and other compensation as per RERA Act. |
AUTHORITY
|
BENCH4
|
|
169 |
CMP/UR/220725/0009799 |
25/07/2022
|
03/04/2023
|
PRASAD PRABHAKARAN |
JAIN HEIGHTS AND STRUCTURES PVT LTD |
Landstar Earth Shine |
Jain Heights and Structures Pvt Ltd |
Bengaluru Urban |
Builder can take back the plot and pay back land value plus interest from HL and adequate compensation |
AUTHORITY
|
BENCH4
|
|
170 |
CMP/UR/220727/0009818 |
27/07/2022
|
03/04/2023
|
KARTHIK N |
SRI RAMAKRISHNA ENTERPRISE |
Garuda Estilo Homes |
Sri Ramakrishna Enterprise |
Bengaluru Urban |
Kindly direct builder Shri.K.Srinivasulu & Ramakrishna entp. to provide legal documents i.e,NOC,OC to the buyers,allot parking lot to the buyers & Form owner association & hand it over to the owners. |
AUTHORITY
|
BENCH4
|
|
171 |
CMP/UR/220826/0009953 |
26/08/2022
|
03/04/2023
|
ASHISH CHATURVEDI |
KEY MANSIONS PVT LTD |
|
|
Bengaluru Urban |
In addition to the promised money i.e., INR 176,000, I also want an interest to be paid for the delay caused. |
AUTHORITY
|
BENCH4
|
|
172 |
CMP/UR/220919/0010024 |
19/09/2022
|
03/04/2023
|
MAHIPAL SINGH |
DEVI MANUPATI |
DEVI GRANDS |
DEVI MANUPATI |
Bengaluru Urban |
REQUEST YOU TO KINDLY HELP US IN GETTING THE REFUND . |
AUTHORITY
|
BENCH4
|
|
173 |
CMP/UR/220919/0010025 |
19/09/2022
|
03/04/2023
|
JATIN S VALECHA |
MRS.PRIYANKA KANUPURU |
Silver Serenity |
Mrs.Priyanka Kanupuru |
Bengaluru Urban |
direct the Respondent to provide basic amenities such as back up generator lift permanent electricity connection BWSSB connection occupancy certificate and damages of RS.5 Lakhs. |
AUTHORITY
|
BENCH4
|
|
174 |
CMP/220919/0010026 |
19/09/2022
|
03/04/2023
|
RAGHAVENDRA GL |
M/S.CANDEUR CONSTRUCTIONS |
CANDEUR SIGNATURE |
M/s.CANDEUR CONSTRUCTIONS |
Bengaluru Urban |
Refund |
AUTHORITY
|
BENCH4
|
|
175 |
CMP/220921/0010036 |
21/09/2022
|
03/04/2023
|
VIKRAMADITYA GOYAL |
HOSKOTE NEO HOMES LIMITED |
Emprasa Startup City - Residential |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
Full Refund of Pre-Emi, Loan EMI and Insurance Amount paid thru NBFC and Property Registration |
AUTHORITY
|
BENCH4
|
|
176 |
CMP/220512/0009453 |
12/05/2022
|
03/04/2023
|
KANTHARAJU C |
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED., (2) SREE SAPTHAMATHRUKA 5 & NANDI NAGAR. |
Sree Sapthamathruka 5 & Nandi Nagara |
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED |
Mysore |
Refund with interest and rental compensation. |
AUTHORITY
|
BENCH4
|
|
177 |
CMP/220120/0008841 |
20/01/2022
|
03/04/2023
|
Kanthi Kiran Durga Venkata Narayanashetty |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
To levy penalty of 5% of project cost on developer |
AUTHORITY
|
FULLBENCH
|
|
178 |
CMP/220120/0008837 |
20/01/2022
|
03/04/2023
|
Smita Narendranth |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
To levy Penalty of 5% on developer for non-compliance of AO order |
AUTHORITY
|
FULLBENCH
|
|
179 |
CMP/220120/0008839 |
20/01/2022
|
03/04/2023
|
Sreeram Reddy |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
INTERIM PRAYERS The Complainant humbly PRAYS that this Hon’ble RERA authority be pleased to grant an interim order by directing: The respondents, before filing their appearance for defending this |
AUTHORITY
|
FULLBENCH
|
|
180 |
CMP/210323/0007824 |
23/03/2021
|
03/04/2023
|
Manzar Imam & 4 others |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
INTERIM PRAYER: To direct the respondents to immediately & jointly register the respective Sale Deeds of the individual apartments & levy 5% penalty on respondents |
AUTHORITY
|
FULLBENCH
|
|
181 |
CMP/220120/0008840 |
20/01/2022
|
03/04/2023
|
Satyakam Vashisth |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
INTERIM PRAYERS The Complainant humbly PRAYS that this Hon’ble RERA authority be pleased to grant an interim order by directing: i. The respondents, before filing their appearance for defending this s |
AUTHORITY
|
FULLBENCH
|
|
182 |
CMP/220119/0008831 |
19/01/2022
|
03/04/2023
|
Manzar Imam |
M/S BUOYANT TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS |
Mantri Manyata Lithos |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
view of the facts & grounds mentioned above, the complainant prays this Hon’ble RERA Authority be pleased allow this complaint &; i. Order the release of the deposit of Rs. 48,27,6 and other reliefs |
AUTHORITY
|
FULLBENCH
|
|
183 |
CMP/200908/0006538 |
08/09/2020
|
03/04/2023
|
VIKASH KUMAR JALAN |
BOLLINENI DEVELOPERS LTD. |
BOLLINENI SILAS |
BOLLINENI DEVELOPERS LTD |
Bengaluru Urban |
Compensation for all these issues |
AUTHORITY
|
FULLBENCH
|
|
184 |
CMP/200629/0006098 |
29/06/2020
|
03/04/2023
|
vijaya kumar |
shree kateeleshwari innovation projects |
ATHIKARI ACROPOLIS |
shree kateeleshwari innovative projects |
Bengaluru Urban |
a) To direct the respondents to execute and register a proper deed of conveyance in respect of premises immediately as per law |
AUTHORITY
|
BENCH5
|
|
185 |
00219/2023 |
21/02/2023
|
31/03/2023
|
Sobhana Priyadarshani |
AKARSHA REALTY PRIVATE LIMITED |
ADARSH PARK HEIGHTS PHASE 1 |
AKARSHA REALTY PRIVATE LIMITED |
Bengaluru Urban |
Delay of Refund- To get a full refund of the amount paid along with interest. |
AUTHORITY
|
BENCH4
|
|
186 |
00022/2023 |
04/01/2023
|
30/03/2023
|
POOJA PRABHAKAR NAIK |
PURAVANKARA LIMITED |
Purva Sunflower |
Puravankara Limited |
Bengaluru Urban |
All the money paid along with the interest as per RERA guidelines may be returned since the delays is more than one year! |
AUTHORITY
|
BENCH4
|
|
187 |
CMP/220805/0009856 |
05/08/2022
|
30/03/2023
|
SHARNABASAPPA |
BASAVARAJ MALLIKARJUJN YEREGAL |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
188 |
CMP/200715/0006153 |
15/07/2020
|
27/03/2023
|
MR JOSEPH MATHIAS |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
189 |
CMP/211018/0008448 |
18/10/2021
|
27/03/2023
|
NITHYA CHELLAM |
INNER SPACES |
Meadow in the sun |
Inner spaces |
Bengaluru Urban |
Refund or Compensation |
AUTHORITY
|
BENCH5
|
|
190 |
CMP/220223/0009052 |
23/02/2022
|
27/03/2023
|
DIGVIJAY BARAPATRE & POOJITHA KR |
M/S.ALLAM INFINITE INDIA PRIVATE LIMITED |
GM AMBITIOUS ENCLAVE |
M/s. Allam Infinite India Private Limited |
Bengaluru Urban |
Refund of the amount and delay compensation |
AUTHORITY
|
BENCH5
|
|
191 |
CMP/UR/200827/0006331 |
27/08/2020
|
27/03/2023
|
MR SRIRAM PADMANABHAN |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity |
Mantri |
Bengaluru Urban |
Cancellation of Agreement of sale and refund |
AUTHORITY
|
BENCH5
|
|
192 |
CMP/220310/0009103 |
10/03/2022
|
27/03/2023
|
HARIHARAN |
SRI CHOWDWSHWARI PROJECTS |
Thirumala lakshmi vaibav |
Sri Chowdeshwari Projects |
Bengaluru Urban |
Directing the Respondent to refund the entire part of sale consideration, amount paid towards EMI’s towards housing loan obtained |
AUTHORITY
|
BENCH5
|
|
193 |
CMP/211215/0008732 |
15/12/2021
|
27/03/2023
|
SUNNY GARG |
TGR PROJECTS INDIA PVT LTD |
Ankshu Ecstasy |
TGR Projects India Pvt Ltd |
Bengaluru Urban |
Order for refund and Compensation |
AUTHORITY
|
BENCH4
|
|
194 |
CMP/220204/0008956 |
04/02/2022
|
24/03/2023
|
M N ANANTHA |
PEARL COMMUNITY ONE DEVELOPERS PRIVATE LIMITED |
PALM VISTAS |
PEARL COMMUNITY ONE DEVELOPERS PVT LTD |
Bengaluru Urban |
direct the builder to complete the Villa project, register, hand over the possession of the Villa Unit AW-10 within 3 months and compensate for delay |
AUTHORITY
|
BENCH6
|
|
195 |
CMP/210727/0008167 |
27/07/2021
|
24/03/2023
|
Anil Sthanunathan Iyer |
VASWANI WHITEFIELD PROJECTS PRIVATE LIMITED; MR.DAMACHARLA JANARDHAN RAO |
Vaswani Exquisite-Phase One |
Vaswani Whitefield Projects Pvt Ltd |
Bengaluru Urban |
Direct the respondents to refund to the complainants Rs.5,00,000/- with interest at the rate of 9% P.A calculated from the date of payment till the date of realisation + damages of Rs.1,00,000/- |
AUTHORITY
|
BENCH6
|
|
196 |
CMP/190112/0001852 |
12/01/2019
|
24/03/2023
|
SUDIR PILLAI |
SHOBHA LTD. |
Sobha City - Casa Paradiso Block 4 |
Sobha Limited |
Bengaluru Urban |
Delivery of apartment and registration ofagreement |
AUTHORITY
|
FULLBENCH
|
|
197 |
CMP/UR/191017/0004344 |
17/10/2019
|
23/03/2023
|
kiran kampli |
MAXWORTH REALTY INDIA LIMITED |
Max orchids 3 |
Maxworth realty India limited |
Bengaluru Urban |
paid amount of INR 2,90,656 with interest. |
AUTHORITY
|
BENCH6
|
|
198 |
CMP/UR/211028/0008481 |
28/10/2021
|
23/03/2023
|
Puravankara Limited |
Amish Kumar JHA |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 14.09.2018 bearing registration number for apartment no. B1-1D-406 |
AUTHORITY
|
BENCH4
|
|
199 |
CMP/UR/211028/0008482 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
ASHOK KUMAR PARASMAL |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 30.06.2018 bearing registration number JPN-1-03110-2018-19 for apartment no. B1-1C-405. |
AUTHORITY
|
BENCH4
|
|
200 |
CMP/UR/211028/0008483 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
AVINASH BHANDARI |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 30.10.2018 bearing registration number JPN-1-07681-2018-19 for apartment no. B2-2E-405. |
AUTHORITY
|
BENCH4
|
|
201 |
CMP/UR/211028/0008485 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
KIRAN KUMAR |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 28.09.2018 bearing registration number JPN-1-06788-2018-19 for Apartment no. B2-2E-102. |
AUTHORITY
|
BENCH4
|
|
202 |
CMP/UR/211028/0008486 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
ARUN RAJ |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 03.09.2018 bearing registration number JPN-1-05767-2018-19 for apartment no. B4-4A-1402. |
AUTHORITY
|
BENCH4
|
|
203 |
CMP/UR/211028/0008487 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
K.M.ANANDA REDDY |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 25.10.2018 bearing registration number JPN-1-07525-2018-19 for apartment no. B1-1D-602 |
AUTHORITY
|
BENCH4
|
|
204 |
CMP/UR/211028/0008488 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
VISHWESH SINGH |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 16.10.2018 bearing registration number JPN-1-06788-2018-19 for apartment no. B3-3E-904 |
AUTHORITY
|
BENCH4
|
|
205 |
CMP/UR/211028/0008489 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
SUDHANSHU KUMAR |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 26.07.2018 bearing registration number JPN-1-04297-2018-19 for apartment no. B1-1D-507 |
AUTHORITY
|
BENCH4
|
|
206 |
CMP/UR/211028/0008490 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
SHIVANA GOWDA S PATIL |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 16.10.2018 bearing registration number JPN-1-07304-2018-19 for Apartment no. B4-4B-203 |
AUTHORITY
|
BENCH4
|
|
207 |
CMP/UR/211028/0008493 |
28/10/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
LESLIE DSOUZA |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 22.10.2018 bearing registration number JPN-1-07431-2018-19 for apartment no. B3-3E-508 |
AUTHORITY
|
BENCH4
|
|
208 |
CMP/UR/211119/0008588 |
19/11/2021
|
23/03/2023
|
PURAVANKARA LIMITED |
ARWA HAKIMUDDIN YUSUF |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 09.08.2018 bearing registration number JPN-1-04672-2018-19 for apartment no. B3-3E-808. |
AUTHORITY
|
BENCH4
|
|
209 |
CMP/220818/0009911 |
18/08/2022
|
21/03/2023
|
SantoshKumar N V |
Raja Housing Limited |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Need Compensation amount from Sept 2020 till date |
AUTHORITY
|
BENCH6
|
|
210 |
CMP/220118/0008821 |
18/01/2022
|
21/03/2023
|
Rajashree Kamath |
Golden Gate Properties Limited |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Delay compensation in order to cover our losses, and early completion of project. |
AUTHORITY
|
BENCH6
|
|
211 |
CMP/220102/0008762 |
02/01/2022
|
21/03/2023
|
Nagendra Padiyara |
Golden Gate Properties Limited |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Delay Compensation as per RERA, Project Completion must be before 31 March, 2022 |
AUTHORITY
|
BENCH6
|
|
212 |
CMP/UR/200611/0005978 |
11/06/2020
|
21/03/2023
|
Gnanasekar Velusamy |
SRK INFRA PROJECTS PRIVATE LIMITED |
THE ESTATES |
SRK Infra Projects Pvt. Ltd. |
Bengaluru Urban |
Direct the Respondent to refund the deposit of Rs.12,00,000/- together with interest at the rate of 15 % per annum from the date of withdrawal/cancellation on 11th November 2019 |
AUTHORITY
|
BENCH6
|
|
213 |
CMP/221221/0010496 |
21/12/2022
|
21/03/2023
|
PRAVEEN SREEKUMARAN NAIR |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
Casagrand Florella |
Casa Grande Garden City Builders Private Limited |
Bengaluru Urban |
1. Builder to deliver what's advertised and mentioned in the sale agreement 2. Builder to compensate for the land that used for the common amenities which was not mentioned in the sale agreement |
AUTHORITY
|
BENCH5
|
|
214 |
CMP/211115/0008566 |
15/11/2021
|
20/03/2023
|
MADHU PANDEY |
SJR PRIMECORPORATION PVT LTD D LAKANNA MS MEENAKSHI GOVINDA IRUDIYA RAJ NAGESH K |
SJR PRIMECORPORATION PVT LTD Palazzacity |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
pay over damages as per Karnatka Real Estate rule, 2017 , thereunder which at present amount to Rs. 29,18,717 till date for the delay in possession ,b. cure the defects in construction, |
AUTHORITY
|
BENCH4
|
|
215 |
CMP/200915/0006588 |
15/09/2020
|
20/03/2023
|
V PAUL AUSTIN BHARATH KUMAR |
MANTRI DEVELOPERS PVT LTD. |
Mantri Webcity3A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
216 |
CMP/200313/0005667 |
13/03/2020
|
20/03/2023
|
VASUDEVAMURTY VENKATA VEMULA |
Puravankara Limited |
Purva Palmbeach |
Puravankara Limited |
Bengaluru Urban |
PAYMENT OF Rs. 9,33,950/- AS COMPENSATION FOR DELAY POSSESSION OF THE FLAT. DETAILS OF CALCULATIONS IN ATTACHMENT COMPENSATION CALCULATIONS.PDF |
AUTHORITY
|
BENCH4
|
|
217 |
CMP/221007/0010059 |
07/10/2022
|
20/03/2023
|
NAVEEN KUMAR & ASHWINI KUKEHALLI SRINIVAS |
RD BUILDTECH AND DEVELOPERS (KARNATAKA) PRIVATE LIMITED |
Reliaable Prime City PHASE 1 |
RD Buildtech and Developers (Karnataka) Private Limited |
Bengaluru Urban |
We request RERA to direct RD Buildtech and Developers (Karnataka) Private Limited to refund our money as promised along with the interest charges for delay in payment. |
AUTHORITY
|
BENCH4
|
|
218 |
CMP/220203/0008944 |
03/02/2022
|
20/03/2023
|
Dileep Kumar Ramachandra |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
219 |
CMP/220204/0008959 |
04/02/2022
|
20/03/2023
|
Saravana Kumar Rajiah |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
220 |
CMP/220223/0009051 |
23/02/2022
|
20/03/2023
|
Haresh Talreja |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
221 |
CMP/220203/0008938 |
03/02/2022
|
20/03/2023
|
Balakrishna Gupta Talasu |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and. Compensation of 10% on my plot value for the Delay, Interest paid to Loan |
AUTHORITY
|
BENCH4
|
|
222 |
CMP/220202/0008914 |
02/02/2022
|
20/03/2023
|
KASI VISWANADHAM SISTA |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
223 |
CMP/220202/0008911 |
02/02/2022
|
20/03/2023
|
Roopashree VM |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project completion with all promised amenities and compensation of 10% on my plot current value for the delay, Interest paid for loan, Energy wasted following up with builder. |
AUTHORITY
|
BENCH4
|
|
224 |
CMP/220203/0008932 |
03/02/2022
|
20/03/2023
|
Kuruvalli Rajasekhar Reddy |
MAHAVEER PALATIUM |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Compensation from the builder |
AUTHORITY
|
BENCH4
|
|
225 |
CMP/UR/200628/0005939 |
28/06/2020
|
20/03/2023
|
YOGISH KALLURAYA ESHWARA |
MAAZ DAWOOD |
Monarch Aqua |
Maaz Dawood |
Bengaluru Urban |
Looking for my total dues refund with interest amount |
AUTHORITY
|
BENCH5
|
|
226 |
CMP/210329/0007852 |
29/03/2021
|
18/03/2023
|
UMESH SHYAM KALASANNAVAR |
KOLTE PATIL DEVELOPERS LTD |
RAAGA |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Compensation against delay of project Raaga by 54 months as RERA guidelines |
AUTHORITY
|
BENCH5
|
|
227 |
CMP/220613/0009617 |
13/06/2022
|
16/03/2023
|
Himanshu Singh Tomar |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
I request RERA to 1. Ask the builder to provide compensation for the delay 2. complete the project as soon as possible |
AUTHORITY
|
BENCH6
|
|
228 |
CMP/220725/0009801 |
25/07/2022
|
16/03/2023
|
Dharmendrakumar Harihar Desai |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund with compensation and cancellation of loan |
AUTHORITY
|
BENCH6
|
|
229 |
CMP/201021/0006932 |
21/10/2020
|
16/03/2023
|
Priyankar Gupta |
PARKWAY HOMES LLP |
Parkway Homes PH-II |
Parkway Homes LLP |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH6
|
|
230 |
CMP/201025/0006956 |
25/10/2020
|
16/03/2023
|
satya prakash sahoo |
PARKWAY HOMES LLP |
PARKWAY HOMES |
PARKWAY HOMES LLP |
Bengaluru Urban |
compensation for delay and related losses suffered |
AUTHORITY
|
BENCH6
|
|
231 |
CMP/211013/0008438 |
13/10/2021
|
16/03/2023
|
Sharath Hanchannore Rathnakar |
VARIN INFRA PROJECTS PRIVATE LIMITED |
ADARSH WISTERIA PHASE 1 |
VARIN INFRA PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Request you to direct Builder / developer to refund the advance payment with compensation . |
AUTHORITY
|
BENCH6
|
|
232 |
CMP/211029/0008505 |
29/10/2021
|
16/03/2023
|
KARTHIK BALAJI CHINNADORAI |
VARIN INFRA PROJECTS PRIVATE LIMITED |
ADARSH WISTERIA PHASE 1 |
VARIN INFRA PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
Refund of advance of Rs.60,39,087/- with interest at 10.25%, compensation and penalty |
AUTHORITY
|
BENCH6
|
|
233 |
CMP/220901/0009964 |
01/09/2022
|
16/03/2023
|
ARUNENDRA KUMAR SHUKLA |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED |
SOWPARNIKA SWASTIKA PHASE II |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED |
Bengaluru Urban |
1)A REFUND OF RS 15,00000/- APPROX AS PER ACTUALS ALONG WITH APPLICABLE BANK INTEREST. 2)SUITABLE CAR PARKING(WITH ALLOTMENT LETTER) AS PER SIZE AND SPECIFICATIONS UPLOADED BY BUILDER ON RERA PORTAL |
AUTHORITY
|
BENCH6
|
|
234 |
CMP/UR/220920/0010028 |
20/09/2022
|
16/03/2023
|
K Dasaradha Ramaiah |
SOWPARNIKA PROJECTS & INFRASTRUCTURE PVT LTD |
Sowparnika Swastika Phase-1 |
Sowparnika Projects and Infrastructure Pvt Ltd |
Bengaluru Urban |
Demanding for OC, CC, fully functional STP for phae1, standard amenities, approved plan from BMRDA, and compensation of 10 lacs |
AUTHORITY
|
BENCH6
|
|
235 |
CMP/UR/190520/0003081 |
20/05/2019
|
16/03/2023
|
Anket Kumar |
Roopa Infra Projects (India) PVT LTD |
Green Mile |
Roopa Infra Projexts India PVT LTD |
Bengaluru Urban |
Interest amount |
AUTHORITY
|
BENCH4
|
|
236 |
CMP/UR/190525/0003151 |
25/05/2019
|
16/03/2023
|
Suresh P |
M/s Roopa Infra Projects (India) Private Limited |
Roopa Infra Projects (India) Pvt.Ltd |
Greenmile |
Bengaluru Urban |
Refund of Interest for 4 lakh rupees invested |
AUTHORITY
|
BENCH4
|
|
237 |
CMP/220309/0009096 |
09/03/2022
|
15/03/2023
|
NAVNEETH BHEEMAN & (2) LEENA POOVANNA NAVNEETH |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIM |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of full amount paid along with interest at prevailing rates of 9.5% |
AUTHORITY
|
BENCH4
|
|
238 |
CMP/210104/0007387 |
04/01/2021
|
15/03/2023
|
KUNAL GUPTA & SWEETY GUPTA |
SHOBA LIMITED |
Sobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44 |
Sobha Limited |
Bengaluru Urban |
* Please order Sobha Ltd to refund application money along with interest as authority may deem fit for this inordinate delay. |
AUTHORITY
|
BENCH5
|
|
239 |
CMP/220509/0009437 |
09/05/2022
|
15/03/2023
|
Arindam Lahiri |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund of application money of Rs. 75,000 along with applicable interest |
AUTHORITY
|
BENCH6
|
|
240 |
CMP/201224/0007317 |
24/12/2020
|
15/03/2023
|
Mr Rohit Chauhan |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Return of amount for L 303 + interest + close HDFC Loan + compensation for delay till OC + return of booking amount for new 1 BHK + compensation under section 72 |
AUTHORITY
|
BENCH6
|
|
241 |
CMP/220721/0009789 |
21/07/2022
|
15/03/2023
|
Mohammed Nurain Megoon |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund of amounts paid by me with interest and compensation |
AUTHORITY
|
BENCH6
|
|
242 |
CMP/190825/0003902 |
25/08/2019
|
15/03/2023
|
NAGENDRA M.S. |
M/S GM INFINITE DWELLING (INDIA_ PRIVATE LIMITED, (2) GULAM MUSTAFA (3) JAWID HUSSAIN |
GM INFINITE SILVER SPRING FIELD |
M/s.GM Infinite Dwelling (India) Private Limited |
Bengaluru Urban |
as prayed above in facts |
AUTHORITY
|
BENCH4
|
|
243 |
CMP/190825/0003907 |
25/08/2019
|
15/03/2023
|
RAJNEESH KUMAR SINGH |
M/S GM INFINITE DWELLING (INDIA) PRIVATE LIMITED, GULAM MUSTAFA, & JAWID HUSSAIN |
GM INFINITE SILVER SPRING FIELD |
M/s.GM Infinite Dwelling (India) Private Limited |
Bengaluru Urban |
As prayed in facts |
AUTHORITY
|
BENCH4
|
|
244 |
CMP/211020/0008451 |
20/10/2021
|
14/03/2023
|
HEMASUNDAR VENIGALLA |
M/S.RD BUILDTECH & DEVELOPERS |
Reliaable Prime City PHASE 1 |
RD Buildtech and Developers (Karnataka) Private Limited |
Bengaluru Urban |
Request RERA team look into this issue and arrange refund of 1Lac plus interest from Reliaable builder |
AUTHORITY
|
BENCH5
|
|
245 |
CMP/200131/0005334 |
31/01/2020
|
14/03/2023
|
KOLLURI SURESH BABU |
M/S.ROMA BUILDERS |
Roma Epicurean |
M/s.Roma Builders |
Bengaluru Urban |
new complaint |
AUTHORITY
|
BENCH5
|
|
246 |
CMP/190910/0004169 |
10/09/2019
|
14/03/2023
|
SIRSIMTH MEER ASHRAF ALI |
VARINDER KAUR |
Emprasa Startup City - Residential |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
Refund of Rs 4,43,080/- |
AUTHORITY
|
BENCH5
|
|
247 |
CMP/220604/0009586 |
04/06/2022
|
14/03/2023
|
Abirami |
SPL TOWERS PRIVATE LIMITED |
Shriram WYT Field |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Sale Consideration paid |
AUTHORITY
|
BENCH6
|
|
248 |
CMP/220520/0009493 |
20/05/2022
|
14/03/2023
|
Deepak Sridhar |
SPL TOWERS PRIVATE LIMITED |
Shriram WYT Field -2 |
SPL TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Booking amount of Rs.50,000/- refund |
AUTHORITY
|
BENCH6
|
|
249 |
CMP/200513/0005602 |
13/05/2020
|
14/03/2023
|
UMA ANDANAYYA SARANGANACHARI |
KOLTE PATIL DEVELOPERS LIMITED |
|
|
Bengaluru Urban |
Kindly help us regarding compensation due amount should be paid by builder up to Apr 2020 |
AUTHORITY
|
FULLBENCH
|
|
250 |
CMP/220203/0008940 |
03/02/2022
|
14/03/2023
|
NAGA HEMANTH LAKSHIPRADEEP KUMAR |
URBAN SERENITY |
URBAN SERENITY |
INNER URBAN INFRAESTATE PVT LTD |
Bengaluru Urban |
Direct Promoter to (a)procure completion and/or occupancy certificate, (b)complete project in three months, (c)establish permanent BESCOM connection, (d)construct Jogging track, (e)install solar. |
AUTHORITY
|
FULLBENCH
|
|
251 |
CMP/180625/0000956 |
25/06/2018
|
14/03/2023
|
KAMAKHYA NARAYAN |
WYNN TOWERS |
Wynn Towers Project |
G Nanda Kumar Kirti K Mehta |
Bengaluru Urban |
No |
AUTHORITY
|
FULLBENCH
|
|
252 |
CMP/210713/0008118 |
13/07/2021
|
14/03/2023
|
B S UDAYASHANKAR |
UNISHIRE ELAN |
Unishire Elan |
UNISHIRE HOUSING LLP |
Bengaluru Urban |
PERMISSION TO WITHDRAW WITH REFUND OF THE CONSIDERATION AMOUNT WITH INTEREST OR DELAY COMPENSATION AS AGREED IN THE AGREEMENTS OF SALE |
AUTHORITY
|
FULLBENCH
|
|
253 |
CMP/220203/0008935 |
03/02/2022
|
14/03/2023
|
DIBYA RANJAN MOHANTY |
URBAN SERSNITY |
URBAN SERENITY |
INNER URBAN INFRAESTATE PVT LTD |
Bengaluru Urban |
Direct Promoter to (a)procure completion and/or occupancy certificate, (b)complete project in three months, (c)establish permanent BESCOM connection, (d)construct Jogging track, (e)install solar. |
AUTHORITY
|
FULLBENCH
|
|
254 |
CMP/220203/0008936 |
03/02/2022
|
14/03/2023
|
SURESH S MENON |
URBAN SERENITY |
URBAN SERENITY |
INNER URBAN INFRAESTATE PVT LTD |
Bengaluru Rural |
Direct Promoter to (a)procure completion and/or occupancy certificate, (b)complete project in three months, (c)establish permanent BESCOM connection, (d)construct Jogging track, (e)install solar. |
AUTHORITY
|
FULLBENCH
|
|
255 |
CMP/210811/0008236 |
11/08/2021
|
14/03/2023
|
GANESH VENKAT |
M/s. Wonder Projects Development Private Limited |
Godrej Reflections - Phase-1 |
M/s. Wonder Projects Development Private Limited |
Bengaluru Urban |
Refund of our booking advance amount with interest till date |
AUTHORITY
|
BENCH4
|
|
256 |
CMP/200605/0005963 |
05/06/2020
|
14/03/2023
|
Ashvin |
Krishna Mystiq |
KRISHNA MYSTIQ (PHASE-II) |
KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED |
Bengaluru Urban |
Refund of the entire invested amount(till date) with interest |
AUTHORITY
|
BENCH5
|
|
257 |
CMP/220908/0009991 |
08/09/2022
|
13/03/2023
|
EDWIN FREDRICK (2) USHA KUMARI |
SHRILINE PROPERTIES PVT.LTD |
Shriline Avanti |
Shriline properties Pvt.Ltd |
Bengaluru Urban |
REFUND AND CLOSE MY LOAN WITHDRAWAN |
AUTHORITY
|
BENCH4
|
|
258 |
CMP/220901/0009967 |
01/09/2022
|
13/03/2023
|
SURYAKANT THOSAR |
SJR PRIMECORPORATION PVT LTD SJR PRIMECORPORATION PVT LTD |
SJR PRIMECORPORATION PVT LTD PALAZZA PH2 |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
To help in Refund of Initial Booking Amount Rs 300850 as early as possible |
AUTHORITY
|
BENCH4
|
|
259 |
CMP/220907/0009985 |
07/09/2022
|
13/03/2023
|
J S DORA BABU (2) BHAVYA TN |
HEBRON PROPERTIES PVT LTD |
Hebron Avenue |
Hebron Properties Pvt Ltd |
Bengaluru Urban |
Either refund of my total amount paid for the flat with some compensation or my flat as promised by the builder |
AUTHORITY
|
BENCH4
|
|
260 |
CMP/210126/0007500 |
26/01/2021
|
13/03/2023
|
REJIL M R |
M/S. ALLAM INFINITE INDIA PRIVATE LIMITED |
GM AMBITIOUS ENCLAVE |
M/s. Allam Infinite India Private Limited |
Bengaluru Urban |
Refund of Rs.50000/- (Fifty thousand rupees) which is the booking amount. |
AUTHORITY
|
BENCH4
|
|
261 |
CMP/190115/0001874 |
15/01/2019
|
13/03/2023
|
VARSHA BALUSA |
EBENEZER DEVASAHAYAM |
Expat Central - The Hub |
Expat Projects Banglore Holdings Pvt Ltd |
Bengaluru Urban |
Refund of principle amount along with 12% interest |
AUTHORITY
|
FULLBENCH
|
|
262 |
CMP/UR/190327/0002524 |
27/03/2019
|
13/03/2023
|
DATTATHRI RAMANNA |
CENTURY INDUS |
Century Indus |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
Instruct Century real Estate to fufill the commit |
AUTHORITY
|
FULLBENCH
|
|
263 |
CMP/180531/0000876 |
31/05/2018
|
13/03/2023
|
MANISH SINGH |
BAIRAVI PERPROTIES &CONSTRUCTION (P) ltd. |
BAIRAVI CRUZ LUXOR |
BAIRAVI PROPERTIES & CONSTRUCTIONS (P) LTD and others |
Bengaluru Urban |
project Completion & as stated in attached Form |
AUTHORITY
|
FULLBENCH
|
|
264 |
CMP/180517/0000839 |
17/05/2018
|
13/03/2023
|
P K M BASHEER |
SURESH BANDARY |
Mischief Megha Mahal |
M/s. Bhandary Associates |
Dakshina Kannada |
Offence under Section 59(1) of the RERA Act 2016. |
AUTHORITY
|
FULLBENCH
|
|
265 |
CMP/191205/0004889 |
05/12/2019
|
10/03/2023
|
MR. VIJAY T DHALIR |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Pending amenities & documents |
AUTHORITY
|
BENCH6
|
|
266 |
CMP/220702/0009711 |
02/07/2022
|
10/03/2023
|
Sangeeta Jaiswal |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Rural |
I want full refund of the amount paid with interest and closure of bank loan with no liability on me. |
AUTHORITY
|
BENCH6
|
|
267 |
CMP/UR/201110/0007043 |
10/11/2020
|
10/03/2023
|
Srikantha C S |
OZONE GROUP |
Ozone Urbana Pavillion |
Ozone Group |
Bengaluru Urban |
The Complainant seeks a Compensation of Rs 26,00,000/- (Rupees Twenty Six Lakhs Only) from the Builder Respondent for inordinate delay with interest till date of realization of the same. |
AUTHORITY
|
BENCH6
|
|
268 |
CMP/200302/0005587 |
02/03/2020
|
10/03/2023
|
M.A.UPPAL |
PURAVANKARA LIMITED |
Purva Palmbeach |
Puravankara Limited |
Bengaluru Urban |
Direction to the builder to give possession at the agreed price |
AUTHORITY
|
BENCH4
|
|
269 |
CMP/UR/220824/0009932 |
24/08/2022
|
09/03/2023
|
KRISHNA E CAMPUS PRIVATE LIMITED |
MARIAM SHEELA JOSEPH |
|
|
Bengaluru Urban |
Pay balance sale consideration with interest and come forward for execution and registration of sale deed. Alternatively, pay interest for delayed payments + execute & register cancellation deed |
AUTHORITY
|
BENCH4
|
|
270 |
CMP/191210/0004902 |
10/12/2019
|
09/03/2023
|
SUNIL |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
REALY NEED YOUR HELP TO INFORM BUILDER FOR COMPENSATION AND NEED TO COMPLETE THE REGISTRATION AND BASIC AMENITIES ON URGENT BASIS |
AUTHORITY
|
BENCH6
|
|
271 |
CMP/191205/0004898 |
05/12/2019
|
09/03/2023
|
VENKATAPPA |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Registration, completion of Project and Amenties |
AUTHORITY
|
BENCH6
|
|
272 |
CMP/211227/0008750 |
27/12/2021
|
09/03/2023
|
Vivekananda B S |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Need a compensation for the breach of contract and refund full amount with interest and penalty as we believe this project never going to complete |
AUTHORITY
|
BENCH6
|
|
273 |
CMP/200522/0005927 |
22/05/2020
|
09/03/2023
|
Manikanta |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Request to complete the project ASAP. Please don't ask illegal charges for BESCOM. |
AUTHORITY
|
BENCH6
|
|
274 |
CMP/200201/0004735 |
01/02/2020
|
09/03/2023
|
SHAILESH KUMAR U |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
delivery of flat,compensation for the delay and all the amenities promised |
AUTHORITY
|
BENCH6
|
|
275 |
CMP/200218/0005473 |
18/02/2020
|
09/03/2023
|
ARUN SHANKAR KOLI |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
|
|
Bengaluru Urban |
To get reimbursement of Rs.20,65,734/- along with interest at the rate of 24% per annum from 21/12/2016 till the date of complete reimbursement and compensation of Rs.10 Lakhs as damages |
AUTHORITY
|
BENCH6
|
|
276 |
CMP/191211/0004966 |
11/12/2019
|
09/03/2023
|
Gina Scolt |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Compensation, Registration, completion of Amenties & Project |
AUTHORITY
|
BENCH6
|
|
277 |
CMP/191207/0004919 |
07/12/2019
|
09/03/2023
|
Ricky Gabral |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Registration, completion of Project and Amenties |
AUTHORITY
|
BENCH6
|
|
278 |
CMP/191206/0004903 |
06/12/2019
|
09/03/2023
|
Shiva Kumar Tc |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Registration, completion of Project and Amenties |
AUTHORITY
|
BENCH6
|
|
279 |
CMP/200107/0005158 |
07/01/2020
|
09/03/2023
|
ASHUTOSH SINGH |
ASWANI PROPERTIES INDIA PRIVATE LIMITED |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Builder should handover my flat by January-2020 and should provide the compensation for delay. |
AUTHORITY
|
BENCH6
|
|
280 |
CMP/210102/0007378 |
02/01/2021
|
09/03/2023
|
NAVEEN KUMAR |
CMRS BUILDERS |
MOONSTONE |
CMRS BUILDERS |
Bengaluru Urban |
Payment of rent @20000/ since April 2017 till date along with interest |
AUTHORITY
|
BENCH4
|
|
281 |
CMP/211227/0008752 |
27/12/2021
|
09/03/2023
|
ANAND SIDDHARTH K & AKSHAYA H |
HIREN WAHEN BUILDTECH (2) WAHENGBAM LALIT SINGH |
HIGHCLIFF |
HIREN WAHEN BUILDTECH |
Bengaluru Urban |
Cancellation of allotment, subject to the condition that the promoter refunds the entire amount of INR 25,00,000 with applicable interest |
AUTHORITY
|
BENCH4
|
|
282 |
CMP/180921/0001299 |
21/09/2018
|
08/03/2023
|
SANDHYA GUPTA |
K MALINI, KAR NA SREE DEVELOPERS AND BUILDERS |
MATHRUSREE SILVER ARCADE |
KAR NA SREE DEVELOPERS AND BUILDERS |
Bengaluru Urban |
as stated in Facts of Complaint |
AUTHORITY
|
BENCH6
|
|
283 |
CMP/190222/0002253 |
22/02/2019
|
08/03/2023
|
Sejal Jay Shah |
M/S MANTRI DWELLINGS PRIVATE LIMITED |
Mantri DSK Pinnacle |
Mantri Dwellings Pvt. Ltd |
Bengaluru Urban |
Interest and compensation |
AUTHORITY
|
BENCH6
|
|
284 |
CMP/UR/190314/0002304 |
14/03/2019
|
08/03/2023
|
ZAKEERHUSEN RONAD |
MS. DISHA CHOUDHARY, MD, M/S DREAMZ INFRA INDIA LTD |
DREAMZ SUMUDHUR |
MS. DISHA COUDHARY M/S DREAMZ INFRA INDIA LITD., BANGALORE |
Bengaluru Urban |
Immediate refund of the amount along with interest |
AUTHORITY
|
BENCH6
|
|
285 |
CMP/190511/0002976 |
11/05/2019
|
08/03/2023
|
Arjun Nair & Zeenita Nair |
PARKWAY HOMES LLP |
Parkway Homes PH-II |
Parkway Homes LLP |
Bengaluru Urban |
Compensation at prevailing rate prescribed by RERA |
AUTHORITY
|
BENCH6
|
|
286 |
CMP/UR/190624/0003366 |
24/06/2019
|
08/03/2023
|
Onkar Banerjee |
MAITHRI DEVELOPERS |
Maithri Developers |
B V S Reddy |
Bengaluru Urban |
Replace DG with RWH & garden as per sanction plan |
AUTHORITY
|
BENCH6
|
|
287 |
CMP/UR/190723/0003500 |
23/07/2019
|
08/03/2023
|
KULJOT SINGH |
C. RAMESH REDDY, B.T. PREM KUMAR, VAV SHIVA REDDY, M/S ADHVAYTHA DEVELOPERS |
SILICON GREENS |
ADHVAYTHA DEVELOPERS |
Bengaluru Urban |
Action to complete the pending activities |
AUTHORITY
|
BENCH6
|
|
288 |
CMP/UR/200112/0005198 |
12/01/2020
|
08/03/2023
|
JITIN METHWANI |
SRI SUMERU HOUSING PVT LTD |
Samethana Lakefront Apartment |
Sri Sumeru Housing Pvt. Lim |
Bengaluru Urban |
Full Compensation (including interest/losses incured) in the flat |
AUTHORITY
|
BENCH6
|
|
289 |
CMP/UR/200305/0005642 |
05/03/2020
|
08/03/2023
|
p. jahnavi reddy |
BCV DEVELOPERS |
brigade orchards-parkside |
bcv developers |
Bengaluru Urban |
respondent needs to be restrained from discontinuing electricity and water by an order from the honourable Authority. |
AUTHORITY
|
BENCH6
|
|
290 |
CMP/UR/200605/0005962 |
05/06/2020
|
08/03/2023
|
Brinda Basappa |
CHANDRAPPA S & PRAKASH M, MATHRUSRI DEVELOPERS |
Mathrusri Layout |
Chandrappa S and Prakash M |
Bengaluru Urban |
I request you to kindly take serious note and have my money refunded as being customer I am getting suffered here. Its my hard earned money. Pl stop promotor from harassing the customers unnecessarily |
AUTHORITY
|
BENCH6
|
|
291 |
CMP/200525/0005930 |
25/05/2020
|
08/03/2023
|
Tarun Jacob George |
MILAN M PARIKH, GOLDEN GATE PROPERTIES LIMITED |
GOLDEN BLOSSOM APARTMENTS |
MILAN M PARIKH |
Bengaluru Urban |
Correct the situation and have the promoter take responsibility to do the same. Ensure that a covered parking space is allotted to me as per the original sale agreement |
AUTHORITY
|
BENCH6
|
|
292 |
CMP/UR/200513/0005882 |
13/05/2020
|
08/03/2023
|
JRK Gardens Owners Welfare Association |
M/S VIRANI BUILDERS & OTHERS |
JRK Gardens |
Virani Builder & Developers |
Bengaluru Urban |
We the JRK gardens Owners welfare association seek the respected authority to kindly help us in resolving the matter with the M/s. Virani Builders and Developers and land owner Mr. C R Sathisha Kumar |
AUTHORITY
|
BENCH6
|
|
293 |
CMP/200116/0005240 |
16/01/2020
|
08/03/2023
|
MANISH KUMAR |
MANAR DEVELOPERS PRIVATE LIMITED |
MANAR Pure Earth |
MANAR DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
CLAIMING OF COMPENSATION AND LEGAL EXPENSES |
AUTHORITY
|
BENCH4
|
|
294 |
CMP/UR/201127/0007129 |
27/11/2020
|
08/03/2023
|
Kiran Balakrishna Kumar |
MANAR DEVELOPERS PRIVATE LIMITED |
Manar Pure Earth |
Manar Developers Private Limited |
Bengaluru Urban |
Complainants may be permitted to exit from the project “Manar Pure Earth” and ordered to refund entire amount paid by the Complainant to the Developer with interest and compensation |
AUTHORITY
|
BENCH4
|
|
295 |
CMP/200823/0006405 |
23/08/2020
|
08/03/2023
|
Mahesh Veershetty |
MANAR DEVELOPERS PRIVATE LIMITED |
MANAR Pure Earth |
MANAR DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Full refund of amount including 10% interest rate |
AUTHORITY
|
BENCH4
|
|
296 |
CMP/211021/0008459 |
21/10/2021
|
08/03/2023
|
GOPAKUMAR K B MENON |
MANAR DEVELOPERS PRIVATE LIMITED (2) M/S CITRUS VENTURES PRIVATE LIMITED |
MANAR Pure Earth |
MANAR DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
They have to settle HDFC LOAN & RELATED INTEREST |
AUTHORITY
|
BENCH4
|
|
297 |
CMP/181213/0001754 |
13/12/2018
|
08/03/2023
|
TRIBHUVAN ADITYA SINGH |
LAVISA INFRASTRUCTURES LIMITED |
PLANET |
LAVISA INFRASTRUCTURES LIMITED |
Chikballapur |
Registry of plot of land along with compensation |
AUTHORITY
|
BENCH6
|
|
298 |
CMP/190117/0001899 |
17/01/2019
|
07/03/2023
|
NAZIA AHMAD |
M/S DS & JAKS CONSTRUCTIONS |
Needs 3 Project276 |
M/s Ds & Jaks Constructions |
Bengaluru Urban |
Compensation as 10% interest on amount paid |
AUTHORITY
|
BENCH4
|
|
299 |
CMP/UR/220316/0009125 |
16/03/2022
|
07/03/2023
|
Ashish bhasin |
MAXWORTH REALTY INDIA LIMITED |
Max orchard phase 3 |
MR. Kesava Murthy |
Bengaluru Rural |
Need refund with interest |
AUTHORITY
|
BENCH6
|
|
300 |
CMP/210826/0008274 |
26/08/2021
|
07/03/2023
|
Soumi Sen |
AZEEM INFINITE DWELLING (INDIA) PRIVATE LIMITED |
GM ELEGANCE TOWER-1 (E-12) |
M/s. AZEEM INFINITE DWELLING (INDIA) PVT LTD |
Bengaluru Urban |
Refund of amount paid with Interest and Compensation |
AUTHORITY
|
BENCH6
|
|
301 |
CMP/221115/0010339 |
15/11/2022
|
07/03/2023
|
BRIJEND KUMAR TIWARI AND NEHA TIWARI |
SUVILAS PROPERTIES PRIVATE LIMITED |
SHRIRAM SUVILAS GARDEN OF JOY |
SUVILAS PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Builder is NOT Responding so Knocking the door for REFUND |
AUTHORITY
|
BENCH6
|
|
302 |
CMP/UR/211228/0008753 |
28/12/2021
|
07/03/2023
|
Sandeep Sethi & Sakshi Sethi |
DHIRAJ PRABHU, SKYLINE CONSTRUCTIONS PRIVATE LIMITED |
SKYLINE FOUNTAINHEAD |
Skyline Constructions Pvt Ltd |
Bengaluru Urban |
RELEASE OF A KHATA OF THE SAID PROPERTY TO BUYER |
AUTHORITY
|
BENCH6
|
|
303 |
CMP/191220/0005024 |
20/12/2019
|
07/03/2023
|
MANAS RANJAN BEHERA |
ETERNITY DEVELOPERS PRIVATE LIMITED |
Skyline AURA |
Eternity Developers Private Limited |
Bengaluru Urban |
get the flat with deay compensation. |
AUTHORITY
|
BENCH6
|
|
304 |
CMP/210712/0008116 |
12/07/2021
|
07/03/2023
|
Franklin D Souza |
P. G. Ramesh |
Highway 96 |
P.G.Ramesh |
Bengaluru Urban |
Amenities to be provided or paid amount to be refunded. |
AUTHORITY
|
BENCH4
|
|
305 |
CMP/200715/0006152 |
15/07/2020
|
07/03/2023
|
MR.VARUN RAVISHANKAR |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
306 |
CMP/210107/0007353 |
07/01/2021
|
07/03/2023
|
MR.ATUL KUMAR VERMA |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
Refund of my invested money Rs. 59,37,403 together with INTEREST from the date of payment to until now. |
AUTHORITY
|
BENCH5
|
|
307 |
CMP/200913/0006407 |
13/09/2020
|
07/03/2023
|
MR.SHASHI BHUSHAN CHIDARA |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity3A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
308 |
CMP/200913/0006561 |
13/09/2020
|
07/03/2023
|
MR.ANIRBAN DATTA |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity3C |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
309 |
CMP/200823/0006393 |
23/08/2020
|
07/03/2023
|
MR.N.V.RAGHAVAN |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
310 |
CMP/200612/0005929 |
12/06/2020
|
07/03/2023
|
MR.KRISHNAKUMAR.R |
M/S.MANTRI DEVELOPERS PVT LTD |
Mantri Webcity3B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in facts of complaint |
AUTHORITY
|
BENCH5
|
|
311 |
CMP/220915/0010020 |
15/09/2022
|
06/03/2023
|
MOHAN PULLAIAH |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
We are seeking refund of the amount invested plus the buy back amount guaranteed with interest and closure of loan. nOC to be provided |
AUTHORITY
|
BENCH5
|
|
312 |
CMP/220915/0010021 |
15/09/2022
|
06/03/2023
|
MOHAN PULLIAH |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
Refund with assured return on investment interest and cancellation of loan |
AUTHORITY
|
BENCH5
|
|
313 |
CMP/220905/0009977 |
05/09/2022
|
06/03/2023
|
MOHAN PULLIAH |
MANTRI DEVELOPERS |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
Pay the money in accordance with buyback scheme + interest for the delay and closure of loan in my name. |
AUTHORITY
|
BENCH5
|
|
314 |
CMP/220126/0008876 |
26/01/2022
|
04/03/2023
|
RAMAMANI B M |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
ACTION AGAINST THE DEVELOPER TO COMPLETE THE PROMISED AMENITIES AND LEVELLING OF THE PLOT |
AUTHORITY
|
BENCH4
|
|
315 |
CMP/220125/0008868 |
25/01/2022
|
04/03/2023
|
Ananth K L |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate project completion with all promised amenities, Levelling of the plot and compensation of 10% on my plot value for delay, Interest paid on loans |
AUTHORITY
|
BENCH4
|
|
316 |
CMP/211012/0008432 |
12/10/2021
|
04/03/2023
|
Pon Umapathy K S |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Please provide me with appropriate compensation. |
AUTHORITY
|
BENCH4
|
|
317 |
CMP/220202/0008904 |
02/02/2022
|
04/03/2023
|
Preethi Anand |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and Compensation of 10% on my plot current value for the Delay, Interest paid to Loans, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
318 |
CMP/220202/0008903 |
02/02/2022
|
04/03/2023
|
Lalit Patel |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate Project Completion with all promised amenities and clubhouse and Compensation of 10% on my plot current value for the Delay, Energy wasted following up with builder |
AUTHORITY
|
BENCH4
|
|
319 |
CMP/220202/0008909 |
02/02/2022
|
04/03/2023
|
Vanishree VM |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate project completion with all promissed amenities and compensation of 10% on my plot curretn value for the delay, intrest paid to loan, Energy vasted following up with builder. |
AUTHORITY
|
BENCH4
|
|
320 |
CMP/220202/0008910 |
02/02/2022
|
04/03/2023
|
SURYA KUMARI A & MADHURI PRASANNA A |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER PALATIUM |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate project completion with promised amenities and compensation of 10% of my plot current value for the delay |
AUTHORITY
|
BENCH4
|
|
321 |
CMP/210623/0008034 |
23/06/2021
|
04/03/2023
|
C H NARASIMHA RAJU |
LTCEL RAINTREE BOULEVARD CL5 |
LTCEL RAINTREE BOULEVARD CL5 |
L&T Construction Equipment Ltd - Realty Division |
Bengaluru Urban |
Rescheduling of balance of payments |
AUTHORITY
|
FULLBENCH
|
|
322 |
CMP/220520/0009491 |
20/05/2022
|
02/03/2023
|
Pentakota Krishna Anand Santosh Srikanth |
Shriprop Builders Private Limited |
SHRIRAM EARTH ? WHITEFIELD |
SHRIPROP BUILDERS PRIVATE LIMITED |
Bengaluru Urban |
We request our payment of Rs.10,50,000.00 to be refunded back to us at the earliest as it is causing us financial and mental distress. |
AUTHORITY
|
BENCH6
|
|
323 |
CMP/220203/0008929 |
03/02/2022
|
02/03/2023
|
Subhankar Dutta |
M/s.Sattva Developers Pvt Ltd. |
SALARPURIA-SATTVA OPUS |
SATTVA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Grant of the said compensation from Sattva developers private limited |
AUTHORITY
|
BENCH5
|
|
324 |
CMP/220913/0010005 |
13/09/2022
|
02/03/2023
|
Mr.Ravindra Kamath & Ms.Rachana Kamath |
M/s.Sattva Developers Pvt Ltd. |
SALARPURIA-SATTVA OPUS |
SATTVA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Lordship relief sought for compensation for breach of Sale Agreement for default in Possession and to direct builder to remit GST input tax credit |
AUTHORITY
|
BENCH5
|
|
325 |
CMP/211010/0008423 |
10/10/2021
|
02/03/2023
|
L KAMAL SREEHARI, LEKHA P & VEENA SREEHARI |
UNITED OXYGEN COMPANY PRIVATE LIMITED |
Godrej United |
United Oxygen Company Private Limited |
Bengaluru Urban |
Immediate action on Developer and help in getting compensation for all the damages and inconvenience caused. |
AUTHORITY
|
BENCH4
|
|
326 |
CMP/200730/0004840 |
30/07/2020
|
02/03/2023
|
RAKESH KOLAR |
MAXWORTH REALTY INDIA LIMITED |
|
|
Bengaluru Urban |
Refund of the Amount Given to Maxworth with Interest. |
AUTHORITY
|
BENCH4
|
|
327 |
CMP/201114/0007060 |
14/11/2020
|
01/03/2023
|
Sunil Banthiya |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation |
AUTHORITY
|
BENCH4
|
|
328 |
CMP/200716/0006169 |
16/07/2020
|
01/03/2023
|
MR.SATHISH R THOPPEY |
M/S.MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
329 |
CMP/200122/0005278 |
22/01/2020
|
01/03/2023
|
Pratap R |
PURUVANKARA LIMITED |
Provident Park Square Phase - 1 |
Puravankara Limited |
Bengaluru Urban |
Refund of booking amount |
AUTHORITY
|
BENCH6
|
|
330 |
CMP/UR/211119/0008589 |
19/11/2021
|
01/03/2023
|
Puravankara Limited |
C.H. SRINIVAS |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 21.07.2018 bearing registration number JPN-1-02641-2018-19 for apartment no. B5-5A-1305. |
AUTHORITY
|
BENCH6
|
|
331 |
CMP/UR/211119/0008599 |
19/11/2021
|
01/03/2023
|
Puravankara Limited |
CHIKKALA SATYANARAYAN |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 21.06.2018 bearing registration number JPN-1-02632-2018-19 for apartment no. B5-5A-1304. |
AUTHORITY
|
BENCH6
|
|
332 |
CMP/220530/0009539 |
30/05/2022
|
01/03/2023
|
AVADHESH KUMAR & MRS. NEETA KUMARI |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Support required from RERA authorities 1. To get compensation adjusted in demand being sent as I cannot affort EMI and house rent together due to delay in project 2. To get clear timeline of delivery |
AUTHORITY
|
BENCH6
|
|
333 |
CMP/220115/0008796 |
15/01/2022
|
28/02/2023
|
Sukesh N Shetty |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
1) Delay compensation till the handover of the project happens from respondent 2) Request RERA authority to not to provide any further extension 3) Change GST rate to 1%. Refund of excess GST paid. |
AUTHORITY
|
BENCH6
|
|
334 |
CMP/220602/0009571 |
02/06/2022
|
28/02/2023
|
JITENDRA MISHRA & MRS. NEHA KUMARI |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Project completion and compensation |
AUTHORITY
|
BENCH6
|
|
335 |
CMP/UR/200304/0005634 |
04/03/2020
|
27/02/2023
|
R Nilakantan Iyer |
SAMSKRUTI BUILDERS PRIVATE LIMITED |
Samskruti Maurya |
Samskruti Builders Private Limited |
Bengaluru Urban |
Recovery of Rs. 52,58,718/- being the cheque dishoured amount along with interest at 18% |
AUTHORITY
|
BENCH6
|
|
336 |
CMP/UR/200130/0004383 |
30/01/2020
|
27/02/2023
|
PONAMALA BHARGAV |
SRI CHOWDESHWARI PROJECTS |
“Thirumala Lakhmi Vaibhav” |
SRI CHOWDESHWARI PROJECTS |
Bengaluru Urban |
Refund of Entire Amount along with Interest |
AUTHORITY
|
BENCH5
|
|
337 |
00067/2023 |
12/01/2023
|
24/02/2023
|
Murali G |
HighLand Properties |
Greendale |
Highland Properties |
Bengaluru Urban |
Refund of the booking amount |
AUTHORITY
|
BENCH4
|
|
338 |
CMP/211110/0008532 |
10/11/2021
|
23/02/2023
|
Prajwal Kumar U |
M/S GOLDEN GATE PROPERTIES LTD |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Compensation for delay and mental agony as prescribed |
AUTHORITY
|
BENCH6
|
|
339 |
CMP/211110/0008534 |
10/11/2021
|
23/02/2023
|
Uma Srinivas |
GOLDEN GATE PROPERTIES LIMITED |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Compensation for delay and mental agony as prescribed |
AUTHORITY
|
BENCH6
|
|
340 |
CMP/211110/0008531 |
10/11/2021
|
23/02/2023
|
Prarthana Kumari U |
GOLDEN GATE PROPERTIES LIMITED |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Compensation for Delay and mental agony as prescribed |
AUTHORITY
|
BENCH6
|
|
341 |
CMP/201214/0005782 |
14/12/2020
|
23/02/2023
|
romeo seth |
SKYLINE CONSTRUCTIONS & HOUSING PRIVATE LIMITED |
Skyline Retreat |
skyline constructions & Housing pvt ltd |
Bengaluru Urban |
Refund of investment with 18% interest |
AUTHORITY
|
BENCH6
|
|
342 |
CMP/220208/0008989 |
08/02/2022
|
23/02/2023
|
BASANTA KUMAR BERERA |
KANSA PROPERTIES LLP |
CANSA DHIYA |
Kansa Properties LLP |
Bengaluru Urban |
none |
AUTHORITY
|
BENCH4
|
|
343 |
CMP/220805/0009859 |
05/08/2022
|
23/02/2023
|
REKHA M |
AK MAXX PROPERTIES (2) KISHORE BABU |
SRI SAI AASARE-PHASE 2 |
AK MAXX PROPERTIES |
Bengaluru Urban |
To Order for refund of the advance amount of Rs.2,00,000/- (Rupees Two Lakhs Only) along with interest |
AUTHORITY
|
BENCH4
|
|
344 |
CMP/220209/0008991 |
09/02/2022
|
23/02/2023
|
SANDEEP KOUL |
VMAKS BUILDERS PVT LTD A NARAYANA REDDY VIJAYA KUMAR N PRATIMA |
VMAKS HEIGHTS |
VMAKS BUILDERS PVT LTD |
Bengaluru Urban |
Request to direct builder to provide the NOC against my flat 111 from the Financer and cost of complaint |
AUTHORITY
|
BENCH4
|
|
345 |
CMP/220822/0009925 |
22/08/2022
|
23/02/2023
|
SANJAY KUMAR |
REDDY HOUSING PRIVATE LIMITED |
MAHAVEER CELESSE |
REDDY HOUSING PRIVATE LIMITED |
Bengaluru Urban |
Please help me so that I could get handover of my flat at earliest. Otherwise advise them to pay me compensation for delay. |
AUTHORITY
|
BENCH4
|
|
346 |
CMP/220818/0009912 |
18/08/2022
|
23/02/2023
|
SHAILENDRA KUMAR & (2) RICHA YADAV |
HI LIFE VENTURES PVT LTD |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
The builder is mentally harassing by not communicating any resolution nor clearity on possession date. We want our money back with bank interest. |
AUTHORITY
|
BENCH4
|
|
347 |
CMP/221011/0010086 |
11/10/2022
|
23/02/2023
|
SREENIVASULU REDDY P, (2) RADHA KRISHNA REDDY P, (3) SUKHAVENI P. |
ADARSH NIVAAS PRIVATE LIMITED H. ANITHA REDDY B M JAYESHANKAR M/S. BANGALORE BEST REALITY (P) LTD |
Adarsh Palm Acres - Phase 1-Part A |
Adarsh Nivaas Private Limited |
Bengaluru Urban |
YES, looking to get relief. Ensure builders won't utilize purchasers amount till Purchaser gets legal clearence |
AUTHORITY
|
BENCH4
|
|
348 |
CMP/221103/0010173 |
03/11/2022
|
23/02/2023
|
KANNAN KRISHNAN |
CENTURY REAL ESTATE HOLDINGS PRIVATE LIMITED |
Century Breeze |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
Century Breeze must settle the Land Owners immediately and complete my registration and hand over immediately |
AUTHORITY
|
BENCH4
|
|
349 |
CMP/UR/221011/0010085 |
11/10/2022
|
23/02/2023
|
DEEPAK SHARMA |
ITTINA GROUP |
ittina Mahavir electronics city Bengaluru |
Ittina Group |
Bengaluru Urban |
THE BUILDER SHOULD BE FORCED TO MAKE AN CGHS IN ITTINA MAHAVIR AND DO THE CONVEYANCE DEED IMMEDIATLY. |
AUTHORITY
|
BENCH4
|
|
350 |
CMP/201014/0006662 |
14/10/2020
|
22/02/2023
|
SURESH BABU M |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED NOW CALLED AS NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NHDPL South Private Limited |
Bengaluru Urban |
Refund of Rs.64,87,376 with compensation (interest) |
AUTHORITY
|
BENCH4
|
|
351 |
CMP/220811/0009868 |
11/08/2022
|
22/02/2023
|
BHUSHAN SHRAVAN BARI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund paid amount with applicable interest |
AUTHORITY
|
BENCH4
|
|
352 |
CMP/200619/0006051 |
19/06/2020
|
22/02/2023
|
Arif Shouqi |
L&T Construction Equipment Ltd |
LTCEL RAINTREE BOULEVARD CL 2 |
L&T Construction Equipment Ltd |
Bengaluru Urban |
Permit me to take my experts during pre-possession inspections |
AUTHORITY
|
FULLBENCH
|
|
353 |
CMP/200308/0005659 |
08/03/2020
|
22/02/2023
|
Shaik Mohammed riaz |
L&T Construction Equipment Ltd |
LTCEL RAINTREE BOULEVARD CL 2 |
L&T Construction Equipment Ltd |
Bengaluru Urban |
Refund of amount for difference in carpet area |
AUTHORITY
|
FULLBENCH
|
|
354 |
CMP/220207/0008971 |
07/02/2022
|
22/02/2023
|
Munnendra A |
Sobha Limited |
Sobha Dream Acres - Tropical Greens Phase 6 Wing 41 |
Sobha Limited |
Bengaluru Urban |
Please ask builder to rectify all those deviations, and provide swimming pool and other amenities as promised. |
AUTHORITY
|
FULLBENCH
|
|
355 |
CMP/201220/0007281 |
20/12/2020
|
22/02/2023
|
CHITRA NAIR |
L&T Construction Equipment Ltd - Realty Division |
LTCEL RAINTREE BOULEVARD CL5 |
L&T Construction Equipment Ltd - Realty Division |
Bengaluru Urban |
Refund of initial payment done with 10% penalty deduction from Rs.5,77,604, on the basis of force majeure |
AUTHORITY
|
FULLBENCH
|
|
356 |
CMP/210223/0007418 |
23/02/2021
|
22/02/2023
|
Ranjana S G |
L&T Construction Equipment Ltd |
LTCEL RAINTREE BOULEVARD CL1 |
L&T Construction Equipment Ltd |
Bengaluru Urban |
The Respondent may be directed to refund the sum of Rs.21,61,786/- together with interest thereon @ 18 % per annum from the date of receipt of the amounts till the date of refund. |
AUTHORITY
|
FULLBENCH
|
|
357 |
CMP/211206/0008692 |
06/12/2021
|
21/02/2023
|
Prajit S Nair |
NAM Estaes Pvt Ltd. |
Embassy Springs - Phase 2A, Apartments |
NAM Estates Private Limited |
Bengaluru Urban |
Request clarification on Rs.30000 which ws forefeited |
AUTHORITY
|
BENCH5
|
|
358 |
CMP/221107/0010223 |
07/11/2022
|
21/02/2023
|
K C Rohith |
SOWPARNIKA HOMES PRIVATE LIMITED |
SOWPARNIKA INDRADHANUSH PHASE I |
SOWPARNIKA HOMES PRIVATE LIMITED |
Bengaluru Urban |
Please help in receiving back my token amount (builder failed to meet their promises) |
AUTHORITY
|
BENCH6
|
|
359 |
CMP/200823/0006284 |
23/08/2020
|
17/02/2023
|
BIBA RAVINDRAN |
MANTRI WEBCITY 3B |
Mantri Webcity3B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
360 |
CMP/210929/0008398 |
29/09/2021
|
17/02/2023
|
VISHWANATH & SUDHA VISHWANATH |
INNER SPACES |
Meadow in the sun |
Inner spaces |
Bengaluru Urban |
Seek compensation for delayed handover at the rate as per committed in the construction agreement clause no. 10 |
AUTHORITY
|
BENCH4
|
|
361 |
CMP/210926/0008379 |
26/09/2021
|
17/02/2023
|
PRADEEP KUMAR DODLE |
INNER SPACES |
Meadow in the sun |
Inner spaces |
Bengaluru Urban |
I seek compensation for the delay from the promoter / builder Innerspaces under RERA ACT 2016 |
AUTHORITY
|
BENCH4
|
|
362 |
CMP/220507/0009432 |
07/05/2022
|
17/02/2023
|
MR BABIM KUMAR SINGH & MEENU SINGH |
SLV INFRASTRUCTURES |
SLV Serenity |
SLV INFRASTRUCTURES |
Bengaluru Urban |
DIrect the Respondent to refund Rs 23,92,700 along with 24% interest, close the bank loan and pay 60 Lakh to Complainant for compensation. |
AUTHORITY
|
BENCH4
|
|
363 |
CMP/UR/200907/0006517 |
07/09/2020
|
17/02/2023
|
B Prasanna Venkataramana |
M.S. Divya, Chairman & (2) M.S. Prasad, Managing Director, M/s Trinco Infra Private Limited |
Trinco Nandanavana |
Trinco Infra Pvt Ltd |
Bengaluru Urban |
Refund with interest as per RERA and Compensation |
AUTHORITY
|
BENCH4
|
|
364 |
CMP/220416/0009360 |
16/04/2022
|
17/02/2023
|
Debadatta patra |
mantri developers pvt ltd |
Mantri Webcity2B |
Mantri Developers Private Limited |
Bengaluru Urban |
Cancellation of my booking in the project and refund of entire amount along with interest from the builder |
AUTHORITY
|
BENCH5
|
|
365 |
CMP/201123/0007089 |
23/11/2020
|
17/02/2023
|
ARUN KUMAR SULTANIA |
EXD PROJECTS PRIVATE LIMITED |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
REFUND OF AMOUNT PAID WITH COMPENSATION AND INTEREST |
AUTHORITY
|
BENCH4
|
|
366 |
CMP/201130/0007165 |
30/11/2020
|
17/02/2023
|
KUSH MOHNOT |
EXD PROJECTS PROJECTS PRIVATE LIMITED |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
Refund of amount & EMI with interest |
AUTHORITY
|
BENCH4
|
|
367 |
CMP/210326/0007840 |
26/03/2021
|
17/02/2023
|
MITHALAL SODA |
EXD PROJECTS PRIVATE LIMITED |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
Cancel the Flate and settle all Loans and amount paid with compensation |
AUTHORITY
|
BENCH4
|
|
368 |
CMP/210428/0007934 |
28/04/2021
|
17/02/2023
|
RAJKARAN BAID |
EXD PROJECTS PRIVATE LIMITED MR. C. VIVEKANAND REVAIAH MR. KARNANDA NANAIAH BOPANNA |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
Refund of initial contribution, closure of bank housing loan along with compensation and interest |
AUTHORITY
|
BENCH4
|
|
369 |
CMP/211201/0008660 |
01/12/2021
|
17/02/2023
|
V RAMESH |
EXD PROJECTS PRIVATE LIMITED |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
To cancel the registration and to refund the entire money paid to them including the bank loan amounting to INR 7 lakhs plus interest |
AUTHORITY
|
BENCH4
|
|
370 |
CMP/220618/0009648 |
18/06/2022
|
17/02/2023
|
PUSHPALATHA R BANTWAL |
EXD PROJECTS PRIVATE LIMITED |
Five Rings |
Exd Projects Private Limited |
Bengaluru Urban |
Refund money with penalty |
AUTHORITY
|
BENCH4
|
|
371 |
CMP/210415/0007892 |
15/04/2021
|
16/02/2023
|
Sudha V Iyer |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
To award Delay Compensation of Rs 30,00,000/- (Thirty Lakhs Only) for delay of 58 months in delivery of Possession over Ozone Urbana Pavillion Apartment K -303, a 3BHK Apartment having 1540 Square Ft. |
AUTHORITY
|
BENCH6
|
|
372 |
CMP/210423/0007918 |
23/04/2021
|
16/02/2023
|
Vijaymahantesh Hadaginal |
VAASA VENTURES |
The Hexagon |
M/S Vaasa Ventures |
Dharwad |
Kindly refund the booking amount with interest as per the RERA guidelines |
AUTHORITY
|
BENCH6
|
|
373 |
CMP/200220/0004080 |
20/02/2020
|
16/02/2023
|
ANIL REBELLO |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
refund of amount, interest and compensation |
AUTHORITY
|
BENCH4
|
|
374 |
CMP/200618/0006046 |
18/06/2020
|
16/02/2023
|
LAKSHMANAN BALAKRISHNAN |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED now as called NHDPL SOUTH PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
To get back my investment of Rs.50,00,000 plus interest |
AUTHORITY
|
BENCH4
|
|
375 |
CMP/210120/0007478 |
20/01/2021
|
16/02/2023
|
NACHIKETA TRIVEDI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Help in refund with the applicable interest |
AUTHORITY
|
BENCH4
|
|
376 |
CMP/210312/0007784 |
12/03/2021
|
16/02/2023
|
SHRIKANT SARDA & (2) NAMRATA SARDA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of the amount including interest and penalty |
AUTHORITY
|
BENCH4
|
|
377 |
CMP/220105/0008767 |
05/01/2022
|
16/02/2023
|
AMREETA MAZUMDAR & (2) ARUNAVA SEAL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of the money we gave to NHDPL with interest |
AUTHORITY
|
BENCH4
|
|
378 |
CMP/220205/0008963 |
05/02/2022
|
16/02/2023
|
SHEKHAR SHARAN BHATIYA & (2) RADHA BHATIYA |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED Now called as NHDPL PROPERTIES PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Since project is stalled kindly order builder to refund the money paid with interest. |
AUTHORITY
|
BENCH4
|
|
379 |
CMP/210412/0007883 |
12/04/2021
|
15/02/2023
|
Mahesh B S & MRS. ANUSHA K VENKATESH |
GOLDEN GATE PROPERTIES LIMITED |
Golden Panorama |
GOLDEN GATE PROPERTIES LTD |
Bengaluru Urban |
Interest for delay as prescribed under Section 18 + compensation for mental agony + compensation for loss caused due to default of Promoter to give NOC for availing bank loan |
AUTHORITY
|
BENCH6
|
|
380 |
CMP/211010/0008425 |
10/10/2021
|
15/02/2023
|
BENEDICTA CASTALINO |
T3 URBAN DEVELOPERS LTD |
T3 GREEN CITY |
T3 URBAN DEVELOPERS LTD |
Dakshina Kannada |
yes |
AUTHORITY
|
BENCH6
|
|
381 |
CMP/210714/0008130 |
14/07/2021
|
14/02/2023
|
SAYUZ BASAK |
MAANGALYA CONSTRUCTIONS |
Maangalya Prosper Signature Block |
Maangalya Constructions |
Bengaluru Urban |
(1) Refund Margin-Money together with 100% investment return of Rs.19,57,608.00 with interest (2) Rs.5,20,390.00 arrears of Pre-EMIs’ payable by Developer (3) Discharge Home-Loan of Rs.75,00,000.00 |
AUTHORITY
|
BENCH4
|
|
382 |
CMP/220317/0009147 |
17/03/2022
|
14/02/2023
|
UTKARSH VERMA |
CORPORATE LEISURE AND PROPERTY DEVELOPMENTS PVT LTD |
SUNCITY GLORIA |
CORPORATE LEISURE AND PROPERTY DEVELOPMENTS PVT LTD |
Bengaluru Urban |
Request to RERA to instruct the builder/promoter to start the BWSSB Cauvery water connection in the apartment. |
AUTHORITY
|
BENCH4
|
|
383 |
CMP/211204/0008680 |
04/12/2021
|
13/02/2023
|
VENU DASARI & MRS. RAJESWARI DASARI |
HI LIFE HOMES |
Hi Life Homes - NATURE |
Hi Life HOMES |
Bengaluru Urban |
Return Of amount and compensation |
AUTHORITY
|
BENCH5
|
|
384 |
CMP/200723/0006175 |
23/07/2020
|
13/02/2023
|
Mr. Shivakumara Y L & Mrs. Bhargavi B N |
S L Residential Layout Pvt Ltd |
SHRIRAM BAGESHRI |
SL. Residential Layout Pvt.Ltd |
Bengaluru Urban |
Seeking Refund of Rs.1,00,000/- along with compensation from the date of receipt of amount and any other action against the defendants at the descretion of the Authority |
AUTHORITY
|
BENCH5
|
|
385 |
CMP/210603/0007976 |
03/06/2021
|
13/02/2023
|
Chhavi Agarwal |
SJR Prime Corporation Pvt ltd |
Vogue |
SJR PRIME CORPORATION PVT LTD |
Bengaluru Urban |
REFUND OF MY BOOKING AMOUNT OF RS. 5,00,000/- |
AUTHORITY
|
BENCH5
|
|
386 |
CMP/200902/0005622 |
02/09/2020
|
13/02/2023
|
DEEPAK MAHALIK |
M/S.ROMA BUILDERS |
Roma Epicurean |
M/s.Roma Builders |
Bengaluru Urban |
Not received a single amount and need all the amount to be refunded with interest and compensession |
AUTHORITY
|
BENCH4
|
|
387 |
CMP/200217/0005470 |
17/02/2020
|
13/02/2023
|
AMIT ASHOK PATIL |
SUPERTECH LIMITED |
Supertech Micasa |
SUPERTECH LIMITED |
Bengaluru Urban |
Delay Penalty with interest of old flat (A-303)till Time of Possession or Complete Refund with Interest |
AUTHORITY
|
BENCH4
|
|
388 |
CMP/UR/190715/0003335 |
15/07/2019
|
13/02/2023
|
KARTHIK R |
EXCEL HYDE PARK VENTURES PVT.LTD |
Excel Hyde Park |
Excel Hyde Park ventures Pvt LTD |
Bengaluru Urban |
Refund along with interest or possession of site. |
AUTHORITY
|
BENCH4
|
|
389 |
CMP/220328/0009273 |
28/03/2022
|
11/02/2023
|
Karthic Raj S |
NITESH MELBOURSE PARK |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
I would request that Nitesh estates refunds my amount in full with Interest and penalty fee for the delay of more than 7 years . |
AUTHORITY
|
BENCH5
|
|
390 |
CMP/220307/0009084 |
07/03/2022
|
11/02/2023
|
Dsouza Prakash |
Nitesh Housing Developers Pvt Ltd. |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refunds of advance payment paid to Nitesh Housing Developers with interest |
AUTHORITY
|
BENCH5
|
|
391 |
CMP/210717/0008134 |
17/07/2021
|
11/02/2023
|
ASHWINI MADAPPA M |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Mysore |
Refund of INR 30.23 lakhs (fully paid amount) + applicable interest for delays |
AUTHORITY
|
BENCH5
|
|
392 |
CMP/201115/0007063 |
15/11/2020
|
11/02/2023
|
MERILIN STANLEY & STANLEY FRANCIS |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Rs 40,00,000/- |
AUTHORITY
|
BENCH4
|
|
393 |
CMP/211215/0008731 |
15/12/2021
|
11/02/2023
|
MRS NUZHAT SULTANA |
LEGACY GLOBAL PROJECTS PRIVATE LIMITED |
Legacy Vivienda |
Legacy Global Projects Private Limited |
Bengaluru Urban |
a) Repayment of sum of Rs. 18,99,000/- paid by the Complainant towards the purchase of the Flat No.C-402 in the Respondent Project, b) Pay Compensation of Rs. 50,00,000/- towards loss on investment |
AUTHORITY
|
BENCH5
|
|
394 |
CMP/201207/0007095 |
07/12/2020
|
11/02/2023
|
RASHMI KOTHARI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Total amount paid of Rs. 4399730/ + Interest @ 18% pa. |
AUTHORITY
|
BENCH4
|
|
395 |
CMP/210224/0007692 |
24/02/2021
|
11/02/2023
|
SHISHIR SHETTY |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Hyde Park Phase II |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Sum of total amount demanded and payable to applicants is Rs. 1,22,26,536.92/- (Rupees One Crore Twenty-Two Lakh Twenty-Six Thousand Five Hundred Thirty Six and Paisa Ninety Two Only) plus interest |
AUTHORITY
|
BENCH6
|
|
396 |
CMP/221115/0010333 |
15/11/2022
|
11/02/2023
|
PARNAVEE DHAPADE |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Looking forward for the refund of rent paid for another flat throughout the year OR reducing the agreement amount. I need help of Rs. 4 Lacs (Rs. 4,00,000/-) for our sufferings. |
AUTHORITY
|
FULLBENCH
|
|
397 |
CMP/221107/0010188 |
07/11/2022
|
11/02/2023
|
SANGEETHA JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
I request your good office to direct developer to early handover of possession of duly Completed flat in my name and pay interest of 18% pa from the date of promise to till the date of actual handover |
AUTHORITY
|
FULLBENCH
|
|
398 |
CMP/221209/0010444 |
09/12/2022
|
11/02/2023
|
PRAVEEN KUMAR KANNI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation with 18% per annum interest rate till date for the amount paid and for further delay. No RERA extensions & No new tower register without complainants consent. |
AUTHORITY
|
FULLBENCH
|
|
399 |
CMP/221205/0010420 |
05/12/2022
|
11/02/2023
|
RAGU SUNDARARAJAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
I request RERA to kindly prevail upon the Developer to hand over the flat to me in completed condition and also get me the compensation for the delay period |
AUTHORITY
|
FULLBENCH
|
|
400 |
CMP/220812/0009882 |
12/08/2022
|
11/02/2023
|
DR SUREKHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
delay compensation |
AUTHORITY
|
BENCH4
|
|
401 |
CMP/221020/0010115 |
20/10/2022
|
11/02/2023
|
ANIL GAUTAMCHAND KANKLIYA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit. |
AUTHORITY
|
FULLBENCH
|
|
402 |
CMP/221130/0010415 |
30/11/2022
|
11/02/2023
|
SANTHOSH RAJAN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Seeking appropriate compensation for delays along with interest. I seek Rs. 80,000per month for every month of delay since 31-Dec-2019 + 9.5% interest per annum as compensation. |
AUTHORITY
|
FULLBENCH
|
|
403 |
00140/2023 |
31/01/2023
|
11/02/2023
|
ASHOK SATYAMURTHY |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for the delay in handing over our flat MC 002. |
AUTHORITY
|
FULLBENCH
|
|
404 |
CMP/220804/0009852 |
04/08/2022
|
11/02/2023
|
HIRALAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Kindly help us getting compensation as per RERA guildelines , already we are paying EMI |
AUTHORITY
|
BENCH4
|
|
405 |
CMP/221216/0010464 |
16/12/2022
|
11/02/2023
|
MADHU SINGH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Since it has been too long time and still they are extending the due date for handover, We request you to kindly get us the compensation as per RERA Guidelines. |
AUTHORITY
|
FULLBENCH
|
|
406 |
CMP/220813/0009890 |
13/08/2022
|
11/02/2023
|
SUNITHA KOTRESH |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
RETURN OF AMOUNT AND COMPENSATION |
AUTHORITY
|
BENCH4
|
|
407 |
CMP/221110/0010243 |
10/11/2022
|
11/02/2023
|
KUNAL M JAIN |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation in delay in delivery as the initial delivery was on 31st dec 2019. |
AUTHORITY
|
FULLBENCH
|
|
408 |
00089/2023 |
17/01/2023
|
11/02/2023
|
LALITH KUMAR |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Delay Compensation |
AUTHORITY
|
FULLBENCH
|
|
409 |
CMP/221112/0010256 |
12/11/2022
|
11/02/2023
|
KANCHAN GUPTA |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Interest as per RERA rules for delayed period |
AUTHORITY
|
FULLBENCH
|
|
410 |
CMP/221217/0010477 |
17/12/2022
|
11/02/2023
|
SIDDALINGA SWAMY M |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation with 18% annum interest rate till date. Monthly compensation with 18% interest for further delay.No rera extension and no new tower registration. |
AUTHORITY
|
FULLBENCH
|
|
411 |
00015/2023 |
04/01/2023
|
11/02/2023
|
KISHORE M JAIN |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay in delivery of the property as the same was to be deilvered by 31st dec 2019. |
AUTHORITY
|
FULLBENCH
|
|
412 |
CMP/221020/0010116 |
20/10/2022
|
11/02/2023
|
NEELAM KANKALIYA |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit. |
AUTHORITY
|
FULLBENCH
|
|
413 |
CMP/220804/0009850 |
04/08/2022
|
11/02/2023
|
OM BHAVESH PAREKH |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation and Interest of 18% Per annum till date . Monthly compensation with 18% rate & monthly rent for further delay. No RERA extension & new tower launch register without complainants content |
AUTHORITY
|
BENCH4
|
|
414 |
CMP/220820/0009922 |
20/08/2022
|
11/02/2023
|
KAILASH KUMAR PARASMAL JAIN |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay of Our Flat MAPLE MA2403 |
AUTHORITY
|
BENCH4
|
|
415 |
00168/2023 |
06/02/2023
|
11/02/2023
|
HITESH C FOFARIA |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay of possession with 18%.p.a interest on the total amount paid for the flat from December 2019 till the date of possession of flat. |
AUTHORITY
|
FULLBENCH
|
|
416 |
00196/2023 |
10/02/2023
|
11/02/2023
|
RAFEEK A K |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay. No RERA extensions & new tower register without complainants consent. |
AUTHORITY
|
FULLBENCH
|
|
417 |
CMP/221228/0010543 |
28/12/2022
|
11/02/2023
|
HARISH PREMJI GAMI |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation from builder. |
AUTHORITY
|
FULLBENCH
|
|
418 |
CMP/220321/0009202 |
21/03/2022
|
11/02/2023
|
KAMLESH MUNOT |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover . Also any other relief which authority deems fit. |
AUTHORITY
|
BENCH4
|
|
419 |
CMP/220517/0009479 |
17/05/2022
|
11/02/2023
|
SUNIL KUMAR JAIN |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
To instruct the builder to deliver the flat at the earliest & to allot compensation, interest for the delayed period till the actual handover. Also any other relief which authority deems fit |
AUTHORITY
|
BENCH4
|
|
420 |
CMP/221217/0010476 |
17/12/2022
|
11/02/2023
|
VINAY K M |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for the delay with applicable interest till date. No RERA extensions/registrations without complaint consent |
AUTHORITY
|
FULLBENCH
|
|
421 |
00197/2023 |
10/02/2023
|
11/02/2023
|
MANSOOR CH |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for the delay . No RERA extensions and new tower register without complainants consent. |
AUTHORITY
|
FULLBENCH
|
|
422 |
CMP/221112/0010255 |
12/11/2022
|
11/02/2023
|
CHATNA H |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Want compensation for delay or full payment back with interest |
AUTHORITY
|
FULLBENCH
|
|
423 |
CMP/200810/0006332 |
10/08/2020
|
11/02/2023
|
R SREERAM ANVESH |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund, Interest, Compensation for mental agony and Legal Cost |
AUTHORITY
|
BENCH4
|
|
424 |
CMP/201213/0007255 |
13/12/2020
|
11/02/2023
|
RANJIT NAMBIAR |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Help in refund. |
AUTHORITY
|
BENCH4
|
|
425 |
CMP/220112/0008777 |
12/01/2022
|
11/02/2023
|
MUKUND MADHAV AGARWAL |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of Money with Interest |
AUTHORITY
|
BENCH4
|
|
426 |
CMP/221215/0010463 |
15/12/2022
|
11/02/2023
|
TEENA K JAIN |
VASATHI HOUSING LTD |
VASATHI AVANTE |
Vasathi Housing Ltd |
Bengaluru Urban |
kindly direct the Respondent to register Sale Deed and also award the Complainant with Rs.1,00,000/- Compensation for the delay in registering the Sale Deed. and pass any other order |
AUTHORITY
|
FULLBENCH
|
|
427 |
CMP/200927/0006666 |
27/09/2020
|
11/02/2023
|
MAHESH KUMAR JAIN |
MANTRI CASTLES PVT LTD |
Mantri Serenity3 |
Mantri Castles Pvt Ltd |
Bengaluru Urban |
As prayed in the Facts of Case |
AUTHORITY
|
BENCH4
|
|
428 |
00106/2023 |
20/01/2023
|
11/02/2023
|
ABID HUSSAIN SHA |
PARKWEST - MAPLE - TOWER 4 |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
compensation for delay |
AUTHORITY
|
FULLBENCH
|
|
429 |
CMP/211019/0008449 |
19/10/2021
|
11/02/2023
|
BABITHA P |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Delay in completion and handover of flat, Flat hand over and registration Immediately |
AUTHORITY
|
BENCH4
|
|
430 |
CMP/221212/0010449 |
12/12/2022
|
11/02/2023
|
PANCHAKSHARI KANNI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation at 18% per annum interest rate till date and for any further delay. No Rera extensions & No new tower to be registered |
AUTHORITY
|
FULLBENCH
|
|
431 |
CMP/221104/0010178 |
04/11/2022
|
11/02/2023
|
K BABULAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation For Delay in delivery as the initial delivery date was 31st dec 2019 |
AUTHORITY
|
FULLBENCH
|
|
432 |
CMP/211109/0008528 |
09/11/2021
|
11/02/2023
|
SINGAL JITESH |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Sought Compensation for this extensive delay in completion of project |
AUTHORITY
|
BENCH4
|
|
433 |
CMP/221114/0010271 |
14/11/2022
|
11/02/2023
|
ANUSHA BEESETTI |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation with Interest for the delayed period. Early possession of the flat. No RERA extensions &new tower registrations without complainants' consent |
AUTHORITY
|
FULLBENCH
|
|
434 |
CMP/220517/0009474 |
17/05/2022
|
11/02/2023
|
BHARAT KUMAR JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
SEEKING COMPOUND INTEREST @ 24% TILL THE POSSESION |
AUTHORITY
|
BENCH4
|
|
435 |
CMP/220707/0009729 |
07/07/2022
|
11/02/2023
|
SUDEEP KABI |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Cancellation of Unit No. D-0307 along with refund of Rs. 20,75,869/- with 18% interest p.a and compensation of Rs. 5,00,000/- for delay |
AUTHORITY
|
BENCH5
|
|
436 |
CMP/210908/0008312 |
08/09/2021
|
11/02/2023
|
SATISH SHRIVASTAVA |
ARATT CITYSCAPES PROJECT LLP |
ARATT CITYSCAPES |
ARATT CITYSCAPES PROJECT LLP |
Bengaluru Urban |
To direct the builder for refund (with interest and compensation). Refunded partially. Still 2.5 Lakhs (in actual) with builder from last 1.2 years |
AUTHORITY
|
BENCH5
|
|
437 |
00201/2023 |
11/02/2023
|
11/02/2023
|
ANIL KUMAR P V |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Project completion to happen at the earliest |
AUTHORITY
|
FULLBENCH
|
|
438 |
00001/2023 |
02/01/2023
|
11/02/2023
|
M G ASHOK RAO |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Developer to provide Electricity, Water, STP ,Common areas, club house. Form and hand over owners' association, sinking fund. Compensation for delay to be paid @18% p.a. of total payment made , |
AUTHORITY
|
FULLBENCH
|
|
439 |
CMP/221110/0010240 |
10/11/2022
|
11/02/2023
|
BINU MOOLAKARA CHACKO |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project & expedite completion of Project as per Sale / Maintenance agreement, return of corpus funds & formation of association |
AUTHORITY
|
BENCH4
|
|
440 |
00190/2023 |
09/02/2023
|
11/02/2023
|
MAYUKH MAHAPATRA |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project and expedite completion of project as per sale agreement, return of sinking fund and formation of association |
AUTHORITY
|
FULLBENCH
|
|
441 |
00204/2023 |
11/02/2023
|
11/02/2023
|
A.N SHIVKUMAR |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for delayed project and Expedite completion as per sale agreement, return of corpus fund and formation of association , sinking fund should be returned to the association in full |
AUTHORITY
|
FULLBENCH
|
|
442 |
00203/2023 |
11/02/2023
|
11/02/2023
|
JAGDEEP SINGH SHOKEEN |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Timely completion and refund of monetary loss incurred |
AUTHORITY
|
FULLBENCH
|
|
443 |
CMP/220625/0009688 |
25/06/2022
|
11/02/2023
|
SAMATHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation and house rent with 18% per annum interest till date monthly compensation with 18% rate & monthly rental for further delay. No RERA extensions & new tower register without complainants c |
AUTHORITY
|
BENCH4
|
|
444 |
00192/2023 |
09/02/2023
|
11/02/2023
|
RAJESH DWIVEDI |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
compensation for delayed project and to expedite completion project as per sale /maintenance agreement, return of corpus funds and formation of association |
AUTHORITY
|
FULLBENCH
|
|
445 |
00202/2023 |
11/02/2023
|
11/02/2023
|
RADHAKRISHNAN AYYAPPANAICKER |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Compensation for the delay and complete the amenities |
AUTHORITY
|
FULLBENCH
|
|
446 |
00084/2023 |
17/01/2023
|
11/02/2023
|
HAFIZUNNISA M |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
CASAGRAND HAZEN |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
Bengaluru Urban |
Please be advised to adhere to Karnataka RERA clause. As per RERA clause the builder has to refund the entire booking amount without any deduction if the sale agreement is not executed and registered |
AUTHORITY
|
BENCH4
|
|
447 |
CMP/221221/0010505 |
21/12/2022
|
11/02/2023
|
NAVEEN ANGURALA |
GAZY MAG PVT LTD |
CASAGRAND BOULEVARD |
GAZY MAG PVT LTD |
Bengaluru Urban |
Full refund of booking amount |
AUTHORITY
|
BENCH4
|
|
448 |
CMP/220404/0009308 |
04/04/2022
|
11/02/2023
|
Anand Kumar Verma |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Please help me to get my principal and interest amount from Nitesh |
AUTHORITY
|
BENCH4
|
|
449 |
CMP/201213/0007112 |
13/12/2020
|
11/02/2023
|
JITENDRA HARICHANDAN |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Melbourne Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund with Compensation for Paid Installments |
AUTHORITY
|
BENCH4
|
|
450 |
CMP/UR/221110/0010242 |
10/11/2022
|
11/02/2023
|
V Anilkumar |
Sree Krishna developers and promoters |
Excise Layout |
Sree Krishna developers and promoters |
Bengaluru Urban |
Should get the site registered with the same price as committed in the sale agreement and pay penalty. |
AUTHORITY
|
BENCH4
|
|
451 |
CMP/UR/221110/0010241 |
10/11/2022
|
11/02/2023
|
Sunil Kumar Vengalil |
Shree Krishna developers and promoters |
Excise Layout |
Shree Krishna developers and promoters |
Bengaluru Urban |
Should get the site registered with the same price as mentioned in the sale agreement and pay the penalty |
AUTHORITY
|
BENCH4
|
|
452 |
CMP/220908/0009986 |
08/09/2022
|
11/02/2023
|
SUNIT NEVETIA |
NITESH ESTATES LIMITED |
Nitesh Long Island |
NITESH ESTATES LIMITED |
Bengaluru Urban |
Nitesh Long Island |
AUTHORITY
|
BENCH4
|
|
453 |
CMP/200302/0003738 |
02/03/2020
|
11/02/2023
|
Badri Krishnan |
P V Ravindra Kumar |
VASATHI AVANTE |
Vasathi Housing Ltd |
Bengaluru Urban |
Compensation and enforce registration |
AUTHORITY
|
FULLBENCH
|
|
454 |
CMP/UR/201007/0006780 |
07/10/2020
|
10/02/2023
|
Sushesh Mallya |
OZONE GROUP |
Ozone Urbana Pavillion |
Ozone Group |
Bengaluru Urban |
Respondent to pay a sum of Rs 25,00,000/- (Twenty Five Lakhs Only) for delay in completing the construction over Schedule Property by obtaining Occupancy Certificate payable to Complainant |
AUTHORITY
|
BENCH6
|
|
455 |
CMP/UR/201007/0006778 |
07/10/2020
|
10/02/2023
|
K Gururaj |
OZONE GROUP |
Ozone Urbana Pavillion |
Ozone Group |
Bengaluru Urban |
Compensation for unimaginable delay of 4 years computed at 25,00,000/- (Rupees Twenty Five Lakhs Only) payable to the Complainant from the Builder Ozone Group. |
AUTHORITY
|
BENCH6
|
|
456 |
CMP/220430/0009402 |
30/04/2022
|
10/02/2023
|
Sunil Suresh |
ROCKLINES HOUSING DEVELOPMENT PVT LTD |
ROCKLINES SEETHALAKSHMI |
ROCKLINES HOUSING DEVELOPMENT PVT LTD |
Bengaluru Urban |
As mentioned in paragraph 2 in the above field. |
AUTHORITY
|
BENCH4
|
|
457 |
CMP/UR/200531/0005945 |
31/05/2020
|
09/02/2023
|
willibroid denzil pereira |
M/S HOSKOTE NEO HOMES LTD |
EMPRASA KNOWLEDGE PARK |
M/S HOSKOTE NEO HOMES LTD |
Bengaluru Urban |
REFUND OF PAYMENT WITH PAYOUTS MENTIONED IN THE ALLOTMENT AGREEMENT FROM 3 YEARS AMOUNTING OF TOTAL RS 17,18,400/- |
AUTHORITY
|
BENCH5
|
|
458 |
CMP/UR/210723/0008152 |
23/07/2021
|
08/02/2023
|
MOHAMMED SAMIULLA |
GODREJ AQUA |
|
|
Bengaluru Urban |
we kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
AUTHORITY
|
FULLBENCH
|
|
459 |
CMP/UR/210723/0008153 |
23/07/2021
|
08/02/2023
|
MOHAMMED SAMIULLA |
GODREJ AQUA |
|
|
Bengaluru Urban |
kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
AUTHORITY
|
FULLBENCH
|
|
460 |
CMP/UR/210723/0008154 |
23/07/2021
|
08/02/2023
|
MOHAMMED SAMIULLA |
HEMA JOSHI |
|
|
Bengaluru Urban |
kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
AUTHORITY
|
FULLBENCH
|
|
461 |
CMP/UR/210723/0008155 |
23/07/2021
|
08/02/2023
|
MOHAMMED SAMIULLA |
GODREJ AQUA |
|
|
Bengaluru Urban |
we kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
AUTHORITY
|
FULLBENCH
|
|
462 |
CMP/UR/210723/0008156 |
23/07/2021
|
08/02/2023
|
MOHAMMED SAMIULLA |
GODREJ AQUA |
|
|
Bengaluru Urban |
kindly request RERA to direct the respondent to cancel the agreement as per termination agreement. |
AUTHORITY
|
FULLBENCH
|
|
463 |
CMP/220818/0009913 |
18/08/2022
|
07/02/2023
|
Swaroop Shiv Shankar |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LTD |
SOWPARNIKA COLUMNS |
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT. LTD. |
Bengaluru Urban |
Please help in getting the final refund of 20001 rs |
AUTHORITY
|
BENCH6
|
|
464 |
CMP/220720/0009779 |
20/07/2022
|
07/02/2023
|
SHANKAR RAMAN IYER |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Firm Date on Handover in livable condition and compensation for delay |
AUTHORITY
|
BENCH6
|
|
465 |
CMP/221220/0010489 |
20/12/2022
|
07/02/2023
|
KUMAR SAURABH & SANGEETA KUMAR SAURABH |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Expedition of possession and payment from builder for the entitled compensation. |
AUTHORITY
|
BENCH6
|
|
466 |
CMP/201214/0007247 |
14/12/2020
|
07/02/2023
|
Siddharth Sinha |
shriram properties pvt ltd |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
to direct the Respondent to cancel allocation of Apartment, Agreement of Sale, refund Booking Amount with Interest and foreclose loan with costs. |
AUTHORITY
|
BENCH5
|
|
467 |
CMP/220430/0009406 |
30/04/2022
|
07/02/2023
|
SURAJIT NATH & BIPASHA MAZUMDAR |
ARYAN HOMETEC PRIVATE LIMITED |
ARYAN GOLDEN ARENA - G |
ARYAN HOMETEC PVT LTD |
Bengaluru Urban |
Praying for refund of amount , cancellation of Booked Apartment and Closure of Home Loan |
AUTHORITY
|
BENCH4
|
|
468 |
CMP/220524/0009520 |
24/05/2022
|
07/02/2023
|
ABHILASH SISUPALAN |
REDDY STRUCTURES PRIVATE LIMITED |
MAHAVEER TURQUOISE |
REDDY STRUCTURES PRIVATE LIMITED |
Bengaluru Urban |
Immediate cancellation of flat with all compensation as per RERA |
AUTHORITY
|
BENCH4
|
|
469 |
CMP/200730/0006277 |
30/07/2020
|
06/02/2023
|
JOE ULFRIC S |
SANDS INFRATECH DEVELOPERS INDIA PRIVATE LIMITED |
SANDS GATEWAY |
SANDS INFRATECH DEVELOPERS INDIA PRIVATE LIMITED |
Bengaluru Rural |
Request for refund of amount paid to the builder including the Interest and Principal paid to the bank.c |
AUTHORITY
|
BENCH4
|
|
470 |
CMP/220202/0008912 |
02/02/2022
|
06/02/2023
|
Malati Harish |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
re-payment of Loan and pay back PRE-EMI money paid with interest and compensation |
AUTHORITY
|
BENCH6
|
|
471 |
CMP/UR/190601/0002385 |
01/06/2019
|
06/02/2023
|
T.S.UMAPATHI |
INDO GREEN RESORTS PVT.LTD |
INDO GREEN RESORTS PVT. LTD. |
INDO GREEN RESORTS PVT.LTD |
Bengaluru Urban |
PLEASE REGISTER THE SAID WINNING PLOT IN MY NAME. |
AUTHORITY
|
BENCH4
|
|
472 |
CMP/201113/0007055 |
13/11/2020
|
06/02/2023
|
Dr ASHA A |
B C V DEVELOPERS PVT .LTD. |
Juniper at Brigade Orchards |
BCV Developers Pvt Ltd |
Bengaluru Urban |
award refund of entire sale consideration with interest at the rate of 18% from the date of remittance till to realization, award damages for having violated the agreed terms, pass any other order/s |
AUTHORITY
|
FULLBENCH
|
|
473 |
CMP/210525/0007959 |
25/05/2021
|
06/02/2023
|
BINU CHELLAPPAN |
SHRIRAM PROPERTIES PVT LTD |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
REFUND OR BETTER COMPENSATION FOR THE DELAY |
AUTHORITY
|
BENCH5
|
|
474 |
CMP/220129/0008883 |
29/01/2022
|
03/02/2023
|
S A RAMESH BABU |
BRIGADE ENTERPRISES LTD |
Plumeria Lifestyle at Brigade Meadows |
Brigade Enterprises Ltd |
Bengaluru Urban |
Dear Sir, Kindly arrange to Refund Rs. 21,00,000.00 (Twenty One Lakhs) from Brigade Meadows PLumeria Lifestyle - Brigade Enterprises Limited |
AUTHORITY
|
BENCH4
|
|
475 |
CMP/220113/0008787 |
13/01/2022
|
03/02/2023
|
MADHUSUDHAN GATTAMANENI |
BRIGADE ENTERPRISES LTD |
Plumeria Lifestyle at Brigade Meadows |
Brigade Enterprises Ltd |
Bengaluru Urban |
help me recover by 20,000/- |
AUTHORITY
|
BENCH4
|
|
476 |
CMP/UR/210701/0008089 |
01/07/2021
|
03/02/2023
|
SHIVAKUMAR Y C |
RELATIONSHIP PROPERTIES PVT LTD. |
Park West - Maple Tower |
Relationship Properties Pvt Ltd. |
Bengaluru Urban |
Return amount of amount of Rs.40,55,965-22, penal interest and compensation as per Karnataka RERA Act |
AUTHORITY
|
BENCH4
|
|
477 |
CMP/221029/0010149 |
29/10/2022
|
03/02/2023
|
MUKESH RANJANDAS PAREKH |
ASSETZ MARK |
ASTRUM GRANDVIEW MYSORE PHASE - I:::PRM/KA/RERA/1268/378/PR/171019/000373 |
Astrum Value Homes Private Limited |
Bengaluru Urban |
Direct the Respondent to take necessary action to fulfil contractual obligations, assurances and promises in terms of agreement and sale deed, brochures and advertisements to provide all amenities. |
AUTHORITY
|
FULLBENCH
|
|
478 |
CMP/221202/0010419 |
02/12/2022
|
03/02/2023
|
MUKESH RANJANDAS |
ASSETZ MARQ |
Assetz Marq |
Assetz Whitefiled homes private limited |
Bengaluru Urban |
LEVY OF PENALTY UNDER SECTION 63 OF THE ACT & PAYMENT OF MAINTENENCE CHARGES UPTO THE DATE OF REGISTRATION OF SALE DEED AND HAND OVER OF POSSESSION |
AUTHORITY
|
FULLBENCH
|
|
479 |
CMP/201109/0006953 |
09/11/2020
|
02/02/2023
|
MAHENDRA KUMAR GURJAR |
SHRIPROP DEVELOPERS PVT LTD |
SHRIRAM LIBERTY SQUARE |
Shriprop Developers Private Limited |
Bengaluru Urban |
please support me to get back my token amount |
AUTHORITY
|
BENCH5
|
|
480 |
CMP/220112/0008780 |
12/01/2022
|
02/02/2023
|
RADHA J EAPEN |
FIRE LUXUR |
FIRE Luxur Developers Private Limited |
FIRE Luxur Developers Private Limited |
Bengaluru Urban |
5. Further to 4 prayers above, restrain Promoter from service charge levy for attending to maintenance issues at registered units. Such payments till date to be adjusted against future maintenance fee |
AUTHORITY
|
BENCH5
|
|
481 |
CMP/220112/0008781 |
12/01/2022
|
02/02/2023
|
PARAG SESHRAO LANGDE & POONAM PARAG LANGDE |
FIRE LUXUR DEVELOPERS PVT LTD |
FIRE Luxur Developers Private Limited |
FIRE Luxur Developers Private Limited |
Bengaluru Urban |
5. Further to 4 prayers above, restrain Promoter from service charge levy for attending to maintenance issues at registered units. Such payments till date to be adjusted against future maintenance fee |
AUTHORITY
|
BENCH5
|
|
482 |
CMP/220112/0008782 |
12/01/2022
|
02/02/2023
|
JAVEESH KUMAR & RICHA SHARMA |
FIRE LUXUR DEVELOPERS PVT LTD |
FIRE Luxur Developers Private Limited |
FIRE Luxur Developers Private Limited |
Bengaluru Urban |
5. Further to 4 prayers above, restrain Promoter from service charge levy for attending to maintenance issues at registered units. Such payments till date to be adjusted against future maintenance fee |
AUTHORITY
|
BENCH5
|
|
483 |
CMP/210204/0007467 |
04/02/2021
|
02/02/2023
|
HAMEEDA BEGUM A |
MANTRI WEBCITY 2A |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
Refund of amount paid and compensation of the losses incurred by interests, inflation etc due to delay in flats. |
AUTHORITY
|
BENCH5
|
|
484 |
CMP/220316/0009128 |
16/03/2022
|
02/02/2023
|
VINAY SINGH |
EMPRASA STARTUP CITY-RESIDENTIAL |
Emprasa Startup City - Residential |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
I WANT MY MY MONEY BACK AND CANCAL MY BOOKING |
AUTHORITY
|
BENCH5
|
|
485 |
CMP/UR/221010/0010065 |
10/10/2022
|
02/02/2023
|
Vinita Padubidri |
State excise multipurpose co-operative society |
Excise Layout |
State excise multipurpose co-operative society |
Bengaluru Urban |
I request RERA court to ensure that the society and developer execute the of Rs. 699 sq. ft price as per the sale agreement as I have paid all 4 instalments on time without any delay! Thank you! |
AUTHORITY
|
BENCH4
|
|
486 |
CMP/UR/221013/0010095 |
13/10/2022
|
02/02/2023
|
Narendra Kumar K |
M/S. State Excise Multipurpose Co-Operative Society Ltd. |
Excise Layout |
M/S. State Excise Multipurpose Co-Operative Society Ltd. |
Bengaluru Urban |
As all the requested payments were made in due time and loses incurred to society/developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
AUTHORITY
|
BENCH4
|
|
487 |
CMP/210615/0007999 |
15/06/2021
|
31/01/2023
|
ABHISHEK SAINI |
SHRIRAM SUMMITT |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Compensation on Account of Delay in Possession |
AUTHORITY
|
BENCH5
|
|
488 |
CMP/UR/221226/0010532 |
26/12/2022
|
31/01/2023
|
Fakruddin P M |
M/s Sree Krishna Developers And Promoters |
Excise Layout |
M/s Sree Krishna Developers And Promoters |
Bengaluru Urban |
Kindly give compensation as mentioned in the sale agreement point No.6, which is the prevailing bank interest on the total amount paid by the purchaser/member. also mentioned that the interest amount |
AUTHORITY
|
BENCH4
|
|
489 |
CMP/UR/221226/0010533 |
26/12/2022
|
31/01/2023
|
k Abdul Bari |
M/s Sree Krishna Developers And Promoters |
Excise Layout |
M/s Sree Krishna Developers And Promoters |
Bengaluru Urban |
Kindly give compensation as mentioned in the sale agreement point No.6, which is the prevailing bank interest on the total amount paid by the purchaser/member. also mentioned that the interest amount |
AUTHORITY
|
BENCH4
|
|
490 |
CMP/UR/190321/0002480 |
21/03/2019
|
31/01/2023
|
DP SUBBARAMAIAH |
DHRUTHI INFRA PROJECTS LTD |
Dhruthi Tranquil Towers |
Dhruthi Infra Projects Ltd |
Bengaluru Urban |
Summon the officials & MD of Dhruthi Infra Project |
AUTHORITY
|
BENCH4
|
|
491 |
CMP/UR/191022/0002501 |
22/10/2019
|
31/01/2023
|
PRUTHVI BA |
JAYACHANDRA REDDY |
Vallabha Vayusutha |
Jayachandra Reddy |
Bengaluru Urban |
Rectification of the above said by builder |
AUTHORITY
|
BENCH4
|
|
492 |
CMP/201006/0006773 |
06/10/2020
|
31/01/2023
|
DIVYA BHARGAVI |
M/S. AZEEM INFINITE DWELLING INDIA PRIVATE LIMITED |
GM ELEGANCE TOWER PHASE 2 Tower E13 |
M/s. AZEEM INFINITE DWELLING INDIA PRIVATE LIMITED |
Bengaluru Urban |
Refund the booking amount Rs.92,500 |
AUTHORITY
|
BENCH4
|
|
493 |
CMP/201001/0006743 |
01/10/2020
|
31/01/2023
|
PRAMOD KUMAR |
HARISH KUMAR VISHWAJEET |
|
|
Bengaluru Urban |
No |
AUTHORITY
|
BENCH4
|
|
494 |
CMP/UR/200929/0006711 |
29/09/2020
|
31/01/2023
|
MURALI KRISHNAN |
MURALI KRISHNAN DS MAX PROPERTIES |
DS MAX Skylish |
DS MAX Properties |
Bengaluru Rural |
Compensation for the delay & legal action against builder |
AUTHORITY
|
BENCH4
|
|
495 |
CMP/UR/200909/0006542 |
09/09/2020
|
31/01/2023
|
SHIVARANJAN A |
MANJUNATH ADITYA TOWNSHIP PROMOTERS |
Aditya Kingston Residency |
Aditya Township Promoters |
Bengaluru Urban |
For my advance of 5 lak need refund with Interest |
AUTHORITY
|
BENCH4
|
|
496 |
CMP/UR/190518/0003072 |
18/05/2019
|
31/01/2023
|
R MOHAN RAJ |
EXCEL HYDE PARK VENTURES PVT.LTD |
Excel Hyde Park Ventures |
Excel Hyde park |
Bengaluru Urban |
Complete Refund with Interest. |
AUTHORITY
|
BENCH4
|
|
497 |
CMP/UR/190518/0003071 |
18/05/2019
|
31/01/2023
|
ELLENGO .S |
EXCEL HYDE PARK VENTURES PVT.LTD |
Excel Hyde Park Ventures Pvt Ltd |
Excel |
Bengaluru Urban |
Refund with Interest |
AUTHORITY
|
BENCH4
|
|
498 |
CMP/200623/0005433 |
23/06/2020
|
31/01/2023
|
RAJNUSH AGARWAL |
SNEHA BV |
|
|
Bengaluru Urban |
Immediate Payment of Outstanding dues, Registration of Sale Deed, Payment of interest for delayed payments and related penalties for non registration with the stipulated time period |
AUTHORITY
|
BENCH4
|
|
499 |
CMP/180110/0000394 |
10/01/2018
|
31/01/2023
|
LATHA AND RAVI SHANKAR |
N. SRINIVASA |
Vaishnavi Mandara,Vaishnavi Mandara |
Vaishnavi Infrastructure Corridor Pvt Ltd |
Bengaluru Urban |
Register flat without paying additional money |
AUTHORITY
|
FULLBENCH
|
|
500 |
CMP/220430/0009401 |
30/04/2022
|
31/01/2023
|
Mohit Mathur |
VSan Infrastructure Pvt Ltd |
Kaveri |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
Refund of amount for the properties along with interest |
AUTHORITY
|
BENCH4
|
|
501 |
CMP/210304/0007745 |
04/03/2021
|
31/01/2023
|
Umar Shaik |
VSan Infrastructure Pvt Ltd |
Kaveri |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
They are not allowing me to cancel agreement. My humble request to you is to help me getting my money back, which i have saved for the future of my children |
AUTHORITY
|
BENCH4
|
|
502 |
CMP/200802/0006292 |
02/08/2020
|
30/01/2023
|
H N Gorakshanath |
MAXWORTH REALTY INDIA LIMITED |
MAX MADHURA |
MAXWORTH REALTY INDIA LIMITED |
Bengaluru Urban |
Direct the builder to pay my amount along with housing loan rate of interest prevailing at the time of my payments to them and lumpsum compensation as per RERA for causing harassment and mental agony. |
AUTHORITY
|
BENCH6
|
|
503 |
CMP/220323/0009241 |
23/03/2022
|
30/01/2023
|
DEBESH CHANDRA PAL & MADHUMITA PAL |
COMFORT BUILDERS & DEVELOPERS |
Comfot Heights |
Comfort Builders and Developers |
Bengaluru Urban |
I request for refund of the entire paid amount of Rs. 64 Lac plus interest plus whatever deemed fit by RERA |
AUTHORITY
|
BENCH6
|
|
504 |
CMP/210313/0007785 |
13/03/2021
|
30/01/2023
|
Swarn Kant & Akanksha Gaur |
SKYLINE CONSTRUCTIONS & HOUSING PRIVATE LIMITED |
Skyline Retreat |
skyline constructions & Housing pvt ltd |
Bengaluru Urban |
Full refund of my money with 12% interest plus Rs 1,000,000 compensation of the mental harassment me and my family went through all these years. |
AUTHORITY
|
BENCH6
|
|
505 |
CMP/210303/0007735 |
03/03/2021
|
30/01/2023
|
SHREENATH MAHINDRAKAR |
AKHIL CONSTRUCTIONS VASAVI NAGAR, GOKUL ROAD, DHARWAD- 580030 |
KALYANA VENKATESH NIVASA |
AKHIL CONSTRUCTIONS |
Dharwad |
Interest on delay in delivery, compensation for flat features not as per brochure and early possession of flat |
AUTHORITY
|
BENCH4
|
|
506 |
CMP/210420/0007911 |
20/04/2021
|
25/01/2023
|
NITIN VERMA & BINA CHANDRAVANSHI |
VENKAT ESTATES PRIVATE LIMITED |
VENKAT WINDSOR EAST |
Venkat Estates Private Limited |
Bengaluru Urban |
Delay compensation of Rs. 23,34,390 and other ancillary reliefs. |
AUTHORITY
|
BENCH4
|
|
507 |
CMP/210423/0007922 |
23/04/2021
|
25/01/2023
|
PRAKASH KUMBHAKAR |
Venkat Estates Private Limited |
VENKAT WINDSOR EAST |
Venkat Estates Private Limited |
Bengaluru Urban |
Refund+ interest+compensatory damages = Sum of total amount demanded and payable to applicant is Rs. 62,48,800 plus interest till the date of realization. |
AUTHORITY
|
BENCH4
|
|
508 |
CMP/221107/0010216 |
07/11/2022
|
25/01/2023
|
NITIN R SHROFF |
Puravankara Limited |
Provident Park Square Phase - 1 |
Puravankara Limited |
Bengaluru Urban |
WOULD LIKE TO EXIT THE PROJECT AND WOULS REQUEST FOR A FULL REFUND OF INSTALLMENTS AND GST PAID UPTO DATE WITH INTEREST UPTO DATE AS BUILDER HAS BREACHED THE AGREEMENT |
AUTHORITY
|
BENCH4
|
|
509 |
CMP/210322/0007816 |
22/03/2021
|
25/01/2023
|
ABHILASH KRISHNAN & HEMADAS |
KRISHNA ENTERPRISES |
KRISHNA MYSTIQ (PHASE-I) |
KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED |
Bengaluru Urban |
Direct respondents to immediately construct amenities, provide electricity connection, provide OC Etc., |
AUTHORITY
|
FULLBENCH
|
|
510 |
CMP/210314/0007786 |
14/03/2021
|
25/01/2023
|
S JAIMURGAN &SHWETHA S G |
KRISHNA ENTERPRISES |
KRISHNA MYSTIQ (PHASE-I) |
KRISHNA ENTERPRISES (HOUSING & INFRASTRUCTURES) INDIA PRIVATE LIMITED |
Bengaluru Urban |
(i) Direct respondents to immediately construct amenities, provide electricity connection, provide OC Etc. and Direct the respondent to pay compensation as per Rera act |
AUTHORITY
|
FULLBENCH
|
|
511 |
CMP/220624/0009681 |
24/06/2022
|
24/01/2023
|
SUDHEER HEGDE |
ARYAN HOMETEC PRIVATE LIMITED |
ARYAN GOLDEN ARENA - C |
ARYAN HOMETEC PVT LTD |
Bengaluru Urban |
RETURN OF AMOUNT WITH INTEREST |
AUTHORITY
|
BENCH6
|
|
512 |
CMP/221010/0010067 |
10/10/2022
|
24/01/2023
|
NAGARAJ BHAVANI |
SHYAMARAJU & CO (INDIA) PRIVATE LIMITED. |
Republic of Whitefield (Phase I) |
Shyamaraju & Co (India) Private Limited |
Bengaluru Urban |
Yes, Refund of advance payment with interest |
AUTHORITY
|
BENCH4
|
|
513 |
CMP/200311/0005589 |
11/03/2020
|
24/01/2023
|
ABHISHEK PATHAK |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity3A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of complaint |
AUTHORITY
|
BENCH5
|
|
514 |
CMP/200918/0006577 |
18/09/2020
|
24/01/2023
|
SHARDUL AND DIVYA SINGH |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the facts of case |
AUTHORITY
|
BENCH5
|
|
515 |
CMP/220314/0009121 |
14/03/2022
|
24/01/2023
|
Mrs Meena Mohapatra |
ALLAM INFINITE INDIA PVT LTD |
GM AMBITIOUS ENCLAVE |
M/s. Allam Infinite India Private Limited |
Bengaluru Urban |
Please help me get my money paid so far refunded from builder |
AUTHORITY
|
BENCH5
|
|
516 |
CMP/UR/211025/0008473 |
25/10/2021
|
24/01/2023
|
1. NARASE GOWDA (2) MANJUNATH NARASE GOWDA |
R KRISHNA |
NISARGA GATEWAY ALSO KNOWN AS CROWN ORCHID LUXURY HOMES |
R KRISHNA |
Bengaluru Urban |
Flat not handed over to us and since it is in gross violation of building approved plan. Builder needs to return of the money invested in the project with applicable compensation. |
AUTHORITY
|
BENCH4
|
|
517 |
CMP/200823/0006122 |
23/08/2020
|
24/01/2023
|
PREETHAM SHETTY |
OCEANUS DWELLINGS (P) LTD |
Oceanus Tranquil |
Oceanus Dwellings (P) Ltd |
Dakshina Kannada |
Refund at the earliest with 12% interest as agreed by the builder. |
AUTHORITY
|
BENCH4
|
|
518 |
CMP/210713/0008117 |
13/07/2021
|
24/01/2023
|
GOPAL B N |
PURAVANKARA LIMITED |
Provident Park Square Phase - 1 |
Puravankara Limited |
Bengaluru Urban |
we need extension to pay the pending amount or refund from the builder |
AUTHORITY
|
FULLBENCH
|
|
519 |
CMP/UR/211214/0008719 |
14/12/2021
|
23/01/2023
|
G V Gopalasamy and Hema Gopalasamy |
M/S WATERFRONT DEVELOPERS, M/S ETERNITY DEVELOPERS PVT.LTD., |
Skyline Waterfront |
Mr. Avinash Prabhu |
Bengaluru Urban |
Refund |
AUTHORITY
|
BENCH4
|
|
520 |
CMP/220711/0009738 |
11/07/2022
|
23/01/2023
|
VAISHALI AJAY THETE & AJAY B THETE |
TRISHUL DEVELOPERS |
MITTAL PALMS |
TRISHUL DEVELOPERS |
Bengaluru Urban |
Refund + Interest + Penalty |
AUTHORITY
|
BENCH4
|
|
521 |
CMP/UR/211214/0008721 |
14/12/2021
|
23/01/2023
|
M/S VBHC VALUE HOMES PRIVATE LIMITED |
ARCHANA GOWDA & KEERTHI GOWDA M |
|
|
Bengaluru Urban |
Direct the Respondents to come forward and cancel Sale Agreement. On failure, Hon'ble Authority be pleased to cancel Sale Agreement by executing Deed of Cancellation |
AUTHORITY
|
BENCH4
|
|
522 |
CMP/221226/0010531 |
26/12/2022
|
21/01/2023
|
Jagadeesan P |
SOBHA LIMITED |
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 |
SOBHA LIMITED |
Bengaluru Urban |
Request for refund of remaining token amount of Rs.50,000/- immediately |
AUTHORITY
|
BENCH4
|
|
523 |
CMP/220201/0008891 |
01/02/2022
|
20/01/2023
|
Ajay Kumar |
SHRIPROP DEVELOPERS PVT LTD |
SHRIRAM LIBERTY SQUARE |
Shriprop Developers Private Limited |
Bengaluru Urban |
Builders must pay pre EMI interest till possession of house. Rs 10 lakhs relief in the change on agreement paper. |
AUTHORITY
|
BENCH5
|
|
524 |
CMP/200804/0006297 |
04/08/2020
|
20/01/2023
|
Fahmida Natankar Anwar |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
525 |
CMP/210730/0008173 |
30/07/2021
|
20/01/2023
|
MALAVIKA NAIR |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
To direct the Respondent to cancel the Sale Agreement and Construction Agreement and refund the consideration paid along with the compensation and pass such orders as this Tribunal may deem fit. |
AUTHORITY
|
BENCH5
|
|
526 |
CMP/UR/220603/0009576 |
03/06/2022
|
20/01/2023
|
Nagaraju c |
Vsan infrastructure pvt ltd |
Sancity disha |
Vsan infrastructure pvt ltd |
Bengaluru Urban |
We want buyback amount ie double of investment plus interest of the amount investment |
AUTHORITY
|
BENCH5
|
|
527 |
CMP/200201/0005326 |
01/02/2020
|
20/01/2023
|
Mrs Teresa Regina Kumari |
Puravankara Limited |
PURVA PALMBEACH |
Puravankara Limited |
Bengaluru Urban |
REQUESTED TO KINDLY INTERVENE AND ADVISE PROMOTER TO MAKE THE REFUND OF BALANCE AMOUN T IMMEDIATELY |
AUTHORITY
|
BENCH4
|
|
528 |
CMP/220520/0009488 |
20/05/2022
|
19/01/2023
|
Abhishek |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 1 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
1. Resolve the issues 2. Remove unfair interest amount. 3. Allot Car Parking. 4. Monthly Delay Compensation For Bank Interest since July 2020. |
AUTHORITY
|
BENCH6
|
|
529 |
CMP/211111/0008541 |
11/11/2021
|
18/01/2023
|
SATYARTHA SRIVASTAVA |
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
alpine vistula |
Alpine Housing Development Corporation Limited |
Bengaluru Urban |
Need to ensure that the buyers are compensated as per rera act and the agreement between buyer and seller |
AUTHORITY
|
BENCH4
|
|
530 |
CMP/UR/201119/0007094 |
19/11/2020
|
18/01/2023
|
RIZWANA BEGUM |
IMTIYAZ AHMED |
JB Reality Solutions Pvt Ltd |
Imtiyaz Ahmed |
Bengaluru Urban |
Please help me in getting my money 980000/- refunded along with compensation |
AUTHORITY
|
BENCH4
|
|
531 |
CMP/220914/0010013 |
14/09/2022
|
18/01/2023
|
AKSHANSH DWIVEDI |
BRIGADE TETRARCH PRIVATE LIMITED |
Emerald & Luminaire Block at Brigade El Dorado |
Brigade Tetrarch Private Limited |
Bengaluru Urban |
Since I have financial crisis at the moment looking forward to RERA to make them refund my amount as promised according to violation of RERA guidelines |
AUTHORITY
|
BENCH4
|
|
532 |
CMP/UR/190623/0003346 |
23/06/2019
|
18/01/2023
|
SHIVAKUMAR |
MR. HARISH RAJU, AXIS CONCEPT CONSTRUCTIONS PVT LTD |
AXIS VEDAM |
Mr. Harish Raju, Axis Concept constructions Pvt Ltd |
Bengaluru Urban |
Handing over of the partment APt.No.103 AXIS VEDAM |
AUTHORITY
|
BENCH4
|
|
533 |
CMP/220915/0010022 |
15/09/2022
|
18/01/2023
|
SHUBHAM DAS |
BRIGADE TETRARCH PRIVATE LIMITED |
Krypton at Brigade Eldorado |
Brigade Tetrarch Private Limited |
Bengaluru Urban |
Help in refund of token amount paid to builder. |
AUTHORITY
|
BENCH4
|
|
534 |
CMP/200815/0006318 |
15/08/2020
|
18/01/2023
|
Sachidanand Joshi |
MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
535 |
CMP/200717/0006176 |
17/07/2020
|
18/01/2023
|
Manish Prabhat Tigga |
MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
536 |
CMP/201011/0006817 |
11/10/2020
|
18/01/2023
|
Krishna Hegde |
MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Please help me to get my House or Return my money with 18% PA interest till now. |
AUTHORITY
|
BENCH5
|
|
537 |
CMP/200907/0006524 |
07/09/2020
|
18/01/2023
|
Sudhindra R |
MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Complaint |
AUTHORITY
|
BENCH5
|
|
538 |
CMP/200703/0006076 |
03/07/2020
|
18/01/2023
|
Sameer Gupta |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
539 |
CMP/200908/0006315 |
08/09/2020
|
18/01/2023
|
SMARAN THOMAS |
MANTRI TECHNOLOGY CONSTELLATIONS |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
540 |
CMP/200624/0006069 |
24/06/2020
|
17/01/2023
|
TANMAYA KUMAR NANDA |
M/S SIPANI PROPERTIES PVT LTD |
SIPANI ROYAL HERITAGE PHASE-II |
SIPANI PROPERTIES PVT LTD |
Bengaluru Urban |
Builder committed as no pre-emi till possession when we booked the flat and I paid additional charge for this scheme but now Builder refusing to refund the pre-emi amount after March 2020 |
AUTHORITY
|
BENCH4
|
|
541 |
CMP/UR/220114/0008795 |
14/01/2022
|
16/01/2023
|
PRASANNA KUMARI |
M/S DREAMZ INFRA INDIA LTD & DISHA CHOWDHARY |
Dreamz Safal |
Dreamz Infra India Ltd |
Bengaluru Urban |
3. The complainant is entitled for refund of amount of Rs.13,16,190/- along with interest and compensation as per RERA Act. |
AUTHORITY
|
BENCH4
|
|
542 |
CMP/201121/0007101 |
21/11/2020
|
16/01/2023
|
LAKSHMI SHARMA KOCH |
FORTUNE DEVELOPERS |
Landmark Dreamz |
Fortune Developers |
Bengaluru Urban |
Request for immediate possession with compensation or full payment refund with compensation |
AUTHORITY
|
BENCH4
|
|
543 |
CMP/UR/201211/0007239 |
11/12/2020
|
16/01/2023
|
APARTMENT BUYERS CONSUMERS ASSOCIATION |
M/S DREAMZ INFRA INDIA LIMITED & Ms. DISHA CHOUDHARY |
"DREAMZ SAMHITHA" |
Ms. DISHA CHOUDHARY |
Bengaluru Urban |
PERMIT THE APARTMENT BUYERS ASSOCIATION TO COMPLETE THE PROJECT AND OTHER CONSEQUENTIAL RELIEFS. |
AUTHORITY
|
BENCH4
|
|
544 |
CMP/UR/210303/0007743 |
03/03/2021
|
16/01/2023
|
Achala |
Niranjan Jain & Manjunath CK |
SS Everjoy Maharaja |
Niranjan Jain |
Bengaluru Urban |
Please help us get this project completed with all civic amenities promised which is pending since 5 years and the project is stalled for many months/years now |
AUTHORITY
|
BENCH4
|
|
545 |
CMP/210413/0007887 |
13/04/2021
|
16/01/2023
|
MAYANK KESARWANI & SHWETA KESARWANI |
PIONIER GARDENIAA PHASE II |
SILVERLANE |
PIONIER GARDENIAA PHASE II |
Bengaluru Urban |
Support to get back booking amount |
AUTHORITY
|
BENCH4
|
|
546 |
CMP/221107/0010209 |
07/11/2022
|
16/01/2023
|
PANKAJ SINGH |
SNR SQUARE PVT. LTD., |
SNR Verity |
SNR Square Pvt Ltd |
Bengaluru Urban |
Please ask builder to do the proper and complete waterproofing for my flat. |
AUTHORITY
|
BENCH4
|
|
547 |
CMP/221102/0010160 |
02/11/2022
|
16/01/2023
|
ANOOB P T |
APEX REALTY VENTURES LLP |
PRESTIGE FINSBURY PARK - HYDE |
APEX REALTY VENTURES LLP |
Bengaluru Urban |
Refund, Interest on the delay |
AUTHORITY
|
BENCH4
|
|
548 |
CMP/200922/0006639 |
22/09/2020
|
16/01/2023
|
ADISHESHA R C |
PRESTIGE ESTATES PROJECTS LTD., |
Prestige Royale Gardens Phase-I |
Prestige Estates Projects Ltd., |
Bengaluru Urban |
interest= Rs 10,42,769; loss of rent= Rs 6,36,500; legal fees= Rs 50,000 ; mental stress= Rs 50,000. total relief claimed= Rs 17,79,269 |
AUTHORITY
|
BENCH4
|
|
549 |
CMP/220307/0009082 |
07/03/2022
|
16/01/2023
|
Arati Behera |
AZEEM INFINITE DWELLING (INDIA) PVT LTD |
GM ELEGANCE TOWER-1 (E-12) |
M/s. AZEEM INFINITE DWELLING (INDIA) PVT LTD |
Bengaluru Urban |
Please help me to get my refund and recover the bank loan partial disbursement. |
AUTHORITY
|
BENCH5
|
|
550 |
CMP/220516/0009463 |
16/05/2022
|
16/01/2023
|
MS. ANIBHA & MR. NEERAJ |
M/S ALLAM INFINITE(INDIA)PVT LTD |
GM NORTH ENCLAVE |
M/s. Allam Infinite India Private Limited |
Bengaluru Urban |
Refund with interest |
AUTHORITY
|
BENCH5
|
|
551 |
CMP/211126/0008648 |
26/11/2021
|
16/01/2023
|
Baskaran Kailasam |
MANTRI DEVELOPERS PVT LTD |
Mantri Webcity2B |
Mantri Developers Private Limited |
Bengaluru Urban |
Regarding Cancellation Refund of Outstanding Amount with Interest for the Unit M603 |
AUTHORITY
|
BENCH5
|
|
552 |
CMP/220902/0009969 |
02/09/2022
|
12/01/2023
|
RINKU SADHU |
ALLAM INFINITE INDIA PVT LTD |
GM NORTH ENCLAVE |
M/s. Allam Infinite India Private Limited |
Bengaluru Urban |
Request for Refund along with interest from the date of receipt. |
AUTHORITY
|
BENCH5
|
|
553 |
CMP/UR/220321/0009227 |
21/03/2022
|
12/01/2023
|
SHRINIVAS AMBEKAR |
PRUTHVI BUILDERS AND DEVELOPERS |
Pruthvi Builders And Developers Tadasinkoppa Layout Phase 3 |
Pruthvi Builders And Developers |
Dharwad |
Pruthvi Builders and Developers Vidyanagar Hubli not responding and no refund initiated |
AUTHORITY
|
BENCH4
|
|
554 |
CMP/210215/0007638 |
15/02/2021
|
12/01/2023
|
KRISHNA CHAITANYA ANNE & SAI DURGA |
SNR SQUARE PVT LTD |
SNR Verity |
SNR Square Pvt Ltd |
Bengaluru Urban |
1. Interest for delay in possession. 2. Sqft dispute amount if any discrepancy. 3. 25000 rupees for electrical and wood damages. 4. 100000 rupees for the mental agony. |
AUTHORITY
|
BENCH4
|
|
555 |
CMP/210917/0008346 |
17/09/2021
|
12/01/2023
|
LAXMAN BANDI |
M/S SRISHIGRA BUILDERS DEVELOPERS |
SHIGRA PALMS |
M/S SRISHIGRA BUILDERS DEVELOPERS |
Bengaluru Urban |
WE NEED REFUND OF OUR HARD EARNED MONEY THROUGH OUT OF LIFE |
AUTHORITY
|
BENCH4
|
|
556 |
CMP/UR/220310/0009110 |
10/03/2022
|
12/01/2023
|
S LAKSHMANAN |
DIRECTOR AND CEO, LICHFL CARE HOMES LTD |
|
|
Bengaluru Urban |
Kindly direct the respondent to remove Association as service provider and appoint a rergistered service provider as per Govrnment of India guidelines |
AUTHORITY
|
BENCH4
|
|
557 |
CMP/211113/0008553 |
13/11/2021
|
12/01/2023
|
JAYAKRISHNA MENON |
NAM ESTATES PRIVATE LIMITED |
Embassy Springs - Phase 1, Plotted Development |
NAM Estates Private Limited |
Bengaluru Urban |
Intervention with the builder to refund with interest compensation. |
AUTHORITY
|
BENCH4
|
|
558 |
CMP/210214/0007635 |
14/02/2021
|
12/01/2023
|
DHEERAJ B C |
UTOCORP |
Aayodhya |
UTOCORP |
Bengaluru Urban |
I Request RERA to help me to get the refund from the builder as soon as possible |
AUTHORITY
|
BENCH4
|
|
559 |
CMP/170816/0968909 |
16/08/2017
|
12/01/2023
|
PRADEEP KUMAR K M |
KARNATAKA TELECOM DEPARTMENT EMPLOYEES COOPERATIVE SOCIETY LIMITED |
NOT FOUND |
NOT FOUND |
Tumakuru |
Refund with interest and compensation as per law |
AUTHORITY
|
BENCH4
|
|
560 |
CMP/UR/210316/0007791 |
16/03/2021
|
12/01/2023
|
NICKIL SRIVATSAN |
HOUSE JOY (SARVALOKA SERVICES) |
G plus 2 |
House Joy (Sarvaloka Services) |
Bengaluru Urban |
Require help from RERA to get a refund for my project |
AUTHORITY
|
BENCH4
|
|
561 |
CMP/UR/210730/0008175 |
30/07/2021
|
11/01/2023
|
NEERAJA GADDAM |
A. PRAVEEN S/O VENKATASWAMY, MANOJ KUMAR BAHETI, MURALI NARAYAN RATHI, A. VENKATESH REDDY & MRS. ANITHA, SRI TIRUMALA CONSTRUCTION COMPANY |
SRI TIRUMALA SYMPHONY |
SRI TIRUMALA CONSTRUCTION COMPANY |
Bengaluru Urban |
EXECUTION OF SALE DEED FOR FLAT NO. 117 IN SRI TIRUMALA SYMPHONY WITH POSSESSION OR ANY OTHER FLAT & COMPENSATION FOR DELAY IN DELIVERY |
AUTHORITY
|
BENCH6
|
|
562 |
CMP/UR/201122/0007109 |
22/11/2020
|
11/01/2023
|
Gaibu Husain Gadwale |
ABDEALI F MAGAR |
Raj Manzil |
Abdeali F Magar |
Dharwad |
I have discussed my concerns with builder many at times but he always says that he will fix this issues but never really kept his words. My last hope is from RERA to intervene and help me |
AUTHORITY
|
BENCH6
|
|
563 |
CMP/200912/0006562 |
12/09/2020
|
11/01/2023
|
PRASENJIT GHOSH |
MANYATA INDUSTRIAL PARKS LLP |
Godrej 24 |
Manyata Industrial Parks LLP., |
Bengaluru Urban |
Refund of remaining 2.2 lakhs that Godrej has deducted because I cancelled the unit due to medical emergency |
AUTHORITY
|
BENCH6
|
|
564 |
CMP/UR/200611/0006020 |
11/06/2020
|
11/01/2023
|
Sathyavathi |
DR. MANDEEP KAUR |
TGS Saraswathi |
Dr.Mandeep kaur |
Bengaluru Urban |
Kindly get back my money refund |
AUTHORITY
|
BENCH6
|
|
565 |
CMP/200802/0006288 |
02/08/2020
|
11/01/2023
|
Manoj Vallikkat |
SOBHA LTD |
|
|
Bengaluru Urban |
Arrange for the refund of Rs 6.5 Lakhs from Sobha at the earliest. |
AUTHORITY
|
BENCH6
|
|
566 |
CMP/UR/200713/0006164 |
13/07/2020
|
11/01/2023
|
Umesh Muniswamy |
TR BUILDERS & DEVELOPERS |
ANAND ENCLAVE |
1) TR builders & developers 2) Sri Vijay Anand Kumar 3) Smt Karpagam Anand Kumar |
Bengaluru Urban |
Direct the Respondents to get the Project registered under RERA and impose penalty of 10% of project cost as per S.59 |
AUTHORITY
|
BENCH6
|
|
567 |
CMP/220623/0009671 |
23/06/2022
|
11/01/2023
|
AYYANAR.A |
SATTVA DEVELOPERS PVT LTD |
SALARPURIA-SATTVA OPUS |
SATTVA DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Request RERA to arrange the compensation in terms of the delay from April 2022 by way of giving us the Rent of our flat until the submission of OC and possession of flat by us. |
AUTHORITY
|
BENCH5
|
|
568 |
CMP/201209/0007141 |
09/12/2020
|
10/01/2023
|
Mohammed Ziyad Urala kkal |
SJR Prime Corporation Private Limited |
Blue Waters' by SJR Prime Corporation |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
569 |
CMP/UR/201128/0007144 |
28/11/2020
|
10/01/2023
|
Arpita Ghosh |
SJR Prime Corporation Private Limited |
'Blue Waters' by SJR Prime Corporation |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
570 |
CMP/UR/201130/0007156 |
30/11/2020
|
10/01/2023
|
Shilpi Bandil & Amit Bandil |
SJR Prime Corporation Private Limited |
'Blue Waters' by SJR Prime Corporation |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
571 |
CMP/UR/201214/0007228 |
14/12/2020
|
10/01/2023
|
Mr Saikat Sarkar & Mrs. Somani Sarkar |
SJR Prime Corporation Private Limited |
Blue Waters By SJR Prime Corp |
M/s SJR Prime Corporation Pvt Ltd |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
572 |
CMP/201227/0007270 |
27/12/2020
|
10/01/2023
|
NISHA GUPTA& ROHIT GUPTA |
SJR Prime Corporation Private Limited |
Blue Waters by SJR Prime Corporation Pvt Ltd |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
573 |
CMP/210630/0008070 |
30/06/2021
|
10/01/2023
|
Himanshu Dadhore |
SJR Prime Corporation Private Limited |
SJR PRIMECORPOATION PVT LTD BLUE WATER PH2 |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
574 |
CMP/210707/0008105 |
07/07/2021
|
10/01/2023
|
Pravin Kumar Gohite |
SJR Prime Corporation Private Limited |
Blue Waters Phase 1 |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
575 |
CMP/211111/0008538 |
11/11/2021
|
10/01/2023
|
Akash Kumar Saxena & Archana Rao. |
SJR Prime Corporation Private Limited |
SJR Prime Corporation Pvt Ltd Blue Water PH 3 |
SJR Prime Corporation Private Limited |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH4
|
|
576 |
CMP/220420/0009372 |
20/04/2022
|
10/01/2023
|
SHRI ANAND KUMAR KSHATRIYA |
MYSORE PROJECTS PRIVATE LIMITED |
Eden at Brigade Cornerstone Utopia |
Mysore Projects Private Limited |
Bengaluru Urban |
GETTING CORRECT PAYMENT RECEIPTS FROM THE BUILDER. REMOVAL OF UNJUST PENALTY ON ME BY THE BUILDER. COMPENSATION FOR HARASSMENT FROM THE BUILDER. |
AUTHORITY
|
BENCH4
|
|
577 |
CMP/201126/0007128 |
26/11/2020
|
10/01/2023
|
MANPREET SINGH & AMRIT KAUR MANN |
SHYAMARAJU & CO (INDIA) PRIVATE LIMITED |
Republic of Whitefield (Phase I) |
Shyamaraju & Co (India) Private Limited |
Bengaluru Urban |
Direction to execute the sale deed and to pay the compensation as agreed |
AUTHORITY
|
BENCH4
|
|
578 |
CMP/200814/0006357 |
14/08/2020
|
09/01/2023
|
Asha Lobo |
KOLTE PATIL DEVELOPERS LTD |
RAAGA |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Delay compensation as per RERA |
AUTHORITY
|
BENCH4
|
|
579 |
CMP/220328/0009270 |
28/03/2022
|
09/01/2023
|
Avinash Kumar |
KOLTE PATIL DEVELOPERS LTD |
RAAGA |
KOLTE PATIL DEVELOPERS LTD |
Bengaluru Urban |
Compensation towards delay with ongoing market Rent of 20,000PM from March2016 - April 2021, Interest on delayed compensation and on Amount paid to builder at 18% per annum for same time period. |
AUTHORITY
|
BENCH4
|
|
580 |
CMP/UR/220725/0009794 |
25/07/2022
|
09/01/2023
|
Nagaraju c |
V San infrastructure pvt ltd |
San city Kaveri 2nd phase M block |
V San infrastructure pvt ltd |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
581 |
CMP/220726/0009812 |
26/07/2022
|
09/01/2023
|
Suma S C |
VSan Infrastructure Pvt Ltd |
Kaveri |
VSan Infrastructure Pvt Ltd |
Bengaluru Urban |
Need compensation with interest and to direction the respondent to allot the site. |
AUTHORITY
|
BENCH4
|
|
582 |
CMP/UR/211028/0008479 |
28/10/2021
|
09/01/2023
|
CHANDRA SHEKAR KUMAR |
RAMANA REDDY K |
KSR Cordelia at Dasarahalli Village, Krishnarajapuram Hobli, Bangalore North Taluk, Bangalore |
KSR PROPERTIES PVT LIMITED |
Bengaluru Urban |
Legal Registration for the Purchased property. |
AUTHORITY
|
FULLBENCH
|
|
583 |
CMP/UR/220308/0009088 |
08/03/2022
|
09/01/2023
|
GOVARAM CHOUDHARY |
ARYAN HOMETEC PVT LTD |
ARYAN FOUNTAIN SQUARE:::PRM/KA/RERA/1251/310/PR/171031/001515 |
ARYAN HOMETEC PVT LTD |
Bengaluru Urban |
CANCELLATION OF FLAT, RELEASE FROM HOME LOAN AND ALSO REFUND OFALL THE LOSSES AND DEPOSIT AMOUNT WITH INTEREST |
AUTHORITY
|
BENCH6
|
|
584 |
CMP/220408/0009332 |
08/04/2022
|
09/01/2023
|
BHASKAR BAKTHAVATSALU |
MANTRI DEVELOPERS PVT LTD |
Mantri Centrium |
Mantri Developers Private Limited |
Bengaluru Urban |
To direct the Respondent to cancel the Agreement of Sale, Construction Agreement both dated 23.08.2016 in respect of the Schedule Property and to refund a sum of Rs. 1,08,47,226/- and other reliefs |
AUTHORITY
|
BENCH6
|
|
585 |
CMP/210717/0008135 |
17/07/2021
|
06/01/2023
|
Monali Ramakant Gaikwad |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Refund of entire amount received by builder with interest as per RERA & clear bank loan amount taken in the name of complainants |
AUTHORITY
|
BENCH6
|
|
586 |
CMP/220902/0009971 |
02/09/2022
|
06/01/2023
|
Sandeep TS |
OZONE REALTORS PRIVATE LIMITED |
Ozone Polestar |
Ozone Realtors Private Limited |
Bengaluru Urban |
Refund of Principal with interest; Bank loan closure by builder; Refund of all EMIs paid to Bank from the loan start date; Compensation for delay |
AUTHORITY
|
BENCH6
|
|
587 |
CMP/220714/0009752 |
14/07/2022
|
06/01/2023
|
TOVINAKERE DWARAKANATH VIVEK |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
I seek complete Refund of the amount paid along along with interesting closure of the loan |
AUTHORITY
|
BENCH6
|
|
588 |
CMP/220215/0009005 |
15/02/2022
|
06/01/2023
|
KISHOR KUMAR |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1. Raja Housing ltd should pay me the compensation for delay starting from 1 Nov 2021 till project completion. 2. Request to RERA : Donot provide further extension of completion date to this project. |
AUTHORITY
|
BENCH6
|
|
589 |
CMP/211111/0008539 |
11/11/2021
|
04/01/2023
|
H S Vivekananda |
Total Environment Building Systems Pvt Ltd |
The Magic Faraway Tree Phase 2 |
Total Environment Building Systems Pvt Ltd |
Bengaluru Urban |
Refund of the booking amount |
AUTHORITY
|
BENCH4
|
|
590 |
CMP/UR/220613/0009613 |
13/06/2022
|
03/01/2023
|
Binoy P Babu |
M/s Infrany Ventures |
Infrany Trinity |
Infrany Ventures |
Bengaluru Urban |
Direct the Respondent to refund the sum of Rs. 21,01,795/- (Rupees Twenty-One Lakhs One Thousand Seven Hundred and Ninety-Five Only) along with interest at 10.75% |
AUTHORITY
|
BENCH4
|
|
591 |
CMP/200103/0005112 |
03/01/2020
|
03/01/2023
|
Ajit Krishnamohan and Debjani Roy |
INFRANY VENTURE |
INFRANY TRINITY |
INFRANY VENTURES |
Bengaluru Urban |
Refund with Compensation |
AUTHORITY
|
BENCH4
|
|
592 |
CMP/200213/0005428 |
13/02/2020
|
03/01/2023
|
Supriya Rajgopal |
INFRANY VENTURES |
INFRANY TRINITY |
INFRANY VENTURES |
Bengaluru Urban |
Refund with Compensation |
AUTHORITY
|
BENCH4
|
|
593 |
CMP/200227/0005563 |
27/02/2020
|
03/01/2023
|
Mr Ritesh Arora |
INFRANY VENTURES |
INFRANY TRINITY |
INFRANY VENTURES |
Bengaluru Urban |
Refund with Compensation |
AUTHORITY
|
BENCH4
|
|
594 |
CMP/201230/0007363 |
30/12/2020
|
02/01/2023
|
VBHC Mumbai Value Homes Private Limited |
Ms. R N Chandrakala D/o. Late R. Nagalingachari, |
|
|
Bengaluru Urban |
Payment of Amounts with interest failing which forfeiture of amount paid with penalty and cancellation of agreement for sale |
AUTHORITY
|
BENCH4
|
|
595 |
CMP/UR/201030/0006985 |
30/10/2020
|
02/01/2023
|
T M Muddappa |
MAXWORTH REALTY INDIA LIMITED |
Max Meadows Phase III |
Maxworth Realty India Limited |
Bengaluru Urban |
I pray that this Hon’ble forum direct the Promoter to refund the Booking Amount along with the applicable interest. |
AUTHORITY
|
BENCH6
|
|
596 |
CMP/UR/201030/0006986 |
30/10/2020
|
02/01/2023
|
T M Muddappa |
MAXWORTH REALTY INDIA LIMITED |
Max Meadows Phase III |
Maxworth Realty India Limited |
Bengaluru Urban |
I pray that this Hon’ble forum direct the Promoter to refund the Booking Amount along with the applicable interest. |
AUTHORITY
|
BENCH6
|
|
597 |
CMP/180107/0000380 |
07/01/2018
|
02/01/2023
|
M V NAGARAJA |
MAXWORTH REALTY INDIA LTD |
MAXWORTH REALTY INDIALIMITED,Max Worth Realty India Ltd. Orchids III |
keshav |
Bengaluru Urban |
Pray for refund of money with interest and costs. |
AUTHORITY
|
BENCH6
|
|
598 |
CMP/UR/200615/0005947 |
15/06/2020
|
02/01/2023
|
Smitha M Nadig |
MANTRI DEVELOPERS PRIVATE LIMITED, SUSHIL PANDRANG MANTRI |
Mantri webcity |
Mantri Developers Private Limited |
Bengaluru Urban |
Refund and Compensation |
AUTHORITY
|
BENCH6
|
|
599 |
CMP/210212/0007627 |
12/02/2021
|
31/12/2022
|
PURNENDU HAZRA |
PEARL COMMUNITY ONE DEVELOPERS PVT LTD |
PALM VISTAS |
PEARL COMMUNITY ONE DEVELOPERS PVT LTD |
Bengaluru Urban |
Refund of Rs. 80,00,000.00 with 18% interest for delay alongwith compensation of Rs.30,00,000/- |
AUTHORITY
|
BENCH4
|
|
600 |
CMP/UR/211124/0008628 |
24/11/2021
|
31/12/2022
|
J.L SHARMA |
JOJI THOMAS, RKM LAYOUT PHASE 1 |
RKM Layout phase 1 |
Joji Thomas |
Bengaluru Urban |
Recovery of claim amount of Rs. 6138225 as mentioned under your head facts and complaints. |
AUTHORITY
|
BENCH4
|
|
601 |
CMP/171031/0000175 |
31/10/2017
|
31/12/2022
|
SARITA KAMATH |
SAGRI BUILDERS AND DEVELOPERS LIMITED, MR. PRASANNA KALKURA, MRS. SUREKHA KALKURA |
NOT FOUND |
NOT FOUND |
Udupi |
Refund of amount paid with interest @ 18% p.a. |
AUTHORITY
|
BENCH4
|
|
602 |
CMP/UR/220430/0009408 |
30/04/2022
|
31/12/2022
|
AKBAR SHARIFF |
BLUE VALLEY PROPERTIES Pvt. Ltd. |
blue valley smilee view |
BLUE VALLEY PROPERTIES Pvt. Ltd. |
Bengaluru Urban |
LAYOUT DEVELOPMENT WITH COMPENSATION DUE TO DELAY IN COMPLETION,/ REFUND FULL MONEY WITH 9 YEARS INTEREST ALONG WITH COMPENSATION. |
AUTHORITY
|
BENCH4
|
|
603 |
CMP/220630/0009707 |
30/06/2022
|
30/12/2022
|
DR HARISH RAWAT |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
FULL CANCELLATION REFUND WITH INTEREST |
AUTHORITY
|
BENCH6
|
|
604 |
CMP/220426/0009388 |
26/04/2022
|
30/12/2022
|
Tanmay Dayma |
SHRIPROP DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTD |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
We anticipate that RERA will step in and provide compensation from the builder. |
AUTHORITY
|
BENCH6
|
|
605 |
CMP/220518/0009480 |
18/05/2022
|
30/12/2022
|
SANTOSH SUBBARAO |
SHRIPROPR DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTD |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Request to provide the delay compensation by the builder (SHRIRAM PROPERTIES) |
AUTHORITY
|
BENCH6
|
|
606 |
CMP/210811/0008234 |
11/08/2021
|
30/12/2022
|
SAURABH KUMAR AGARWAL |
s s developers |
Salarpuria Sattva Serene Life |
S S DEVELOPERS |
Bengaluru Urban |
Refund the entire sum and pay 10% interest from 20th March 2020. Compensate for the loss of TDS Rs 19044 /- paid by me. Prosecute developer for violations. Compensation for suffering harassment. |
AUTHORITY
|
BENCH5
|
|
607 |
CMP/200130/0004909 |
30/01/2020
|
29/12/2022
|
D S RUDRAMUNI |
M/S SHIVPARVATHI CONSTRUCTIONS |
THE ORCHARD |
Shivparvati Constructions |
Bengaluru Urban |
COMPENSATION OF INTEREST TOWARDS PURCHASE OF FLAT LOAN RAISED FROM BANK |
AUTHORITY
|
FULLBENCH
|
|
608 |
CMP/UR/211202/0008667 |
02/12/2021
|
29/12/2022
|
YOGANANDAN JAGANNATHAN |
SMART VALUE HOMES PVT.LTD. |
NEW HAVEN BENGALURU PHASE I |
SMART VALUE HOMES (PEENYA PROJECT) PRIVATE LIMITED |
Bengaluru Urban |
1. Refund of Rs.46,73,428/-- 2. Pay interest At 18% p.a. from 25.02.2017 to until date of payment on Rs.46,73,428/-- 3. Compensation for legal expenses |
AUTHORITY
|
FULLBENCH
|
|
609 |
CMP/200707/0006125 |
07/07/2020
|
29/12/2022
|
SUBHAYAN SAHA |
M/S SHRIVISION TOWERS PVT.LTD. |
SHRIRAM GREEN FIELD PHASE 1 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Fix all the cracks & compensate for damage |
AUTHORITY
|
FULLBENCH
|
|
610 |
CMP/221128/0010407 |
28/11/2022
|
28/12/2022
|
Kumar Maruti Priyadarshi |
Sobha Limited |
Sobha Dream Gardens Phase 1 ? Wing 8 and 9 |
Sobha Limited |
Bengaluru Urban |
As promised by the builder at the time of sale, please help me to get shopping vouchers worth Rs.62,500. |
AUTHORITY
|
BENCH4
|
|
611 |
CMP/UR/201028/0006963 |
28/10/2020
|
27/12/2022
|
ANOOP KUMAR |
MONISHA ALUVILA,PROVIDENT SKYWORTH |
Provident Skyworth |
Purvankara |
Bengaluru Urban |
Refund of full amount paid till date along with interest |
AUTHORITY
|
BENCH4
|
|
612 |
CMP/210324/0007830 |
24/03/2021
|
27/12/2022
|
VINOD VIJAYAN |
R PRATAP KUMAR REDDY, SAMHITA ELITE |
Samhita Elite |
R PRATAP KUMAR REDDY |
Bengaluru Urban |
Builder needs to waterproof all the external walls and compensate for the damage caused due to water seepage and cracks in the internal walls. |
AUTHORITY
|
BENCH4
|
|
613 |
CMP/210907/0008310 |
07/09/2021
|
27/12/2022
|
MADHUSUDHAN GATTAMANENI |
GODREJ PROJECTS NORTH STAR LLP |
Godrej Royale Woods |
Godrej Projects North Star LLP |
Bengaluru Urban |
Need full refund or move me to Project Godrej Ananda |
AUTHORITY
|
BENCH4
|
|
614 |
CMP/220725/0009805 |
25/07/2022
|
27/12/2022
|
RAHUL RANJAN SINHA |
SNN HOMES LLP |
SNN Raj Greenbay |
SNN Homes LLP |
Bengaluru Urban |
My humble request is Pre handover maintenance Charge of INR 43363 shall be reduced from my net dues calculation |
AUTHORITY
|
BENCH4
|
|
615 |
CMP/201125/0007059 |
25/11/2020
|
27/12/2022
|
BALAPPA RAMAPPA MALED |
AKSHAYA BUILDERS AND DEVELOPERS |
AKSHAYA REGALIA |
AKSHAYA BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Support from RERA to fix the said problems in complaint copy and recover the out of pocket expenses for correcting the flat problems. |
AUTHORITY
|
BENCH4
|
|
616 |
CMP/211022/0008463 |
22/10/2021
|
27/12/2022
|
Sunanda Hosur |
Sanchaya Land And Estate Private Limited |
skyview |
Sanchaya Land And Estate Private Limited |
Bengaluru Urban |
Compensation for delay in delivery |
AUTHORITY
|
BENCH4
|
|
617 |
CMP/220120/0008838 |
20/01/2022
|
27/12/2022
|
C Balakrishnan |
SJR PRIMECORPORATION PVT LTD |
SJR PRIMECORPORATION PVT LTD PALAZZA PH3 |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
Builder to pay delay compensation & rectify all quality issues including repainting of the affected area |
AUTHORITY
|
BENCH4
|
|
618 |
CMP/UR/220308/0009087 |
08/03/2022
|
27/12/2022
|
Soumyajit Bir |
Provident Housing Ltd |
Neora Phase -1 Project, #TooGoodHomes, Bangalore |
Provident Housing Ltd |
Bengaluru Urban |
Seeking Refund of the Advance amount paid to the Respondent with interest |
AUTHORITY
|
BENCH4
|
|
619 |
CMP/190520/0003069 |
20/05/2019
|
27/12/2022
|
Ashok Kumar Pati |
PRESTIGE ESTATES PROJECTS LIMITED |
PRESTIGE ROYALE GARDENS PHASE 2 |
PRESTIGE ESTATES PROJECTS LIMITED |
Bengaluru Urban |
Refund sums paid with interest. Pay bank interest. |
AUTHORITY
|
FULLBENCH
|
|
620 |
CMP/210827/0008276 |
27/08/2021
|
27/12/2022
|
B M PRESTINE RESIDENTS WELFARE ASSOCIATION |
B M DEVELOPERS |
BM PRISTINE |
B M DEVELOPERS |
Bengaluru Urban |
Direction for amenities, individual electricity connection, compensation, legal fees, etc. |
AUTHORITY
|
FULLBENCH
|
|
621 |
CMP/210530/0007967 |
30/05/2021
|
27/12/2022
|
RUPESH GODBOLE |
BM DEVELOPERS |
BM PRISTINE |
B M Developers |
Bengaluru Urban |
Completion of Project by Builder within 3 months and Payment of Actual Rent for Past 4 Years paid by me |
AUTHORITY
|
FULLBENCH
|
|
622 |
CMP/UR/211119/0008600 |
19/11/2021
|
26/12/2022
|
PURAVANKARA LIMITED |
SURESH BABU |
|
|
Bengaluru Urban |
Cancellation of the registered Agreement for Sale executed on 27.08.2018 bearing registration number JPN-1-05356-2018-19 for apartment no. B1-1D-704. |
AUTHORITY
|
BENCH4
|
|
623 |
CMP/220321/0009205 |
21/03/2022
|
26/12/2022
|
Srinivasa Rao Jalla |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
SOUTHEND |
Ozone Urbana Infra Developers Pvt.Ltd |
Bengaluru Rural |
Exit from Project, Exercise of Buyback Option, Refund of Booking Amount, Payment of Committed Profit Value, Closure of Loan Account, Payment of Outstanding Dues to Housing Loan Institution |
AUTHORITY
|
BENCH6
|
|
624 |
CMP/220406/0009318 |
06/04/2022
|
26/12/2022
|
Sanat Kumar Chandravanshi |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Rural |
Compensation |
AUTHORITY
|
BENCH6
|
|
625 |
CMP/210709/0008113 |
09/07/2021
|
26/12/2022
|
K N V ANAND KUMAR |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Rural |
DELAY COMPENSATION |
AUTHORITY
|
BENCH6
|
|
626 |
CMP/220412/0009347 |
12/04/2022
|
26/12/2022
|
Srinath K Kutty & MRS. VINITHA V |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Rural |
Monthly compensation from builder for delay in project delivery |
AUTHORITY
|
BENCH6
|
|
627 |
CMP/220126/0008874 |
26/01/2022
|
26/12/2022
|
Shashank Kumar Jha |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Rural |
Compensation for the delay in completing the project |
AUTHORITY
|
BENCH6
|
|
628 |
CMP/220112/0008784 |
12/01/2022
|
26/12/2022
|
MOHAMMAD SHADAB KHAN |
Godrej Properties Limited |
Godrej Aqua |
Godrej Properties Limited |
Bengaluru Urban |
Thereby directing the Respondent to refund of 7, 55, 324.24/- (Rupees Seven Lakhs Fifty Five Thousand Three Hundred and Twenty-Four and Paisa Twenty Four Only) along with Interest @ 18% p.a. |
AUTHORITY
|
FULLBENCH
|
|
629 |
CMP/UR/221207/0010435 |
07/12/2022
|
26/12/2022
|
Narendra Reddy B J |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Excise Layout |
SREE KRISHNA DEVELOPERS & PROMOTERS |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
AUTHORITY
|
BENCH4
|
|
630 |
CMP/UR/221219/0010483 |
19/12/2022
|
26/12/2022
|
Ganesh Reddy S |
Unnathi Group of India INC., |
Excise Layout |
Unnathi Group of India INC., |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
AUTHORITY
|
BENCH4
|
|
631 |
CMP/UR/221217/0010474 |
17/12/2022
|
26/12/2022
|
Muniyamma B |
Unnathi Group of India INC., |
Excise Layout |
Unnathi Group of India INC., |
Bengaluru Urban |
All payments were made in due time as agreed and loses incurred to developer is not because of me, hike should not be applicable to me and my site should be registered at the earliest. |
AUTHORITY
|
BENCH4
|
|
632 |
00114/2023 |
23/01/2023
|
26/12/2022
|
Archana N |
M/S Sree Krishna Developers and Promoters |
Excise Layout |
M/S Sree Krishna Developers and Promoters |
Bengaluru Urban |
100% of the requested amount was made within due time and loses incurred to developer is not because of me, hike should not be applicable and in return I should get interest for 2 years for my money. |
AUTHORITY
|
BENCH4
|
|
633 |
CMP/UR/210809/0008229 |
09/08/2021
|
23/12/2022
|
PREETHAM LAKSHMIKANTHAN |
M/S BCV DEVELOPERS |
Parkside Retirement Homes, Brigade Orchard |
M/s.BCV Developers Private Limited |
Bengaluru Urban |
Number of reliefs including a Declare the Project as an ongoing one and initiate penalty proceedings as stipulated under section 59(1) of RERA Act, 2016. Interim relief is also sought from RERA |
AUTHORITY
|
FULLBENCH
|
|
634 |
CMP/UR/211126/0008645 |
26/11/2021
|
23/12/2022
|
DR S. PRAKASH |
M/S BCV DEVELOPERS PVT. LTD |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd (subsidiary of Brigade group) |
Bengaluru Urban |
Rera registration, OC/CC from competant authority, project completion, registered association formalities, project conveyance, return of sinking fund and restrain cam chgs claims |
AUTHORITY
|
FULLBENCH
|
|
635 |
CMP/UR/211202/0008668 |
02/12/2021
|
23/12/2022
|
SRINIVASA MURTHY NIRMAL PRASAD |
M/S BCV DEVELOPERS PVT LTD. |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd |
Bengaluru Urban |
Rera registration, OC / CC from competant authority, project completion, registered association formation, project conveyance, return of sinking fund and restrain cam charges claims. |
AUTHORITY
|
FULLBENCH
|
|
636 |
CMP/UR/211202/0008665 |
02/12/2021
|
23/12/2022
|
LT COL K R KASTURI RANGAN |
M/S BCV DEVELOPERS PVT LTD. |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd (subsidiary of Brigadegroup) |
Bengaluru Urban |
Rera registration, OC / CC from competant authority, project completion, reqistered association formation, project conveyance, return of sinking fund and restrain CAM charges claims |
AUTHORITY
|
FULLBENCH
|
|
637 |
CMP/UR/211126/0008646 |
26/11/2021
|
23/12/2022
|
Govind Raj Kalmadi |
BCV Developers Pvt Ltd |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd (subsidiary of Brigade group) |
Bengaluru Urban |
Rera registration, OC / CC from competant authority, project completion, registered association formation, project conveyance, return of sinking fund and restrain cam chgs claims |
AUTHORITY
|
FULLBENCH
|
|
638 |
CMP/UR/211202/0008669 |
02/12/2021
|
23/12/2022
|
Meera Iyengar |
BCV Developers Pvt Ltd |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd (subsidiary of Brigadegroup) |
Bengaluru Urban |
Rera registration, OC / CC from competant authority, project completion, registered association formation, project conveyance, return of sinking fund and restrain cam charges claims. |
AUTHORITY
|
FULLBENCH
|
|
639 |
CMP/UR/211126/0008644 |
26/11/2021
|
23/12/2022
|
Shobhalatha V |
BCV Developers Pvt Ltd |
Brigade Parkside Retirement Homes |
BCV Developers Pvt Ltd (subsidiary Brigade Group) |
Bengaluru Urban |
Rera registration, OC/CC from competant authority, project completion, registered association formation, project conveyance, return of sinking fund and restraim cam chargs claims |
AUTHORITY
|
FULLBENCH
|
|
640 |
CMP/220525/0009525 |
25/05/2022
|
23/12/2022
|
KARUNAKARAN JAYACHANDRAN |
Godrej Properties Limited |
Godrej Aqua |
Godrej Properties Limited |
Bengaluru Urban |
Order of refund of the entire amount paid as part sale consideration |
AUTHORITY
|
FULLBENCH
|
|
641 |
CMP/220707/0009725 |
07/07/2022
|
22/12/2022
|
RATHNA H |
Rohan Gruh Nirman LLP |
Rohan Akriti Building 1 |
Rohan Gruh Nirman LLP |
Bengaluru Urban |
Kindly provide car parking nearer to my residence |
AUTHORITY
|
BENCH4
|
|
642 |
CMP/220913/0010007 |
13/09/2022
|
22/12/2022
|
Pankaj Kukkar |
TANMATHRA AQUARELLE DEVELOPERS PRIVATE LIMITED |
SHRIRAM CHIRPING GROVE - 2 |
TANMATHRA AQUARELLE DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Refund of booking amount as cancelled at a very early stage |
AUTHORITY
|
BENCH6
|
|
643 |
CMP/UR/221006/0010051 |
06/10/2022
|
21/12/2022
|
C Sasikala |
HVS CONSTRUCTIONS, HS GOPAL, RISHI KUMAR |
Krishna Legacy Apartments (earlier known as HVS Parkview Apartments) |
HVS Constructions, HS Gopal, Rishi Kumar, |
Bengaluru Urban |
Return of amount and compensation or possession of flat |
AUTHORITY
|
BENCH6
|
|
644 |
CMP/UR/221006/0010052 |
06/10/2022
|
21/12/2022
|
Dr Umesh Rai B |
RISHI KUMAR, HVS CONSTRUCTIONS REPRESENTED BY HS GOPAL |
Krishna Legacy Apartments (earlier known as HVS Parkview Apartments) |
HVS Constructions, HS Gopal, Rishi Kumar |
Bengaluru Urban |
Return of amount and compensation or possession of flat |
AUTHORITY
|
BENCH6
|
|
645 |
CMP/220816/0009897 |
16/08/2022
|
21/12/2022
|
KARTHI J & MRS. GOWRI SANKARI |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Settlement of Delay Compensation till the date of receiving OC / Registration and proper full Handover. |
AUTHORITY
|
BENCH6
|
|
646 |
CMP/UR/221006/0010050 |
06/10/2022
|
21/12/2022
|
Padmanabhan Karishnan |
HVS CONSTRUCTIONS, HS GOPAL, RISHI KUMAR |
Krishna Legacy Apartments (earlier known as HVS Parkview Apartments) |
HVS Constructions, HS Gopal, Rishi Kumar |
Bengaluru Urban |
Return of amount and compensation or possession of flat |
AUTHORITY
|
BENCH6
|
|
647 |
CMP/200208/0005396 |
08/02/2020
|
21/12/2022
|
Rahul Kumar |
ARIES LAKEVIEW NARAYAN ENTERPRISES |
ARIES LAKEVIEW |
NARAYAN ENTERPRISES |
Bengaluru Urban |
Refund of Agreed sum of INR 7,59,050/- (Indian Rupees Seven lakh Fifty Nine thousand Fifty only) along with interest at the rate of 12% per annum w.e.f 28.04.2018 till date of actual payment & penalty |
AUTHORITY
|
BENCH4
|
|
648 |
CMP/201125/0006905 |
25/11/2020
|
21/12/2022
|
Natesh Kumar |
Hoysala Projects Private Limited |
Hoysala Ace-II |
Hoysala Projects Private Limited |
Bengaluru Urban |
Direct the Respondent to pay delay compensation and damages till the date of receipt of Occupancy Certificate. Direct the Respondent to complete the construction at the earliest and form Association. |
AUTHORITY
|
BENCH4
|
|
649 |
CMP/191113/0004703 |
13/11/2019
|
21/12/2022
|
Mrs. Babita Tomar |
Sobha City - Casa Paradiso Block 4 |
Sobha City - Casa Paradiso Block 4 |
Sobha Limited |
Bengaluru Urban |
Withdrawal of Petitioner from the impugned project. To return an amount of Rs 1,13,01,764 along with interest as per Ch V Rule 16 of Karnataka RERA Rules from the date of execution of the Agreement |
AUTHORITY
|
BENCH4
|
|
650 |
CMP/200428/0005818 |
28/04/2020
|
21/12/2022
|
Babu Perumsalsamy Kannuraj |
Emprasa Startup City - Residential |
Emprasa Startup City - Residential |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
As they breached the trust of the customer, I don’t want to continue with the project. I want to get full reimbursement of the money which I paid along with interest. |
AUTHORITY
|
BENCH4
|
|
651 |
CMP/210225/0007695 |
25/02/2021
|
21/12/2022
|
Prakash Sethu |
Relationship Properties Private Limited |
Parkwest - Magnolia - Tower 6 |
Relationship Properties Private Limited |
Bengaluru Urban |
full refund + interest of the monies paid by my towards the apartment |
AUTHORITY
|
BENCH4
|
|
652 |
CMP/201125/0007122 |
25/11/2020
|
21/12/2022
|
RAJESH KUMAR PAREEK AND SHILPA PAREEK |
DeFINER Hi Life |
DeFINER Hi Life |
DeFINER Ventures |
Bengaluru Urban |
Appropriate refund of money towards delays and refund of maintenance |
AUTHORITY
|
BENCH4
|
|
653 |
CMP/220412/0009352 |
12/04/2022
|
20/12/2022
|
Shaik Abdul Raheem |
BHAVISHA PROPERTIES |
Bavisha Gardeniaa |
Bhavisha Properties |
Bengaluru Rural |
The builder has to implement the rules mentioned in the email OR #312 flat has to rebuild as per the floor plan showed in brochure or Refund to flat# 311, including all expenses incurred for the flat |
AUTHORITY
|
BENCH5
|
|
654 |
CMP/190321/0002095 |
21/03/2019
|
20/12/2022
|
Sachidanandagouda Patil |
B Mahesh |
Nandi Enclave |
B Mahesh |
Dharwad |
Compensation Of Rs. 5 Lakhs Each Flat. |
AUTHORITY
|
BENCH4
|
|
655 |
CMP/220708/0009735 |
08/07/2022
|
20/12/2022
|
Saurabh sharma |
MAHENDRA HOMES PVT. LTD., |
Mahendra AARNA |
Mahendra Homes Pvt Ltd |
Bengaluru Urban |
Requesting RERA to help me get my entire amount, ie. One lakh rupees refunded. |
AUTHORITY
|
BENCH4
|
|
656 |
CMP/220614/0009624 |
14/06/2022
|
20/12/2022
|
Abdul Haq |
SAMMYS DREAM LAND CO PRIVATE LIMITED |
Sammy's Beverly Hills Phase-II |
SAMMYS DREAM LAND CO PRIVATE LIMITED |
Bengaluru Urban |
The builder should pay me Rs 29,98,100 (Appreciated Property Value Amount Rs. 1898100/- + Advance Amount- 11,00000) as compensation amount. The promoter is not responding to my emails for compensation |
AUTHORITY
|
BENCH4
|
|
657 |
CMP/210415/0007894 |
15/04/2021
|
20/12/2022
|
Anil Kumar I |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Rural |
To grant the Complainant a sum of Rs 30,00,000/- (Thirty Lakhs Only) from the Respondent towards delay compensation and damages caused to the Complainant. |
AUTHORITY
|
BENCH6
|
|
658 |
CMP/220607/0009600 |
07/06/2022
|
20/12/2022
|
Biddappa Bolandanda Subbaiah |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Polestar |
Ozone Realtors Private Limited |
Bengaluru Urban |
It is prayed that this Hon’ble Authority may kindly be pleased to direct respondent to refund sum of Rs.58,46,662/- along with Rs.1,00,000/- compensation. |
AUTHORITY
|
BENCH6
|
|
659 |
CMP/170802/0396753 |
02/08/2017
|
20/12/2022
|
DEEPAK ARYA |
P YOGANANDA |
NOT FOUND |
NOT FOUND |
Bengaluru Urban |
400000 along with interest till date |
AUTHORITY
|
BENCH4
|
|
660 |
CMP/220124/0008862 |
24/01/2022
|
20/12/2022
|
AJAY HANCHINAMANI |
MEDA GREENS |
Meda Greens |
Meda Greens |
Bengaluru Urban |
Need Refund from the builder |
AUTHORITY
|
BENCH4
|
|
661 |
CMP/170805/0104159 |
05/08/2017
|
20/12/2022
|
NILAYA DEEP |
VANDANA INFRA BUILDER |
NOT FOUND |
NOT FOUND |
Bengaluru Urban |
Refund with interest of money paid to builder |
AUTHORITY
|
BENCH4
|
|
662 |
CMP/211222/0008742 |
22/12/2021
|
20/12/2022
|
AJOSH CHERIAN |
IT ESTATES |
Garden Residency |
IT Estates |
Bengaluru Urban |
REFUND AND COMPENSATION HAS BEEN SOUGHT AS A RELIEF. THE COMPENSATION INCLUDING - AGREEMENT OF SALE AMOUNT, LOAN SANCTION AMOUNT, PENAL INTEREST, LITIGATION EXPENSES. |
AUTHORITY
|
BENCH6
|
|
663 |
CMP/220711/0009737 |
11/07/2022
|
19/12/2022
|
Nithya Priya K R |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1. Compensation(SBI MCLR 2%/month) to be paid from Aug 2021 before reg. 2. Builder should be prohibited from collecting maintenance before completing amenities 3. No further project extension by RERA |
AUTHORITY
|
BENCH6
|
|
664 |
CMP/220207/0008977 |
07/02/2022
|
19/12/2022
|
Vikash Gupta |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Raja Housing Ltd should pay compensation as per agreement from November 2021 till the possession date. |
AUTHORITY
|
BENCH6
|
|
665 |
CMP/220520/0009496 |
20/05/2022
|
19/12/2022
|
Sapna Ks |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Requesting now |
AUTHORITY
|
BENCH6
|
|
666 |
CMP/220328/0009263 |
28/03/2022
|
19/12/2022
|
Tanaya Jana |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
either builder should pay the due compensation or they must adjust it with next disbursement. |
AUTHORITY
|
BENCH6
|
|
667 |
CMP/220209/0008994 |
09/02/2022
|
19/12/2022
|
Suresh Turkani |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
No extension should be provided to builder and intervention needed to ensure builder adhere to RERA and deliver flat ASAP with compensation. |
AUTHORITY
|
BENCH6
|
|
668 |
CMP/UR/220207/0008975 |
07/02/2022
|
19/12/2022
|
Seshagiri Kommoju |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Urbana Pavallion |
Ozone Urbana Infra Developers Ltd |
Bengaluru Rural |
Full refund of the amount paid, loss of intrest and compenstation for delay, as per refund details in the attachment |
AUTHORITY
|
BENCH6
|
|
669 |
CMP/180220/0000502 |
20/02/2018
|
19/12/2022
|
ARUN KUMAR VALIPE |
SREEREDDY PROPERTIES PVT LTD. |
Sree SunMoon |
Sreereddy properties pvt ltd. |
Bengaluru Urban |
Complete all amenities and pay penalty & interest |
AUTHORITY
|
BENCH4
|
|
670 |
CMP/171113/0000214 |
13/11/2017
|
19/12/2022
|
Mrs.M.Sree Lakshmi |
M/s. SREEREDDY PROPETIES PVT LTD Represented by its managing Partner Mr.G.Sirish Kumar Reddy. S/o.G.Sreeramulu Reddy |
SREE SUNMOON |
M/s. SREEREDDY PROPETIES PVT LTD Represented by its managing Partner Mr.G.Sirish Kumar Reddy. S/o.G.Sreeramulu Reddy |
Bengaluru Urban |
compensation from the builder |
AUTHORITY
|
BENCH4
|
|
671 |
CMP/180708/0001017 |
08/07/2018
|
19/12/2022
|
M. RAMYA SUDHA |
G SIRISH KUMAR REDDY |
SreeReddy Arma |
SREEREDDY PROPERTIES PVT LTD |
Bengaluru Urban |
Refund of money paid with interest |
AUTHORITY
|
BENCH4
|
|
672 |
CMP/180708/0001016 |
08/07/2018
|
19/12/2022
|
M. NAGA SIVA KIRAN |
G SIRISH KUMAR REDDY, SREEREDDY PROPERTIES PVT LTD |
SreeReddy Arma |
SREEREDDY PROPERTIES PVT LTD |
Bengaluru Urban |
Refund of money paid with interest |
AUTHORITY
|
BENCH4
|
|
673 |
CMP/UR/201223/0007308 |
23/12/2020
|
19/12/2022
|
NITIN THARIYAN & RANI REBELLO |
J VIJAY REDDY, PALAZZA CITY |
PALAZZA CITY |
SJR PRIME PRIME CORPORATION PVT LTD |
Bengaluru Urban |
Compensation through interest on 81 lacs paid so far and full reimbursement of the amount with interest |
AUTHORITY
|
BENCH4
|
|
674 |
CMP/UR/201221/0007298 |
21/12/2020
|
19/12/2022
|
R RAMESH |
SABREESH T, SPT CONNECTED LIVING |
SPT Connected Living |
Sabreesh T |
Bengaluru Urban |
Please help me to get my refund and compensation. |
AUTHORITY
|
BENCH4
|
|
675 |
CMP/171116/0000228 |
16/11/2017
|
19/12/2022
|
GUDDI AND SANDEEP |
MAXWORTHREALITY INDIA PVT LTD |
max meadows and sadhana 2 |
maxworthreality india pvt ltd |
Bengaluru Urban |
refund of amount with interest |
AUTHORITY
|
BENCH4
|
|
676 |
CMP/190104/0001825 |
04/01/2019
|
19/12/2022
|
NANDKUMARSHARANAPPA NAREL |
MANGAL REALITY |
Gita Nagar |
Mangal Reality |
Kalaburgi |
1. Penalty to Promoter; 2. provision of OHT (overhead tank for water supply) and STP (for UGD connection/disposal) in the layout; 3. Compensation and interest payment for delaying the possession |
AUTHORITY
|
BENCH4
|
|
677 |
CMP/220117/0008812 |
17/01/2022
|
19/12/2022
|
Nischith Dsouza |
Godrej Properties Limited |
Godrej Aqua |
Godrej Properties Limited |
Bengaluru Urban |
Direct the Respondent No. 1 Godrej properties to refund the entire amount of Rs. 7,60,142.14 paid towards the purchase of the flat. |
AUTHORITY
|
BENCH5
|
|
678 |
CMP/210207/0007592 |
07/02/2021
|
19/12/2022
|
Vinayaka Mothkur |
Godrej Properties Limited |
Godrej Aqua |
Godrej Properties Limited |
Bengaluru Urban |
Request to intervein in the balance recovery of Rs. 1,18,000.00 from godrej properties which is retained as administrative charges. |
AUTHORITY
|
BENCH4
|
|
679 |
CMP/UR/221217/0010475 |
17/12/2022
|
17/12/2022
|
Poornima Vijay Anandh |
M/s. Shree Krishna Developers and Promoters |
Excise Layout |
M/s. Shree Krishna Developers and Promoters |
Bengaluru Urban |
PRAY TO DIRECT RESPONDENTS TO EXECUTE SALE DEED FOR THE SITE AS PER TERMS IN REGISTERED SALE AGREEMENT WITH ALL MOTHER DOCS, FULLY DEVELOPED WITH AMENITIES, AT NO EXTRA COST OR FURTHER DELAY, ISSUES. |
AUTHORITY
|
BENCH4
|
|
680 |
CMP/UR/221217/0010481 |
17/12/2022
|
17/12/2022
|
ROOPARANI C |
SRI KRISHNA DEVELOPERS |
Excise Layout |
SRI KRISHNA DEVELOPERS |
Bengaluru Urban |
REQUEST TO DIRECT RESPONDENTS TO EXECUTE SALE DEED FOR THE SITE AS PER TERMS IN THE REGISTERED SALE AGREEMENT WITH ALL MOTHER DOCS, FULLY DEVELOPED AMENITIES AT NO EXTRA COST OR FURTHER DELAY. |
AUTHORITY
|
BENCH4
|
|
681 |
CMP/UR/190525/0003116 |
25/05/2019
|
17/12/2022
|
MURLIDHAR PUTTASWAMY |
ROOPA INFRA PROJECTS (INDIA) PVT.LTD |
Green Mile |
Roopa Infra Projects (India) Pvt.Ltd |
Bengaluru Urban |
Expiation and Interest refund |
AUTHORITY
|
BENCH4
|
|
682 |
CMP/201209/0007224 |
09/12/2020
|
17/12/2022
|
Srinivasa Rao Vummidi |
KSR PROPERTIES PVT LTD |
KSR Basil |
KSR PROPERTIES PVT LTD |
Bengaluru Urban |
Compensation and Refund |
AUTHORITY
|
FULLBENCH
|
|
683 |
CMP/201231/0007351 |
31/12/2020
|
17/12/2022
|
Thimmarayappa B M |
KSR PROPERTIES PVT LTD |
KSR Basil |
KSR PROPERTIES PVT LTD |
Bengaluru Urban |
Refund with compensation as Project got Delayed . |
AUTHORITY
|
FULLBENCH
|
|
684 |
CMP/201219/0007230 |
19/12/2020
|
17/12/2022
|
GOPINADH PENDYALA |
KSR PROPERTIES PVT LTD |
KSR Basil |
KSR PROPERTIES PVT LTD |
Bengaluru Urban |
compensation and refund or Handover the flat |
AUTHORITY
|
FULLBENCH
|
|
685 |
CMP/201014/0006843 |
14/10/2020
|
17/12/2022
|
Ravi Kumar Koyyana |
KSR PROPERTIES |
KSR Basil |
KSR PROPERTIES PVT LTD |
Bengaluru Urban |
We want to get the amount refunded along with the interest. Including the interest paid the total amount as on today comes to nearly 49 lakhs. |
AUTHORITY
|
FULLBENCH
|
|
686 |
CMP/220113/0008788 |
13/01/2022
|
16/12/2022
|
Amol Agrawal |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH6
|
|
687 |
CMP/210415/0007891 |
15/04/2021
|
16/12/2022
|
Venkatesh G Iyer |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
To award Delay Compensation of Rs 30,00,000/- (Thirty Lakhs Only) for delay of 58 months in delivery of Possession over Ozone Urbana Pavillion Apartment K -203, a 3BHK Apartment having 1540 Square Ft. |
AUTHORITY
|
BENCH6
|
|
688 |
CMP/220308/0009086 |
08/03/2022
|
16/12/2022
|
Shalini Nagaraj |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Rural |
Early delivery of the apartment with all the interest and the delayed compensation at the earliest. |
AUTHORITY
|
BENCH6
|
|
689 |
CMP/220121/0008847 |
21/01/2022
|
16/12/2022
|
JYOTHI MUTHAPPA |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Rural |
Early delivery of the apartment with all the interest and the delayed compensation at the earliest. |
AUTHORITY
|
BENCH6
|
|
690 |
CMP/220922/0010040 |
22/09/2022
|
16/12/2022
|
Prerit Jain |
THills formerly known as Jaganmata Property Developers Private Limited |
Tivoli Hills Phase 3 |
THills formerly known as Jaganmata Property Developers Private Limited |
Bengaluru Urban |
Builder should return the booking amount |
AUTHORITY
|
BENCH4
|
|
691 |
CMP/UR/200824/0006404 |
24/08/2020
|
15/12/2022
|
Nitin Bujade |
SJR Prime Corporation Pvt ltd |
SJR Blue waters |
SJR Prime Corporation Pvt. Ltd. |
Bengaluru Urban |
Refund of amount and compensation due to delay in project handover |
AUTHORITY
|
BENCH5
|
|
692 |
CMP/201229/0007343 |
29/12/2020
|
15/12/2022
|
NIBEDITA PADHI & PRIYABRATA MOHAPATRA |
PRAKRUTI CENTURY PROPERTIES |
Century Sports Village |
Prakruti Century Properties |
Bengaluru Urban |
Please help in getting the booking amount refund of 1 lakh back and take strict action against the builder as they have hidden the fact (case) in the RERA portal and share the document after booking. |
AUTHORITY
|
BENCH4
|
|
693 |
CMP/190718/0003631 |
18/07/2019
|
15/12/2022
|
AYAN GANGULY |
M/S REDDY STRUCTURES PVT. LTD. |
|
|
Bengaluru Urban |
no |
AUTHORITY
|
BENCH4
|
|
694 |
CMP/201202/0007206 |
02/12/2020
|
15/12/2022
|
JITHESH BHARATHAN |
PROVIDENT HOUSING LIMITED |
Provident Skyworth Phase 2 |
Provident Housing Limited |
Bengaluru Urban |
Requst to get 15% compensation agaist the full payment |
AUTHORITY
|
BENCH4
|
|
695 |
CMP/211122/0008616 |
22/11/2021
|
15/12/2022
|
CHITHRA PARTHASARATHI |
PROVIDENT HOUSING LIMITED |
Provident Skyworth Phase 1 |
Provident Housing Limited |
Dakshina Kannada |
Need compensation for the delay in handover. They are sticking to the clause in the agreement pre RERA of Rs.2500/month and no eligibilty as there is a delay in 1 payment for which demand not recd |
AUTHORITY
|
BENCH4
|
|
696 |
CMP/201118/0007087 |
18/11/2020
|
15/12/2022
|
JEYA ANANDHAN |
RELIABLE DEVELOPER |
RELIAABLE DOLLAR COLLONY |
RD Buildtech and Developers(Kar) Pvt ltd |
Bengaluru Urban |
Refund of paid advance 2lakhs from RD with compensation for the delayed refund |
AUTHORITY
|
BENCH4
|
|
697 |
CMP/UR/220201/0008888 |
01/02/2022
|
15/12/2022
|
MEGHA S K |
RANGARAJU V |
|
|
Bengaluru Urban |
Assignment agreement has to be signed by Mr Rangaraju and the proceeds of the sale should be transferred to me. |
AUTHORITY
|
BENCH4
|
|
698 |
CMP/UR/211130/0008652 |
30/11/2021
|
15/12/2022
|
NEERA KUMAR MITTAL |
MR. J MADHUSUDAN, RICHMOND PRIDE PHASE 2 |
Richmond Pride Phase 2 |
Mr. J Madhusudan |
Bengaluru Urban |
Refund full amount of flat with interest (Including VAT, Service Tax, BESCOM, BWSSB and Maintenance) since project is incomplete till date |
AUTHORITY
|
BENCH4
|
|
699 |
CMP/UR/211126/0008647 |
26/11/2021
|
15/12/2022
|
NEIL MOHAN |
PRASHANTH M L, LALIT HERRONS |
Lalit Herrons |
Lalit Asia Dwellings Pvt Ltd |
Bengaluru Urban |
Refund required for my remaining 13Lakhs and the interest for the amount held by the builder. Cheating and breach of trust to be addressed. |
AUTHORITY
|
BENCH4
|
|
700 |
CMP/220720/0009782 |
20/07/2022
|
14/12/2022
|
SHURYA KUMAR |
M/S RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
The builder has to pay the delay compensation from January 2021 till OC is received. |
AUTHORITY
|
BENCH6
|
|
701 |
CMP/220321/0009175 |
21/03/2022
|
14/12/2022
|
Priyanshu Shrivastava |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1. Final Possession date 2. correct compensation as per agreement i.e monthly basis starting Nov 21 3. No further extension provided to the builder. 4. RERA website to be updated as per actuals |
AUTHORITY
|
BENCH6
|
|
702 |
CMP/220706/0009722 |
06/07/2022
|
14/12/2022
|
SUGANDHA |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
Casagrand Florella Phase 2 |
Casa Grande Garden City Builders Pvt ltd |
Bengaluru Urban |
Refund of booking amount of INR 100000. |
AUTHORITY
|
BENCH4
|
|
703 |
CMP/UR/220525/0009523 |
25/05/2022
|
13/12/2022
|
ANSHUMAN |
SATYABRATA DHIR |
Trishna orchid |
Trishna Real Estate |
Bengaluru Urban |
I would like builder to oblige to the agreement of compensating me and also closing the loan from the bank at the earliest. Along with compensation for all the harassment and delay. |
AUTHORITY
|
BENCH4
|
|
704 |
CMP/UR/220510/0009443 |
10/05/2022
|
13/12/2022
|
AMJAD F JAMADAR |
NADEEM MOHAMMED GHOUSE |
MGN PRIDE |
NADEEM MOHAMMED GOUSHE |
Belagavi (Belgaum) |
1) Community hall extend to parking 2) vacate commercial and illegal floors 3) maintainance to be made by owner for damages to building |
AUTHORITY
|
BENCH4
|
|
705 |
CMP/UR/220406/0009316 |
06/04/2022
|
13/12/2022
|
CHAITAL SHAH |
PROPTIGER SUNIL |
|
|
Bengaluru Urban |
Cashback from PropTiger |
AUTHORITY
|
BENCH4
|
|
706 |
CMP/210704/0008092 |
04/07/2021
|
13/12/2022
|
Manish Hotwani |
LILY REALTY PVT LTD |
Pashmina Waterfront -Phase-I |
Lily Realty Pvt Ltd |
Bengaluru Urban |
I need help from Rera to ask the builder to provide compensation as per the agreement. I am willing to take possession, if builder provides compensation. |
AUTHORITY
|
BENCH6
|
|
707 |
CMP/220609/0009608 |
09/06/2022
|
13/12/2022
|
Sharan UR |
SHRIPROP PROJECTS PRIVATE LIMITED |
SHRIRAM SOUTHERN CREST |
SHRIPROP PROJECTS PRIVATE LIMITED |
Bengaluru Urban |
We would require support from RERA as per standard relief offered (in terms of interest/amount support) toward this delay |
AUTHORITY
|
BENCH6
|
|
708 |
CMP/180308/0000557 |
08/03/2018
|
12/12/2022
|
MUNEER AHMED KM |
POWERHILLS CONSTRUCTION PVT. LTD |
HABITAT |
Powerhills Construction Pvt. Ltd |
Bengaluru Urban |
Return of Amount with Compensation under section 18 of RERA Act-16 |
AUTHORITY
|
BENCH4
|
|
709 |
CMP/220504/0009412 |
04/05/2022
|
12/12/2022
|
SURESH GURRAM |
MONARCH AQUA - BLOCK A |
Monarch Aqua - Block A |
Monarch |
Bengaluru Urban |
Refund of an amount of Rs.7,93,750 alongwith interest |
AUTHORITY
|
BENCH4
|
|
710 |
CMP/220801/0009834 |
01/08/2022
|
12/12/2022
|
SANJEEV KUMAR SHARMA |
CENTURY AUSTRAL |
CENTURY EDEN PHASE 2 |
CENTURY AUSTRAL |
Bengaluru Urban |
. It seems I got cheated and need your help to get me full refund with interest of booked plot. I don’t want to continue with Century |
AUTHORITY
|
BENCH4
|
|
711 |
CMP/UR/220509/0009435 |
09/05/2022
|
12/12/2022
|
SUBHASH PATEL PATEEL |
LOHITH A |
NANDI NATURE RESIDENCY |
Maha Group Developers and Promotors |
Bengaluru Urban |
Refund with compentation |
AUTHORITY
|
BENCH4
|
|
712 |
CMP/180618/0000928 |
18/06/2018
|
12/12/2022
|
PRASHANT KUMAR |
SAIBYA STERLING |
SAIBYA STERLING |
NOT FOUND |
Bengaluru Urban |
10% interest on the amount already paid. |
AUTHORITY
|
FULLBENCH
|
|
713 |
CMP/201215/0007267 |
15/12/2020
|
08/12/2022
|
ZAKIA PARVEEN ZAIDI |
HOSKOTE NEO HOMES LIMITED |
Emprasa Startup City - Residential |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
Refund of booking amount along with interest |
AUTHORITY
|
BENCH4
|
|
714 |
CMP/210401/0007855 |
01/04/2021
|
08/12/2022
|
VINOD M |
KARSTEN HOMES PVT LTD |
PALM GROVES |
KARSTEN HOMES PVT LTD |
Bengaluru Urban |
Refund of amount due on cancellation with interest |
AUTHORITY
|
BENCH4
|
|
715 |
CMP/211018/0008446 |
18/10/2021
|
08/12/2022
|
Amitabh |
KARSTEN HOMES PVT LTD |
PALM GROVES |
KARSTEN HOMES PVT LTD |
Bengaluru Urban |
As per the Supreme court verdict, Builder should pay me interest @10% until they gave me possession OR I would want them to refund all amount paid to them plus the interest paid by me. |
AUTHORITY
|
BENCH4
|
|
716 |
CMP/220713/0009743 |
13/07/2022
|
08/12/2022
|
Sandeep Roy Choudhury and Deboshree Chakraborty |
KARSTEN HOMES PVT LTD |
PALM GROVES |
KARSTEN HOMES PVT LTD |
Bengaluru Urban |
(i) Cancel the Agreement for Sale and Construction Agreement dated August 23, 2019, executed with the Complainants; (ii) Return the total amount disbursed by the Complainants to the Respondents |
AUTHORITY
|
BENCH4
|
|
717 |
CMP/211028/0008478 |
28/10/2021
|
07/12/2022
|
SYED TABREZ HASSAN & ERAM SIDDIQUI |
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
ALPINE FIESTA C E |
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
Bengaluru Urban |
Builder has done exterior plaster. It has actually reduced water seepage in study room. But still little dampness is there in study room and living room. Same must be fixed. |
AUTHORITY
|
BENCH4
|
|
718 |
CMP/210206/0007588 |
06/02/2021
|
07/12/2022
|
LOHITH NANJUNDA |
SJR PRIMECORPORATION PVT LTD |
SJR PRIMECORPOATION PVT LTD BLUE WATER PH2 |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
1200000 |
AUTHORITY
|
BENCH4
|
|
719 |
CMP/191204/0004885 |
04/12/2019
|
07/12/2022
|
Rajendra singh |
ASWANI PROPERTIES INDIA PVT LTD |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Registration and other work should complete as soon as possible |
AUTHORITY
|
BENCH6
|
|
720 |
CMP/191204/0004837 |
04/12/2019
|
07/12/2022
|
Krishna Ranjan |
ASWANI PROPERTIES INDIA PVT LTD, C. ANANDA REDDY |
Aswani Sunshine |
Aswani Properties India Pvt Ltd |
Bengaluru Urban |
Registration, completion of Project and Amenties |
AUTHORITY
|
BENCH6
|
|
721 |
CMP/UR/201228/0007339 |
28/12/2020
|
06/12/2022
|
Ranganathan N |
GM INFINITE DWELLING INDIA PVT LTD |
GM infinite e city town phase II |
Gulam Mustafa |
Bengaluru Urban |
Compensation sought as per Clause 7 of Construction Agreement - Rs 4 per square feet per month for 22 months in total. |
AUTHORITY
|
BENCH6
|
|
722 |
CMP/UR/211016/0008442 |
16/10/2021
|
06/12/2022
|
NAMRATA SADHWANI |
K. MANANI, MANANI PROJECTS PVT LTD |
Manani Ela |
Manani Projects Pvt.Ltd |
Bengaluru Urban |
Please return my advance for the plot and terminate any open purchase status. I need to compensated for misguidance during purchase and for my flight tickets booked with relevant correspondence. |
AUTHORITY
|
BENCH6
|
|
723 |
CMP/191219/0005023 |
19/12/2019
|
06/12/2022
|
Lt CDR Arjun Subramanyam |
DIRECTOR GENERAL, AIR FORCE NAVAL HOUSING BOARD |
JAL VAYU TOWERS |
AIR FORCE NAVAL HOUSING BOARD |
Mysore |
Refund of amount paid Rs.27,00,000/-(Twenty Seven lakh only) with interest at 12% from date of my withdrawal from project i.e., 16-04-2018. |
AUTHORITY
|
BENCH6
|
|
724 |
CMP/UR/190830/0004091 |
30/08/2019
|
06/12/2022
|
VENKATA RAMA PRASAD PADAVALA |
VANDANA INFRA REALTY |
Vandana Revivals Springwoods |
Vandana Infra Realty |
Bengaluru Urban |
Completion, NOC & compensation for the delay. |
AUTHORITY
|
BENCH4
|
|
725 |
CMP/220719/0009772 |
19/07/2022
|
06/12/2022
|
Sherine K J |
Brigade Enterprises Ltd |
Brigade Laguna |
Brigade Enterprises Ltd |
Bengaluru Urban |
Brigade is imposing a deduction of Rs1,27,130/- which is against RERA Act. I seek RERA's help to get full refund i.e Rs 2,00,000/-. |
AUTHORITY
|
BENCH4
|
|
726 |
CMP/200716/0006194 |
16/07/2020
|
06/12/2022
|
Harshil J Shah |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD(BUOYANT TECHNOLOGY CONSTELLATION PVT LTD), MANYATA REALTY |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH6
|
|
727 |
CMP/211111/0008543 |
11/11/2021
|
05/12/2022
|
MAMATHA P |
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
ALPINE FIESTA C E |
ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
Bengaluru Urban |
We would need our appartment Geluk E905 to be fixed permanently on the seapage issue. And Would need OC. |
AUTHORITY
|
BENCH4
|
|
728 |
CMP/211103/0008512 |
03/11/2021
|
05/12/2022
|
SAI TEJA REDDY K |
PUNNAMI PROPERTIES |
PUNNAMI BLISS |
Punnami properties |
Bengaluru Urban |
Please help obtain pending works, CC, OC, Individual electric meters, Khata, Flood management, Allotment of carparking |
AUTHORITY
|
BENCH4
|
|
729 |
CMP/UR/210806/0008222 |
06/08/2021
|
05/12/2022
|
AVINAV SEAL & PRACHITA GARODIA |
ELEGANCE ENTERPRISES PRADIP KUMAR SHARMA SANJEEV SINGH |
|
|
Bengaluru Urban |
Elegance Enterprises has not paid the amount of Rs. 91918 against their Credit Note. Requesting support from RERA to look into the matter and ensure the payment is made to us by Elegance Enterprises. |
AUTHORITY
|
BENCH4
|
|
730 |
CMP/220328/0009274 |
28/03/2022
|
05/12/2022
|
ARJUN RAMAKRISHNAN, DIVYA K, B RAMAKRISHNAN |
M/S. RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1. Timely payment of monthly compensation till the date of registration. 2. Handing over of apartment as per date promised. 3. Please do not approve further extension for this project/builder. |
AUTHORITY
|
BENCH6
|
|
731 |
CMP/200715/0006184 |
15/07/2020
|
03/12/2022
|
DR ANIL KUMAR INNA |
SHREE KATEELESHWARI INNOVATIVE PROJECTS |
ATHIKARI ACROPOLIS |
shree kateeleshwari innovative projects |
Dakshina Kannada |
To direct the respondents to execute and register a proper deed of conveyance in respect of premises immediately as per law.as per registered agreement 06/04/2016 |
AUTHORITY
|
BENCH4
|
|
732 |
CMP/220207/0008984 |
07/02/2022
|
02/12/2022
|
SAMIR GANESH JOSHI |
CENTURY REAL ESTATE HOLDINGS PRIVATE LIMITED |
Century Breeze |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
1) Direct Respondent to refund interest @20%p.a. on amount paid; 2) Direct Respondent to close loan acc. no. 632526021 & 633758801 with HDFC Bank by paying dues & issuing NOCs; 3) Such other relief |
AUTHORITY
|
BENCH4
|
|
733 |
CMP/UR/220518/0009481 |
18/05/2022
|
02/12/2022
|
Geetganga Harish |
BSNL Aero Park Residency |
BSNL Aero Park Residency |
BSNL Employee's House Building Co-operative Society |
Bengaluru Urban |
to give the interest on the amount paid along with compensation and penalty |
AUTHORITY
|
BENCH4
|
|
734 |
CMP/UR/220518/0009485 |
18/05/2022
|
02/12/2022
|
KAMALAMMA |
BSNL EMPLOYEES WELFARE HOUSE BUILDING CO-OPERATIVE SOCIETY LTD |
BSNL Aero Park Township |
BSNL Employees Welfare House Building Co-Operative Society LTD |
Bengaluru Urban |
To give the interest on the amount paid along with compensation and penalty |
AUTHORITY
|
BENCH4
|
|
735 |
CMP/UR/220610/0009611 |
10/06/2022
|
02/12/2022
|
Sri Sanjay Jha |
Golden Days |
Golden Days |
M/s. GOLDEN GATE PROPERTIES LTD. |
Bengaluru Urban |
1) To direct the Respondent to refund Rs.3,00,000/- (Rupees Three Lakhs Only) along with applicable interests. 2) To award costs. 3) Such other orders and reliefs that this Hon'ble Authority deems fit |
AUTHORITY
|
BENCH5
|
|
736 |
CMP/UR/210201/0007456 |
01/02/2021
|
30/11/2022
|
HANAMANTH KRISHNA JI |
RAMANASHREE BLUE SKY GREENWOODS |
RAMANASHREE BLUE SKY GREEN WOODS |
BLUE SKY BUILDTEC - REPRESENTED BY SRI V RAVINDRA NAIDU, PARTNER |
Bengaluru Urban |
IN VIEW OF THE FACTS MENTIONED ABOVE, THE COMPLAINANT PRAYS FOR RELIEF AS DEEMED FIT AND APPROPRIATE |
AUTHORITY
|
FULLBENCH
|
|
737 |
CMP/221104/0010185 |
04/11/2022
|
29/11/2022
|
Deepam Pandey & Sonam Pandey |
SREE DURGA BUILDERS AND DEVELOPERS |
DURGA NANDANA |
SREE DURGA BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Direct builder to remove STP from West side of apartment and Meter room from East of apartment. |
AUTHORITY
|
BENCH4
|
|
738 |
CMP/UR/200101/0005058 |
01/01/2020
|
29/11/2022
|
Gangireddy Paturu |
ARV INFRASTRUCTURES |
AVR Temple Tree |
M/s. ARV Infrastructures – represented by its Partners – a) Mr. D. Amaranadha Reddy, b) Mr. K. Ramalinga Reddy & c) Mr. V. Veera Reddy |
Bengaluru Urban |
Delivery of possession, completion of amenities and delay compensation. |
AUTHORITY
|
BENCH6
|
|
739 |
CMP/220406/0009320 |
06/04/2022
|
29/11/2022
|
Kamal Kishor Nayak |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation |
AUTHORITY
|
BENCH6
|
|
740 |
CMP/200311/0005004 |
11/03/2020
|
28/11/2022
|
M Ibopishak Singha |
BHARATH REDDY, ARYAN HOMETEC PVT LTD |
|
|
Bengaluru Urban |
Cancel the flat, need refund the booking amount & close the home loan. |
AUTHORITY
|
BENCH6
|
|
741 |
CMP/211210/0008709 |
10/12/2021
|
28/11/2022
|
RATHIN PAUL |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1. Raja housing Ltd should start paying me compensation starting from 1Nov2021 till the project completion date. 2. Requesting RERA to not provide further extension of completion date to this project. |
AUTHORITY
|
BENCH6
|
|
742 |
CMP/200702/0006106 |
02/07/2020
|
28/11/2022
|
Atul Kumar Aggarwal |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 1 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Delay interest, compensation, others |
AUTHORITY
|
BENCH6
|
|
743 |
CMP/200914/0006580 |
14/09/2020
|
28/11/2022
|
Manish Kumar Agrawal |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 1 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Quash demand notes, possession, delay interest, compensation etc |
AUTHORITY
|
BENCH6
|
|
744 |
CMP/180607/0000899 |
07/06/2018
|
28/11/2022
|
Prasanth C John |
Bijay Agarwal Gold Summit Project |
Gold Summit |
Salarpuria Sattva |
Bengaluru Urban |
Refund of Full Amount along with Interest (1.5% per month) |
AUTHORITY
|
BENCH4
|
|
745 |
CMP/220111/0008775 |
11/01/2022
|
28/11/2022
|
Ganesh Chandra Das |
M/S AZEEM INFINITE DWELLING (INDIA) PVT LTD |
GM ELEGANCE TOWER-1 (E-12) |
M/s. AZEEM INFINITE DWELLING (INDIA) PVT LTD |
Bengaluru Urban |
I am looking for flat with compensation. In case Flat won't able to provide, request to compensate with market rate. |
AUTHORITY
|
BENCH6
|
|
746 |
CMP/220111/0008776 |
11/01/2022
|
28/11/2022
|
Pronob Kumar Mondal |
M/S. AZEEM INFINITE DWELLING (INDIA) PVT LTD |
GM ELEGANCE TOWER-1 (E-12) |
M/s. AZEEM INFINITE DWELLING (INDIA) PVT LTD |
Bengaluru Urban |
I am looking for flat with compensation. In case Flat won't able to provide, request to compensate with market rate. |
AUTHORITY
|
BENCH6
|
|
747 |
CMP/220122/0008853 |
22/01/2022
|
28/11/2022
|
Subramanya Krishnamurthy |
MANYAM ESTATES PVT LTD |
MANYAM SKYPARK |
Manyam Estates Private Limited |
Bengaluru Urban |
Get the status, get the refund with interest. |
AUTHORITY
|
BENCH6
|
|
748 |
CMP/201130/0006967 |
30/11/2020
|
25/11/2022
|
ANITHA VASHISHT |
HOYSALA PROJECTS PRIVATE LIMITED |
Hoysala Ace-II |
Hoysala Projects Private Limited |
Bengaluru Urban |
Direct the Respondent to pay delay compensation and damages till the date of receipt of Occupancy Certificate. Direct the Respondent to complete the construction at the earliest and form Association. |
AUTHORITY
|
BENCH4
|
|
749 |
CMP/201130/0007084 |
30/11/2020
|
25/11/2022
|
SHIVALINGAPPA |
HOYSALA PROJECTS PRIVATE LIMITED |
Hoysala Ace-II |
Hoysala Projects Private Limited |
Bengaluru Urban |
Direct the Respondent to pay delay compensation and damages till the date of receipt of Occupancy Certificate. Direct the Respondent to complete the construction at the earliest and form Association. |
AUTHORITY
|
BENCH4
|
|
750 |
CMP/220430/0009403 |
30/04/2022
|
25/11/2022
|
Mahadevappa Subhashchandra |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Returns of amount and full compensation from Builder |
AUTHORITY
|
BENCH4
|
|
751 |
CMP/220421/0009380 |
21/04/2022
|
25/11/2022
|
SHAIK JABEED |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
752 |
CMP/220412/0009344 |
12/04/2022
|
25/11/2022
|
BASAVARAJ BABALESHWAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
753 |
CMP/220407/0009323 |
07/04/2022
|
25/11/2022
|
SIDDAROODH BIRADAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
754 |
CMP/220406/0009322 |
06/04/2022
|
25/11/2022
|
RAJSHEKHAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
755 |
CMP/220406/0009321 |
06/04/2022
|
25/11/2022
|
SHIVARAJ B DODDANNAVAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
756 |
CMP/220406/0009313 |
06/04/2022
|
25/11/2022
|
R VISHWANATH |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
757 |
CMP/220405/0009312 |
05/04/2022
|
25/11/2022
|
JAITIRTH B KULKARNI |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
758 |
CMP/220330/0009291 |
30/03/2022
|
25/11/2022
|
SHUBHAKAR B K |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
759 |
CMP/220330/0009292 |
30/03/2022
|
25/11/2022
|
SHIVANAND BIRADAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with Compensation |
AUTHORITY
|
BENCH4
|
|
760 |
CMP/220330/0009290 |
30/03/2022
|
25/11/2022
|
MAHESH KUMAR K |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Return of amount & compensation |
AUTHORITY
|
BENCH4
|
|
761 |
CMP/220329/0009288 |
29/03/2022
|
25/11/2022
|
PRASAD G PUROHIT |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Returns fund with compensation |
AUTHORITY
|
BENCH4
|
|
762 |
CMP/220329/0009287 |
29/03/2022
|
25/11/2022
|
NOORANDAPPA MADANAGUNDI |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Need Refund with compensation |
AUTHORITY
|
BENCH4
|
|
763 |
CMP/220329/0009284 |
29/03/2022
|
25/11/2022
|
SHARANABASAPPA |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund & Compensation |
AUTHORITY
|
BENCH4
|
|
764 |
CMP/220329/0009279 |
29/03/2022
|
25/11/2022
|
MANJUNATH S GONDAKAR |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Required house in the project as per sale agreement OR refund the amount as per present value with interest till date |
AUTHORITY
|
BENCH4
|
|
765 |
CMP/220225/0009054 |
25/02/2022
|
25/11/2022
|
SAMPATHKUMAR CP |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Please help me to get the down payment amount paid with interest along with the interest paid to bank with extra compensation for waiting 6 years. |
AUTHORITY
|
BENCH4
|
|
766 |
CMP/220217/0009020 |
17/02/2022
|
25/11/2022
|
SHIVAKUMARAYYA VAIJINATHAYYA |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Return of Amount and full compensation |
AUTHORITY
|
BENCH4
|
|
767 |
CMP/210208/0007593 |
08/02/2021
|
25/11/2022
|
UMA KADADI |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
REFUND ALONG WITH INTEREST |
AUTHORITY
|
BENCH4
|
|
768 |
CMP/220217/0009019 |
17/02/2022
|
25/11/2022
|
MALLIKARJUNA H S |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Return of amount with full (of worth) compensation for waste of money, time and endanger the desires of the middle class people |
AUTHORITY
|
BENCH4
|
|
769 |
CMP/220520/0009489 |
20/05/2022
|
25/11/2022
|
UMESHA & SANGEETHA.M. |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Need this settled as we have no hope this building will see completion. Need refund of all the money we spent on this project as on date with admissible interest rate which will be a great relief . |
AUTHORITY
|
BENCH4
|
|
770 |
CMP/220411/0009341 |
11/04/2022
|
25/11/2022
|
T JAGADEESHA |
SAI PRITHVI ELITE |
SAI PRITHVI ELITE |
BASAVARAJ MALLIKARAJUN YERAGAL |
Bengaluru Urban |
Refund with compensation |
AUTHORITY
|
BENCH4
|
|
771 |
CMP/UR/210212/0007523 |
12/02/2021
|
25/11/2022
|
SRIDHAR H RANGARAJAN |
UNISHIRE DEVELOPERS PRIVATE LIMITED |
Unishire Esplanade |
Unishire Developers Private Limited |
Bengaluru Urban |
Refund a sum of INR 1,87,67,299/- along with 10.5% P.A. from 01.09.2015 till date along with compensation under Section 18 and 19 of the Real Estate (Regulation and Development) Act, 2016 |
AUTHORITY
|
BENCH4
|
|
772 |
CMP/200320/0005759 |
20/03/2020
|
25/11/2022
|
HILLTOP ARCADE RESIDENCY |
DR KASIM GUDIHAL |
|
|
Bengaluru Urban |
Immediate Payment of Outstanding dues, Registration of Sale Deed, Payment of interest for delayed payments and related penalties for non registration within the stipulated time period |
AUTHORITY
|
BENCH4
|
|
773 |
CMP/210210/0007605 |
10/02/2021
|
21/11/2022
|
ABRAHAM PANICKER |
Jains Aashraya |
Jains Aashraya |
Jain Housing & Construction Ltd. |
Bengaluru Urban |
Compensation of minimum 8Lakhs (taking 6.7% as FD rate in 2018) and timebound completion of project |
AUTHORITY
|
BENCH4
|
|
774 |
CMP/210801/0008194 |
01/08/2021
|
21/11/2022
|
A R Ramesh |
Jains Aashraya |
Jains Aashraya |
Jain Housing & Construction Ltd. |
Bengaluru Urban |
Request for refund of payment made so far with Interest payable as specified in Rera Agreement |
AUTHORITY
|
BENCH4
|
|
775 |
CMP/210825/0008272 |
25/08/2021
|
21/11/2022
|
HalanaGouda Bharamagoudra |
Jains Aashraya |
Jains Aashraya |
Jain Housing & Construction Ltd. |
Bengaluru Urban |
Help me to get the flat as committed / shown by the builder during the booking and compensation for delays, compromised amenities, mental torture |
AUTHORITY
|
BENCH4
|
|
776 |
CMP/211109/0008530 |
09/11/2021
|
21/11/2022
|
Kewal Chand Chhajer |
Jains Aashraya |
Jains Aashraya |
Jain Housing & Construction Ltd. |
Bengaluru Urban |
Delay compensation |
AUTHORITY
|
BENCH4
|
|
777 |
CMP/210301/0007707 |
01/03/2021
|
21/11/2022
|
RAMAMOHAN REDDY PEDDIREDDY |
BOLLINENI SILAS |
BOLLINENI SILAS |
BOLLINENI DEVELOPERS LTD |
Bengaluru Urban |
Requesting RERA to help me in getting refund of Rs 30,000 considering my Maintenance for 3 months (14,400), Extra DG charges i have paid(4900) and some addition refund considering other issues |
AUTHORITY
|
BENCH4
|
|
778 |
CMP/UR/191115/0004730 |
15/11/2019
|
17/11/2022
|
Artha Emprasa commercial unit cancellation |
HOSKOTE NEO HOMES LIMITED |
Artha Emprasa startup city |
HOSKOTE NEO HOMES LIMITED |
Bengaluru Urban |
Help get refund for cancelled commercial project |
AUTHORITY
|
BENCH6
|
|
779 |
CMP/UR/200902/0006494 |
02/09/2020
|
17/11/2022
|
AJAY KUMAR |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAK DALE GREENS |
Software Engineers & Doctors Housing Co-operative Society Ltd |
Bengaluru Urban |
Direct the Opposite Party to Refund Rs.52,00,000 with interest @ 18%, Compensation, Costs, Other Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
780 |
CMP/UR/200902/0006499 |
02/09/2020
|
17/11/2022
|
AJAY KUMAR |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAKDALE GREENS |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
Bengaluru Urban |
Direct the Opposite Party/ Respondent to refund Rs.28,00,000/- with interest @ 18% from date of payment to date of refund, Compensation, Costs, Other Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
781 |
CMP/UR/200903/0006497 |
03/09/2020
|
17/11/2022
|
PRAVEENA AJAY |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAK DALE GREENS |
Software Engineers & Doctors Housing Co-Operative Society Ltd |
Bengaluru Urban |
Direct the Opposite Party to Refund Rs.52,00,000 with interest @ 18% from dated of payment to date of refund, Compensation, Costs, Other Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
782 |
CMP/UR/200903/0006507 |
03/09/2020
|
17/11/2022
|
VIDYA UDAY |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAKDALE GREENS |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
Bengaluru Urban |
Direct the Opposite Party to Refund Rs.52,00,000/- with interest @ 18% from date of payment to date of refund, Compensation, Costs, Other Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
783 |
CMP/UR/200904/0006500 |
04/09/2020
|
17/11/2022
|
Ananditha Ajay |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAKDALE GREENS |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
Bengaluru Urban |
Direct the Opposite Party Society to refund Rs.28,00,000/- with interest @ 18% from date of payment to date of refund, Compensation, Costs, Other Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
784 |
CMP/UR/200904/0006508 |
04/09/2020
|
17/11/2022
|
UDAY KUMAR |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
OAKDALE GREENS |
SOFTWARE ENGINEERS & DOCTORS HOUSING CO-OPERATIVE SOCIETY LTD |
Bengaluru Urban |
Direct the Opposite Party to Refund Rs.52,00,000/- with interest @ 18% from date of payment to date of refund, Compensation, Costs, Amounts as per Relief Sought |
AUTHORITY
|
BENCH6
|
|
785 |
CMP/220401/0009306 |
01/04/2022
|
17/11/2022
|
Leander Martin Andrade |
SHRIRAM PROPERTIES PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation which is SBI repo rate plus 2% to be given immediately effective March 2021 as promised by promoter in the agreement. |
AUTHORITY
|
BENCH6
|
|
786 |
CMP/220426/0009385 |
26/04/2022
|
17/11/2022
|
Manjula Kumar |
SHRIVISION TOWERS PRIVATE LIMITED |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in delivery since Apr 2021 |
AUTHORITY
|
BENCH6
|
|
787 |
CMP/220504/0009418 |
04/05/2022
|
17/11/2022
|
Manjula Kumar |
SHRIVISION TOWERS PRIVATE LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Compensation for the delay in delivery since Mar 2021 |
AUTHORITY
|
BENCH6
|
|
788 |
CMP/211013/0008436 |
13/10/2021
|
16/11/2022
|
Sanjay Nandgowli |
BVL ESTATE PRIVATE LIMITED |
KRISHVI STATURA |
BVL Estate Pvt. Ltd., |
Bengaluru Urban |
Now, I want the same flat with same price. |
AUTHORITY
|
BENCH6
|
|
789 |
CMP/220727/0009819 |
27/07/2022
|
16/11/2022
|
Yogish T Gowda |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Quashing of Maintenance charges until all the amenities are made available |
AUTHORITY
|
BENCH6
|
|
790 |
CMP/220520/0009497 |
20/05/2022
|
16/11/2022
|
Raja Ravi Kiran Yeluri |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
1) Deny phase 1 extension approvals sought by RHL. 2) Compensation for the delay as per the agreement 3) Instruct RHL to update correct status in RERA website and to customers |
AUTHORITY
|
BENCH6
|
|
791 |
CMP/UR/220526/0009535 |
26/05/2022
|
16/11/2022
|
HILL CREST APARTMENT OWNERS ASSOCIATION |
MS SUADELA CONSTRUCTIONS PVT LTD |
Hill Crest |
Ms Suadela Constructions Pvt Ltd |
Bengaluru Urban |
Registration of Project + Adherence to Sanction Plans + direction to restrain Developer from retaining ownership of Club House + cost of Litigation |
AUTHORITY
|
BENCH4
|
|
792 |
CMP/210710/0008114 |
10/07/2021
|
16/11/2022
|
Shobha Thondiathara Rajappan |
THE GREENS PHASE II |
THE GREENS PHASE II |
Sanchaya Land And Estate Pvt Ltd |
Bengaluru Urban |
Full refund of booking amount with delayed interests & other charges. |
AUTHORITY
|
BENCH4
|
|
793 |
CMP/210706/0008103 |
06/07/2021
|
16/11/2022
|
Francis Pradeep Fernandes |
THE GREENS PHASE II |
THE GREENS PHASE II |
Sanchaya Land And Estate Pvt Ltd |
Bengaluru Urban |
RERA's help is required to get the refund of the cancelled booking from 26th December, 2019 |
AUTHORITY
|
BENCH4
|
|
794 |
CMP/211110/0008533 |
10/11/2021
|
16/11/2022
|
Naveen P Naiker |
THE GREENS PHASE I |
THE GREENS PHASE I |
Sanchaya Land And Estate Pvt Ltd |
Bengaluru Urban |
REFUND OF TOTAL AMOUNT PAID INCLUDING INTEREST AND COMPENSATION |
AUTHORITY
|
BENCH4
|
|
795 |
CMP/220713/0009744 |
13/07/2022
|
16/11/2022
|
Shakti Hirwani |
ARYAN HOMETEC PVT LTD |
ARYAN GOLDEN ARENA - C |
ARYAN HOMETEC PVT LTD |
Bengaluru Urban |
Please Intervene aggressively to help on refund of Entire Amount Paid along with Pre EMI interest and EMI Interest till date paid to the Bank. |
AUTHORITY
|
BENCH6
|
|
796 |
CMP/220304/0009075 |
04/03/2022
|
15/11/2022
|
Prasenjit Das |
TANMATHRA AQUARELLE DEVELOPERS PVT LTD |
SHRIRAM CHIRPING GROVE - 2 |
TANMATHRA AQUARELLE DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Developer to refund the token amount of Rs. 50,000 |
AUTHORITY
|
BENCH6
|
|
797 |
CMP/200815/0006329 |
15/08/2020
|
15/11/2022
|
Sandeep Radhakrishnan |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Fast track completion within a period not extending a year. If builder cannot handle further, please take action to handover the project to any other reliable reputed builder and complete the project |
AUTHORITY
|
BENCH6
|
|
798 |
CMP/200927/0006682 |
27/09/2020
|
15/11/2022
|
Lakshminarayana and Padma |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
Relief as per the decision of the supreme court cited above |
AUTHORITY
|
BENCH6
|
|
799 |
CMP/UR/191226/0004984 |
26/12/2019
|
14/11/2022
|
Kiran Agaradahalli Veerappa |
Antevorta Developers Pvt Ltd |
Glengate- House of Hiranandani Hebbal |
Antevorta Developers Pvt Ltd |
Bengaluru Urban |
Refund of complete amount paid to the developer along with applicable interest and compensation |
AUTHORITY
|
FULLBENCH
|
|
800 |
CMP/200226/0005483 |
26/02/2020
|
14/11/2022
|
PRADDEEP S KAPPATTANAVAR |
Antevorta Developers Private Limited |
Glengate |
Antevorta Developers Private Limited |
Bengaluru Urban |
Refund of amount along with interst and compensation |
AUTHORITY
|
FULLBENCH
|
|
801 |
CMP/191124/0004799 |
24/11/2019
|
14/11/2022
|
Nagaraj |
Antevorta Developers Private Limited |
Glengate |
Antevorta Developers Private Limited |
Bengaluru Urban |
Return of Amount and Compensation |
AUTHORITY
|
FULLBENCH
|
|
802 |
CMP/220509/0009433 |
09/05/2022
|
14/11/2022
|
Vishal Singh |
SHRIVISION TOWERS PVT LTD |
SHRIRAM GREEN FIELD PHASE 2 |
SHRIVISION TOWERS PRIVATE LIMITED |
Bengaluru Urban |
Seeking for right compensation amount due to delay in Possession |
AUTHORITY
|
BENCH6
|
|
803 |
CMP/210628/0008065 |
28/06/2021
|
12/11/2022
|
M S V A PRADEEP |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Immediate Completion of the project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill Name Transfer and Compensation till the handover of society |
AUTHORITY
|
FULLBENCH
|
|
804 |
CMP/210914/0008328 |
14/09/2021
|
12/11/2022
|
SHARANA KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Compensation |
AUTHORITY
|
FULLBENCH
|
|
805 |
CMP/210625/0008057 |
25/06/2021
|
12/11/2022
|
KOLA AVINASH |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
request to take actions for quick finish the project |
AUTHORITY
|
FULLBENCH
|
|
806 |
CMP/210624/0008054 |
24/06/2021
|
12/11/2022
|
HARI DURGAPRASAD |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Completion of project to the earliest with quality and compensation till date of completion for the loss due to in complete amenities. |
AUTHORITY
|
FULLBENCH
|
|
807 |
CMP/210625/0008056 |
25/06/2021
|
12/11/2022
|
SOWMITRI |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
All Pending work as promised has to be completed with in 2months from now |
AUTHORITY
|
FULLBENCH
|
|
808 |
CMP/210627/0008062 |
27/06/2021
|
12/11/2022
|
SHAMBHU NATH YADAV |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Completion of the Complaints to the earliest and due compensation for the delay caused. |
AUTHORITY
|
FULLBENCH
|
|
809 |
CMP/210623/0008047 |
23/06/2021
|
12/11/2022
|
MATHIVANAN ELANGOVAN |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Complete the Project without further delay and need status of the Completion and Quality of work also compensation till the handover and for the delayed time period. |
AUTHORITY
|
FULLBENCH
|
|
810 |
CMP/211206/0008686 |
06/12/2021
|
12/11/2022
|
MALAY KUMAR K |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Basic amenities are required |
AUTHORITY
|
FULLBENCH
|
|
811 |
CMP/210623/0008049 |
23/06/2021
|
12/11/2022
|
SANDEEP REEDY MUKKAMALLA |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
I want complete all pending work in ss snowdrop apartment . |
AUTHORITY
|
FULLBENCH
|
|
812 |
CMP/210623/0008028 |
23/06/2021
|
12/11/2022
|
SAMARTH SAXENA |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Completion of all amenities as promised by builder at the earliest. |
AUTHORITY
|
FULLBENCH
|
|
813 |
CMP/210625/0008055 |
25/06/2021
|
12/11/2022
|
P VIJAYALAXMI |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Early completion of the project with quality and compensation till the handover date |
AUTHORITY
|
BENCH4
|
|
814 |
CMP/210630/0008081 |
30/06/2021
|
12/11/2022
|
VISHAL ANAND |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
We need proper completion date with Quality material and compensation for delay. |
AUTHORITY
|
FULLBENCH
|
|
815 |
CMP/210623/0008052 |
23/06/2021
|
12/11/2022
|
GURUPRASAD UDDANDAM |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Please do the needful as we are not able to catch the builder and they are not under standing our suffering and Enjoying with our hard earned money. Requesting RERA please do proper action on builder. |
AUTHORITY
|
FULLBENCH
|
|
816 |
CMP/210623/0008048 |
23/06/2021
|
12/11/2022
|
SHAKTI PRASANNA PATTNAYAK |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Early completion of the project with quality and compensation till handover. |
AUTHORITY
|
FULLBENCH
|
|
817 |
CMP/210622/0008025 |
22/06/2021
|
12/11/2022
|
SUBHASMIT PRUSTY |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Expedite the development of the Apartment with all its amenities. Do not give any more relaxation to builder as already 9 months relaxation has been provided. |
AUTHORITY
|
FULLBENCH
|
|
818 |
CMP/210623/0008030 |
23/06/2021
|
12/11/2022
|
BIKASH KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Complete the Project and Arrange compensation for our losses |
AUTHORITY
|
FULLBENCH
|
|
819 |
CMP/210623/0008053 |
23/06/2021
|
12/11/2022
|
MADUPURI THIRUMALA RAGHAVENDRA PRASAD |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Request to take actions for quick finish the project |
AUTHORITY
|
FULLBENCH
|
|
820 |
CMP/210630/0008084 |
30/06/2021
|
12/11/2022
|
SUJIT RAI |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Yes,Amenities and permanent power supply require. |
AUTHORITY
|
FULLBENCH
|
|
821 |
CMP/210630/0008083 |
30/06/2021
|
12/11/2022
|
SHYAM SEKHAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
I am expecting to finish the project with all eminities |
AUTHORITY
|
FULLBENCH
|
|
822 |
CMP/210625/0008060 |
25/06/2021
|
12/11/2022
|
POOLLA SESHA VENKATA RAMESH |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Project completion with all amenities as per contractual obligation and compensation sought for poor quality of work |
AUTHORITY
|
FULLBENCH
|
|
823 |
CMP/210628/0008066 |
28/06/2021
|
12/11/2022
|
ARAVIND VENKATAKRISHNAN |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Kindly penalize builders and get the project completed as soon as possible |
AUTHORITY
|
FULLBENCH
|
|
824 |
CMP/210623/0008031 |
23/06/2021
|
12/11/2022
|
SUJEET KUMAR |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
RERA should ask Builder to complete the project as soon as possible else builder should compensate for lack of amenities which was promised at the time of buying. |
AUTHORITY
|
FULLBENCH
|
|
825 |
CMP/210630/0008085 |
30/06/2021
|
12/11/2022
|
BRIJESH KUMAR BEHERA |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
EARLY COMPLETION WITH GOOD QUALITY WORK |
AUTHORITY
|
FULLBENCH
|
|
826 |
CMP/210628/0008063 |
28/06/2021
|
12/11/2022
|
NESAMANI |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
We want all the Builder promised things needs to be ready at the earliest. |
AUTHORITY
|
FULLBENCH
|
|
827 |
CMP/210623/0008051 |
23/06/2021
|
12/11/2022
|
LOKESH AYYALA |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Completion of amenities, Rework of where poorly finished work for building and compensation for delay if possible |
AUTHORITY
|
FULLBENCH
|
|
828 |
CMP/210623/0008050 |
23/06/2021
|
12/11/2022
|
SATYAPRIYA TARANIA |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Early completion of the project with Quality and compensation till the handover. |
AUTHORITY
|
FULLBENCH
|
|
829 |
CMP/210628/0008064 |
28/06/2021
|
12/11/2022
|
JITENDRA KUMAR SAMANTARAY |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
Early completion of the project with quality and compensation till handover. |
AUTHORITY
|
FULLBENCH
|
|
830 |
CMP/UR/221112/0010263 |
12/11/2022
|
12/11/2022
|
YEMIREDDY SILAS ABISHEK REDDY |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP:::PRM/KA/RERA/1251/446/PR/180728/001963 |
M/S.S.S.BUILDERS AND DEVELOPERS |
Bengaluru Urban |
Immediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of society. |
AUTHORITY
|
FULLBENCH
|
|
831 |
CMP/221102/0010157 |
02/11/2022
|
12/11/2022
|
B SREENIVASULA REDDY |
Sobha Limited |
Sobha Lake Gardens Phase 2 |
Sobha Limited |
Bengaluru Urban |
REFUND |
AUTHORITY
|
BENCH4
|
|
832 |
CMP/220829/0009959 |
29/08/2022
|
12/11/2022
|
Radhakrishna Nayak |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay in delivery of possession |
AUTHORITY
|
BENCH4
|
|
833 |
CMP/220816/0009893 |
16/08/2022
|
12/11/2022
|
Dr PREMALATHA V |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
compensation and interest. (Memo of calculation : 40000 * 12 Months * 4 Year = Rs : 19,20,000 ) |
AUTHORITY
|
BENCH4
|
|
834 |
CMP/220928/0010046 |
28/09/2022
|
12/11/2022
|
KIRAN KUMAR E |
S AND S BUILDERS AND DEVELOPERS |
TRILLIUM APARTMENTS |
S AND S BUILDERS AND DEVELOPERS |
Bengaluru Urban |
expecting the compensation for one year rent for the rented house or waiving of maintenance charges till date and for further one year as well |
AUTHORITY
|
FULLBENCH
|
|
835 |
CMP/220614/0009629 |
14/06/2022
|
12/11/2022
|
BINDU S JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation on the full amount paid, by way of interest, penalty. |
AUTHORITY
|
BENCH4
|
|
836 |
CMP/201218/0007242 |
18/12/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
Refund or compensation as explained above |
AUTHORITY
|
BENCH5
|
|
837 |
CMP/201107/0007032 |
07/11/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
Commitment or full refund (refund preferred) |
AUTHORITY
|
BENCH5
|
|
838 |
CMP/210408/0007875 |
08/04/2021
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
Refund of amount paid till date with interest accrued till date |
AUTHORITY
|
BENCH6
|
|
839 |
CMP/210406/0007871 |
06/04/2021
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
Cancellation of allotment and refund of entire amount paid so far with interest |
AUTHORITY
|
BENCH5
|
|
840 |
CMP/201127/0007136 |
27/11/2020
|
12/11/2022
|
AANAND VASU |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
Refund of full amount paid and cancellation of allotment due to breach of agreement and trust. If cancelled before 31 Dec 2021, I do not need to be compensated for interest. |
AUTHORITY
|
BENCH5
|
|
841 |
CMP/221010/0010071 |
10/10/2022
|
12/11/2022
|
KALPESH JAIN |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
compensation for delay of delivery date of the project as the initial delivery date as per the agreement is 31st dec 2019. |
AUTHORITY
|
FULLBENCH
|
|
842 |
CMP/210202/0007564 |
02/02/2021
|
12/11/2022
|
SWETA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Sapphire- Tower 5 |
Relationship Properties Private Limited |
Bengaluru Urban |
We demand full refund from builder with interest as per RERA act for various violations of RERA Act. |
AUTHORITY
|
BENCH5
|
|
843 |
CMP/221112/0010260 |
12/11/2022
|
12/11/2022
|
CHANDRAMALLEGOWDA C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation and house rent with interest at 18% till handing over possession of the flat. |
AUTHORITY
|
FULLBENCH
|
|
844 |
CMP/221112/0010259 |
12/11/2022
|
12/11/2022
|
AKBAR BAIG |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
REFUND OF FULL AMOUNT WITH INTEREST |
AUTHORITY
|
FULLBENCH
|
|
845 |
CMP/221010/0010072 |
10/10/2022
|
12/11/2022
|
ASHIWN KUMAR SAGARMAL |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
COMPENSATION FOR DELAY OF DELIVERY DATE OF THE PROJECT AS THE INITIAL DELIVERY DATE AS PER THE AGREEMENT IS 32ST DEC 2019. |
AUTHORITY
|
FULLBENCH
|
|
846 |
CMP/201219/0007289 |
19/12/2020
|
12/11/2022
|
FEROZE AZEEZ |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Nitesh Hyde Park |
NITESH HOUSING DEVELOPERS PRIVATE LIMITED |
Bengaluru Urban |
Delivery of apartment with project completed in all aspects and compensation for delay; |
AUTHORITY
|
BENCH6
|
|
847 |
CMP/210625/0008058 |
25/06/2021
|
12/11/2022
|
Y KRISHNA KISHORE |
M/S.S.S.BUILDERS AND DEVELOPERS |
SS SNOWDROP |
M/s.S.S.Builders and Developers |
Bengaluru Urban |
sir, I request you to take action on builder ,to make sure he builds all the facilities, which he promised in a shorter time, Thanks sir. |
AUTHORITY
|
FULLBENCH
|
|
848 |
CMP/221013/0010099 |
13/10/2022
|
12/11/2022
|
Mannath kushlani |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Complete refund of the amount paid with delay compensation from the dates of payments made at 18% per annum. |
AUTHORITY
|
BENCH4
|
|
849 |
CMP/221116/0010350 |
16/11/2022
|
12/11/2022
|
PRAKASH KUMAR PUROHIT |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Interest for the delayed period and also early completion of the flat |
AUTHORITY
|
BENCH4
|
|
850 |
CMP/221116/0010352 |
16/11/2022
|
12/11/2022
|
Sapthagirish Bharatwaj S |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation of delayed interest due to delay in handover of possesion at 9.5% pa till 30th sept 2022 and 11.5% pa from 1st oct 2022 till date of possesion handover. |
AUTHORITY
|
BENCH4
|
|
851 |
CMP/221116/0010351 |
16/11/2022
|
12/11/2022
|
DHARMESH KUMAR KOTARI |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Monthly delayed compensation with 10% of interest or as per agreement to manager our house rent expenses |
AUTHORITY
|
BENCH4
|
|
852 |
CMP/221116/0010349 |
16/11/2022
|
12/11/2022
|
GOPAL SINGH |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Interest for the delayed period and also early completion of the flat |
AUTHORITY
|
BENCH4
|
|
853 |
CMP/220218/0009025 |
18/02/2022
|
12/11/2022
|
sumit jain |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Monthly compensation with 10% of interest or as per agreement to manager our house rent expenses |
AUTHORITY
|
BENCH4
|
|
854 |
CMP/220125/0008870 |
25/01/2022
|
10/11/2022
|
Vishwanath |
INNER SPACES |
Meadow in the sun |
Inner spaces |
Bengaluru Urban |
The developer be told to facilitate the formation of RWA and maintain the property till such time. RWA formation has been initiated but it takes time. |
AUTHORITY
|
BENCH6
|
|
855 |
CMP/221110/0010234 |
10/11/2022
|
10/11/2022
|
Deepak Balasaheb Shinde |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Handing over possession with interest on delay. |
AUTHORITY
|
BENCH4
|
|
856 |
CMP/221110/0010235 |
10/11/2022
|
10/11/2022
|
Balasaheb B Pol |
Relationship Properties Private Limited |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Handing over possession with interest on delay. |
AUTHORITY
|
BENCH4
|
|
857 |
CMP/221110/0010236 |
10/11/2022
|
10/11/2022
|
SALAHUDDIN AYUBI S PUNEKAR |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Delay Compensation |
AUTHORITY
|
FULLBENCH
|
|
858 |
CMP/210923/0008369 |
23/09/2021
|
10/11/2022
|
DILIP CHANDRA |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Directing to deliver the possession of the finished flat immediately and pay interest and damages on the delayed possession OR to repay Rs.7,26,92,629/- as compensaiton. |
AUTHORITY
|
BENCH6
|
|
859 |
CMP/UR/210325/0007838 |
25/03/2021
|
09/11/2022
|
P VIDYASAGAR ARYA |
RAMKY ONE NORTH PHASE-2 |
Ramky one north phase 2 |
Ramky Estates and Farms Ltd |
Bengaluru Urban |
Survey of entire land of project, Registration of all phases, maintenance refund |
AUTHORITY
|
FULLBENCH
|
|
860 |
CMP/191109/0004663 |
09/11/2019
|
09/11/2022
|
VIBIN P |
JAITRA TOWERS |
Jaithra Towers |
TV Srinivasa Murthy |
Bengaluru Urban |
Flat |
AUTHORITY
|
FULLBENCH
|
|
861 |
CMP/200822/0006369 |
22/08/2020
|
09/11/2022
|
PURUSOTTAM KUMAR |
GREEN VIEW KORAMANGALA |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
resolution of this matter asap or money refund with full principle and interest paid by me and the bank |
AUTHORITY
|
FULLBENCH
|
|
862 |
CMP/200823/0006401 |
23/08/2020
|
09/11/2022
|
ASHISH KUMAR |
GREEN VIEW KORAMANGALA |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
Quick Action against builder : And refund my complete money given to the builder and interest paid to the bank |
AUTHORITY
|
FULLBENCH
|
|
863 |
CMP/210130/0007526 |
30/01/2021
|
09/11/2022
|
DEV KANT KUMAR |
GREEN VIEW KORAMANGALA |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
We request the RERA authority to intervene and help us in resolving the double sale agreement and delivery issues. The builder has not been compliant to the signed agreement. Kindly help us. |
AUTHORITY
|
FULLBENCH
|
|
864 |
CMP/210221/0007675 |
21/02/2021
|
09/11/2022
|
AJITH K P |
GREEN VIEW KORAMANGALA |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
Refund of money paid till now (Rs. 49,73,538) along with interest and penalty. |
AUTHORITY
|
FULLBENCH
|
|
865 |
CMP/210306/0007753 |
06/03/2021
|
09/11/2022
|
IZAZAHMED |
GREEN VIEW KORAMANGALA |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
The cancellation of 2nd sale agreement with other person |
AUTHORITY
|
FULLBENCH
|
|
866 |
CMP/201116/0007065 |
16/11/2020
|
09/11/2022
|
K S S SRIHARI |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
1. Timely Delivery of the Flat, 2. Furnishing of accurate project details |
AUTHORITY
|
FULLBENCH
|
|
867 |
CMP/201001/0006718 |
01/10/2020
|
09/11/2022
|
PRAKHAR JAISWAL |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
Need my money refunded with bank interests |
AUTHORITY
|
FULLBENCH
|
|
868 |
CMP/201119/0007085 |
19/11/2020
|
09/11/2022
|
SAMBIT CHAKRABORTY |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
1. Push to start the construction 2. Compensation for delay |
AUTHORITY
|
FULLBENCH
|
|
869 |
CMP/210805/0008212 |
05/08/2021
|
09/11/2022
|
ANITH K.P. |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
Project to be completed as per agreement, clear Double registration and no deviation to be executed. |
AUTHORITY
|
FULLBENCH
|
|
870 |
CMP/200111/0005193 |
11/01/2020
|
09/11/2022
|
MAHAVEER L. J. |
M/S PRESTIGE ESTATES PROJECT |
|
|
Bengaluru Urban |
Payment of interest for delayed possession and obtaining occupancy certificate along with any other relief as this Tribunal may deem fit |
AUTHORITY
|
FULLBENCH
|
|
871 |
CMP/200929/0006370 |
29/09/2020
|
09/11/2022
|
RAJIV RANJAN |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
I request to you please have a look in this matter and resolve it as soon as possible as this give financial pain, or i request builder to refund the amount(Principle + interest) |
AUTHORITY
|
FULLBENCH
|
|
872 |
CMP/201117/0007083 |
17/11/2020
|
09/11/2022
|
VINIT KUMAR |
HI LIFE GREENS |
HI LIFE GREENS |
HI LIFE VENTURES PVT LTD |
Bengaluru Urban |
Full refund including amount disbursed ,TDS, bank EMI interest paid till refund date |
AUTHORITY
|
FULLBENCH
|
|
873 |
CMP/200715/0006154 |
15/07/2020
|
09/11/2022
|
Kandi Phani Kumar |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
874 |
CMP/210317/0007793 |
17/03/2021
|
09/11/2022
|
Indu N C |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Webcity3A |
Mantri Developers Private Limited |
Bengaluru Urban |
Delay compensation in term of section 12 14 18 & 19 and detail relief described in the Facts of Complaint, due to want of space |
AUTHORITY
|
BENCH5
|
|
875 |
CMP/200804/0006309 |
04/08/2020
|
09/11/2022
|
Rashmi Ranjan Mishra |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
876 |
CMP/221107/0010189 |
07/11/2022
|
09/11/2022
|
PANKAJ |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation for delay. |
AUTHORITY
|
FULLBENCH
|
|
877 |
CMP/220812/0009883 |
12/08/2022
|
09/11/2022
|
HEMANTH KUMAR C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Possession of the property and delay compensation |
AUTHORITY
|
FULLBENCH
|
|
878 |
CMP/181207/0001731 |
07/12/2018
|
09/11/2022
|
KALLURI SUDHAMATHI |
CHOWRIAPPA CONSTRUCTIONS PVT. LTD. |
CHOWRIAPPA CONSTELLATION |
CHOWRIAPPA CONSTRUCTIONS PVT. LTD. |
Bengaluru Urban |
Regn Flat without Encumbrance, OC,Compensation |
AUTHORITY
|
FULLBENCH
|
|
879 |
CMP/UR/210630/0008077 |
30/06/2021
|
09/11/2022
|
Vikas R S |
SNR SQUARE PVT LTD |
SNR Silver Ripples |
SNR Square Pvt Ltd |
Bengaluru Rural |
refund the advance maintenance paid, compensation for mental agony, form appropriate co-operative society under the right law, |
AUTHORITY
|
FULLBENCH
|
|
880 |
CMP/201127/0007138 |
27/11/2020
|
09/11/2022
|
Mahesh Sudhakaran |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
881 |
CMP/210604/0007979 |
04/06/2021
|
09/11/2022
|
VENKATRAM RAMMURTHY |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
882 |
CMP/210118/0007468 |
18/01/2021
|
09/11/2022
|
RAHUL SHUKLA |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
883 |
CMP/201127/0007137 |
27/11/2020
|
09/11/2022
|
Mahesh Sudhakaran |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
Refund along with interest and compensation |
AUTHORITY
|
FULLBENCH
|
|
884 |
CMP/210107/0007412 |
07/01/2021
|
09/11/2022
|
SHIVANAND HIREMATH |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
885 |
CMP/210203/0007565 |
03/02/2021
|
09/11/2022
|
ASHISH CHOUDHURY |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
886 |
CMP/210118/0007469 |
18/01/2021
|
09/11/2022
|
RAHUL SHUKLA |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
887 |
CMP/201125/0007124 |
25/11/2020
|
09/11/2022
|
Vikash Dhariwal |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
Refund along with interest and compensation |
AUTHORITY
|
FULLBENCH
|
|
888 |
CMP/210118/0007470 |
18/01/2021
|
09/11/2022
|
RAHUL SHUKLA |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
889 |
CMP/210626/0008061 |
26/06/2021
|
09/11/2022
|
NIKHIL RANADE |
Antevorta Developers Private Limited |
Glenclassic |
Antevorta Developers Private Limited |
Bengaluru Urban |
REFUND ALONG WITH INTEREST AND COMPENSATION |
AUTHORITY
|
FULLBENCH
|
|
890 |
CMP/200918/0006540 |
18/09/2020
|
09/11/2022
|
Himanshu Srivastava |
MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
891 |
CMP/200828/0006462 |
28/08/2020
|
09/11/2022
|
AMULYA GOGULA |
M/S GR PROMOTORS |
G R LUXURIA |
G R PROMOTERS |
Bengaluru Urban |
Kindly in view of my submissions, I request you to please direct the promoters to allot us a 180 sq ft car parking as per Khata. |
AUTHORITY
|
FULLBENCH
|
|
892 |
CMP/UR/210209/0007392 |
09/02/2021
|
08/11/2022
|
SUNIL M |
VANDANA EARLS COURT |
Vandana Earls Court |
Sri Vandana Infra |
Bengaluru Urban |
1) Adhrence to sec 11 of the RERA act and all its sub clauses until proper handover 2) compensation of Rs 1,00,000 at 24% interest p/m from 2015 december till completion and handover of the project. |
AUTHORITY
|
BENCH4
|
|
893 |
CMP/200816/0006368 |
16/08/2020
|
08/11/2022
|
SUJAN KUMAR |
CASA GRANDE GARDEN CITY BUILDERS PVT LTD |
Casagrand Royce |
Casa Grande Garden City Builders Pvt Ltd |
Bengaluru Urban |
No communication on extension from RERA till today |
AUTHORITY
|
BENCH4
|
|
894 |
CMP/180924/0001308 |
24/09/2018
|
08/11/2022
|
Sarathy Sadagopoan |
ASTHA REAL ESTATE CORPORATION |
Artha Neo Aspire |
Artha Real Estate Corporation |
Bengaluru Urban |
Re-sell of plot to Artha and refund with interest |
AUTHORITY
|
BENCH6
|
|
895 |
CMP/211206/0008688 |
06/12/2021
|
08/11/2022
|
THALAGAVARA PARTHASARATHY ASHOK |
CENTURY REAL ESTATE HOLDINGS PRIVATE LIMITED |
Century Ethos |
Century Real Estate Holdings Private Limited |
Bengaluru Urban |
I am filing this fresh complaint seeking reliefs under the RERA act to compensate me for delayed completion and handing over as per law. I am seeking compensation for the delayed handover till now . |
AUTHORITY
|
BENCH6
|
|
896 |
CMP/UR/190910/0004172 |
10/09/2019
|
08/11/2022
|
Ambarish Srivastav |
GM INFINITE DWELLING INDIA PVT LTD |
GM Infinite eCity Town Phase2 |
Gulam Mustafa |
Bengaluru Urban |
Delay Compensation with interest for delay |
AUTHORITY
|
BENCH6
|
|
897 |
CMP/UR/190715/0003508 |
15/07/2019
|
08/11/2022
|
Satya Sundar Panda |
GM INFINITE DWELLING INDIA PVT LTD |
GM Infinite E City Phase -2 |
Gm Infinite Dwelling Pvt Ltd |
Bengaluru Urban |
Comnpensation for Delay in Handover . |
AUTHORITY
|
BENCH6
|
|
898 |
CMP/UR/190807/0003837 |
07/08/2019
|
08/11/2022
|
Biju T K |
GM INFINITE DWELLING INDIA PRIVATE LIMITED |
GM INFINITE E CITY TOWN PHASE -2 |
GM Infinite Dwelling (India) Pvt Ltd |
Bengaluru Urban |
Compensation for delay and OC |
AUTHORITY
|
BENCH6
|
|
899 |
CMP/220601/0009559 |
01/06/2022
|
08/11/2022
|
Aarthi Alat sajeev |
Sai sunshine |
SAI SUNSHINE |
B VEENAVANI |
Bengaluru Urban |
Payment of compensation of Rs.45,00,000/- with interest at 18% p.a till project completion or date of payment whichever is later to the Complainants |
AUTHORITY
|
FULLBENCH
|
|
900 |
CMP/210512/0007947 |
12/05/2021
|
08/11/2022
|
S G Sambasivan |
V N Kumar |
Mantri Blossom1 |
Mantri Gardenview Homes Private Ltd |
Bengaluru Urban |
Refund of Advance payment alongwith interest |
AUTHORITY
|
FULLBENCH
|
|
901 |
CMP/200715/0006135 |
15/07/2020
|
08/11/2022
|
Vijayaraghavan S V |
Mantri Technology Constellations Pvt Ltd., |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Case |
AUTHORITY
|
BENCH5
|
|
902 |
CMP/200310/0005592 |
10/03/2020
|
07/11/2022
|
Paul Mani |
Mantri Developers Private Limited |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
903 |
CMP/200918/0006576 |
18/09/2020
|
07/11/2022
|
Somashekar S Umadi |
Mantri Developers Private Limited |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
904 |
CMP/190309/0002402 |
09/03/2019
|
07/11/2022
|
PRADEEP KUMAR KOTHA |
PURVA STAR PROPERTIES PVT. LTD. |
Purva Westend |
Purva Star Properties Ltd |
Bengaluru Urban |
Compensation as per RERA Act |
AUTHORITY
|
FULLBENCH
|
|
905 |
CMP/211002/0008412 |
02/10/2021
|
07/11/2022
|
BADRIPRASAD B.R. |
GREEN VIEW KORAMANGALA |
GREEN VIEW KORAMANGALA |
ITALIX LIVING SPACES PVT LTD |
Bengaluru Urban |
Immediate lumpsum refund of invested sum Rs. 1,46,49,500/-, plus interest 11.35% Rs. 90,55,384/- upto 30-Sept 2021, plus interest till refund date. Compensation of Rs. 1.2 crore for mental agony. |
AUTHORITY
|
FULLBENCH
|
|
906 |
CMP/200229/0005599 |
29/02/2020
|
07/11/2022
|
Muralidhar Sortur |
Mantri Technology Constellations Pvt Ltd |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
907 |
CMP/200415/0005827 |
15/04/2020
|
07/11/2022
|
Girish Nayak |
Mantri Technology Constellations Pvt Ltd |
Mantri Webcity2B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in facts of Complaint |
AUTHORITY
|
BENCH5
|
|
908 |
CMP/200718/0006168 |
18/07/2020
|
07/11/2022
|
Prashant S Ghargi |
Mantri Technology Constellations Pvt Ltd |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
909 |
CMP/190702/0003376 |
02/07/2019
|
07/11/2022
|
A. Nirmal Raj |
CHOWRIAPPA CONSTRUCTIONS PVT. LTD. |
CHOWRIAPPA CONSTELLATION |
CHOWRIAPPA CONSTRUCTIONS PVT. LTD. |
Bengaluru Urban |
Delivery of Apt, Delay Compensation & as prayed |
AUTHORITY
|
FULLBENCH
|
|
910 |
CMP/191212/0004957 |
12/12/2019
|
07/11/2022
|
Harsh Tibarewala and Vanitha Tibarewala |
Krishna E Campus pvt ltd |
LAPALAZZO RESIDENCES |
KRISHNA E CAMPUS PVT LTD |
Bengaluru Urban |
Relief sought can be found in the attached complaint |
AUTHORITY
|
BENCH5
|
|
911 |
CMP/191122/0004784 |
22/11/2019
|
05/11/2022
|
Srinivas Kulkarni |
Mantri Developers Private Limited |
Mantri Webcity2B |
Mantri Developers Private Limited |
Bengaluru Urban |
Request you to help us get our money back |
AUTHORITY
|
BENCH5
|
|
912 |
CMP/210524/0007958 |
24/05/2021
|
05/11/2022
|
Sunitha A Kumar |
SHRIRAM PROPERTIES PRIVATE LIMITED |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation and interest refund till receipt of OC for both units and cancellation of unit1 without any penalty . GST 12% is charged instead of 5% fixed by GOVT. Difference amt to be refunded |
AUTHORITY
|
BENCH5
|
|
913 |
CMP/UR/210128/0007132 |
28/01/2021
|
05/11/2022
|
Deepa Murthy |
Sobha City |
Sobha City - Casa serenita |
RADHAKRISHNAN MEENAKSHISUNDARAM |
Bengaluru Urban |
Compensation for the damages to property and mental agony aggregating to Rs.20 lacs |
AUTHORITY
|
BENCH5
|
|
914 |
CMP/221028/0010137 |
28/10/2022
|
04/11/2022
|
V V GOURISHANKAR KRUPANIDHI |
ZUARI INFRAWORLD INDIA LIMITED |
Zuari Garden City - Brindavan Serenity |
ZUARI INFRAWORLD INDIA LIMITED |
Bengaluru Urban |
To recover our advance amount of Rs.51,000/- with interest & any other reliefs. |
AUTHORITY
|
FULLBENCH
|
|
915 |
CMP/220920/0010029 |
20/09/2022
|
04/11/2022
|
ANANDA JEEVAVASAHAN |
Sobha Limited |
Sobha Dream Gardens Phase 2 ? Wing 5, 6 and 7 |
Sobha Limited |
Bengaluru Urban |
kindly help us to get the refund of Rs 4.00 lacs which we have paid to the builder |
AUTHORITY
|
BENCH4
|
|
916 |
CMP/221104/0010177 |
04/11/2022
|
04/11/2022
|
ANANDA JEEVAVASAHAN |
Sobha Limited |
Sobha Dream Gardens Phase 2 ? Wing 5, 6 and 7 |
Sobha Limited |
Bengaluru Urban |
KINDLY ENABLE ME GET THE AMOUNT OF Rs 4.00 LACS WHICH I PAID TO THE COMPANY |
AUTHORITY
|
BENCH4
|
|
917 |
CMP/220530/0009537 |
30/05/2022
|
04/11/2022
|
Sourav Maity |
BOLLINENI DEVELOPERS LTD |
BOLLINENI SILAS |
BOLLINENI DEVELOPERS LTD |
Bengaluru Urban |
NOC |
AUTHORITY
|
BENCH4
|
|
918 |
CMP/210830/0008283 |
30/08/2021
|
04/11/2022
|
Sheela Jha |
SHRIRAM PROPERTIES PRIVATE LIMITED |
SHRIRAM SUMMITT |
SHRIRAM PROPERTIES PRIVATE LIMITED |
Bengaluru Urban |
Delay compensation + Project completion + Cost of legal expenses |
AUTHORITY
|
BENCH5
|
|
919 |
CMP/UR/201028/0006970 |
28/10/2020
|
04/11/2022
|
Sriram Ananthapadmanabhan |
Mantri Castles Private Ltd |
Manti Serenity 5 |
Mantri Castles Private Ltd |
Bengaluru Urban |
Compensation for breach of terms relating payment of Pre Emi and delay Compensation |
AUTHORITY
|
BENCH5
|
|
920 |
CMP/210618/0008010 |
18/06/2021
|
04/11/2022
|
MANDU PANDY |
PLAZZACITY |
SJR PRIMECORPORATION PVT LTD Palazzacity |
SJR PRIMECORPORATION PVT LTD |
Bengaluru Urban |
pay over damages as per Real Estate Regulation Act, 2016 and Rules made thereunder which at present amount to Rs. 29,18,717 till date for the delay in possession ,b. cure the defects in construction, |
AUTHORITY
|
FULLBENCH
|
|
921 |
CMP/210802/0008198 |
02/08/2021
|
04/11/2022
|
RANJITH P K P |
SKY VIEW |
skyview |
Sanchaya Land And Estate Private Limited |
Bengaluru Urban |
Request to initiate action for an early possession of my allotted flat. |
AUTHORITY
|
FULLBENCH
|
|
922 |
CMP/211022/0008462 |
22/10/2021
|
04/11/2022
|
RANJITH P K P |
SKY VIEW |
skyview |
Sanchaya Land And Estate Private Limited |
Bengaluru Urban |
Refund of my paid amount of Rs. 20,24,873/- with 18% interest from the Builder (Promoter) M/s. Sanchaya Land and Estate Pvt. Ltd. |
AUTHORITY
|
FULLBENCH
|
|
923 |
CMP/200827/0006453 |
27/08/2020
|
04/11/2022
|
LEELA SOMANNA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
924 |
CMP/200827/0006455 |
27/08/2020
|
04/11/2022
|
MERWIN PAUL PALANNA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
925 |
CMP/200826/0006430 |
26/08/2020
|
04/11/2022
|
ADHIL KHAN |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
926 |
CMP/200827/0006454 |
27/08/2020
|
04/11/2022
|
JACQUELINE PRIYADARSHINI |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
927 |
CMP/200826/0006420 |
26/08/2020
|
04/11/2022
|
K S FRANKLIN |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
928 |
CMP/200826/0006439 |
26/08/2020
|
04/11/2022
|
SARA ABDULLA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
929 |
CMP/200826/0006425 |
26/08/2020
|
04/11/2022
|
ADIL FARHAN |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
930 |
CMP/200827/0006457 |
27/08/2020
|
04/11/2022
|
DHARMENDRA PRAVINCHANDRA SOLANKI |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
931 |
CMP/200826/0006428 |
26/08/2020
|
04/11/2022
|
ANGELO RAJ |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
932 |
CMP/200826/0006429 |
26/08/2020
|
04/11/2022
|
AGNELO RAJ |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
933 |
CMP/200826/0006422 |
26/08/2020
|
04/11/2022
|
MOHAMMED THAMEEM ANSARI |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
934 |
CMP/200827/0006456 |
27/08/2020
|
04/11/2022
|
BINA KANSARA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
935 |
CMP/200915/0006587 |
15/09/2020
|
04/11/2022
|
Umesh Subramani |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
Refund Rs. 4686613/- with interest to Complainant |
AUTHORITY
|
BENCH5
|
|
936 |
CMP/200826/0006423 |
26/08/2020
|
04/11/2022
|
SAHAYA MANICHA RETCHAGAN |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
937 |
CMP/200826/0006421 |
26/08/2020
|
04/11/2022
|
C VASANTHI |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
938 |
CMP/200827/0006431 |
27/08/2020
|
04/11/2022
|
VINCENT JAMES DSOUZA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
939 |
CMP/200826/0006427 |
26/08/2020
|
04/11/2022
|
JACOB PHILIP |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
940 |
CMP/200826/0006424 |
26/08/2020
|
04/11/2022
|
PUNEETH M MAHENDRA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
941 |
CMP/200826/0006426 |
26/08/2020
|
04/11/2022
|
LEELA SOMANNA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
942 |
CMP/200829/0006468 |
29/08/2020
|
04/11/2022
|
REKHA NAIR |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
943 |
CMP/200827/0006443 |
27/08/2020
|
04/11/2022
|
SATYANARAYAN AGARWALA |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
944 |
CMP/200827/0006445 |
27/08/2020
|
04/11/2022
|
SANDEEP AGARWAL |
M/S ELEGANT PROPERTIES |
|
|
Bengaluru Urban |
DELIVER THE FLAT ALONG WITH COMPENSATION AMONG OTHER RELIEFS CLAIMED IN PETITION. |
AUTHORITY
|
BENCH5
|
|
945 |
CMP/221104/0010184 |
04/11/2022
|
04/11/2022
|
VINOD KUMAR C |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
delay compensation and registration. |
AUTHORITY
|
FULLBENCH
|
|
946 |
CMP/220818/0009908 |
18/08/2022
|
04/11/2022
|
E R NEMINATHA |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
Compensation of atleast Rs.40000 per month from January 2020 till the date of hand over of apartment |
AUTHORITY
|
FULLBENCH
|
|
947 |
CMP/221104/0010183 |
04/11/2022
|
04/11/2022
|
GAJENDRA KUMAR PUROHIT |
RELATIONSHIP PROPERTIES PRIVATE LIMITED |
Parkwest - Maple - Tower 4 |
Relationship Properties Private Limited |
Bengaluru Urban |
delay compensation. |
AUTHORITY
|
FULLBENCH
|
|
948 |
CMP/220516/0009459 |
16/05/2022
|
04/11/2022
|
Ajith Murthy |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Payment of PRE-EMI dues & delay compensation, to the tune of Rs. 39,55,541/- along with direction for completion of the Apartment and hand over of the possession |
AUTHORITY
|
BENCH6
|
|
949 |
CMP/220316/0009139 |
16/03/2022
|
04/11/2022
|
Saravanan Venkataraman |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Directing the Respondent Builder to refund the sum of Rs. 60,60,214/- (Rupees Sixty Lakhs Sixty Thousand Two Hundred and Fourteen Only) along with other Monies paid by the Complainant. |
AUTHORITY
|
BENCH6
|
|
950 |
CMP/220112/0008786 |
12/01/2022
|
04/11/2022
|
Nithin Shet |
OZONE URBANA INFRA DEVELOPERS PRIVATE LIMITED |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Compensation for delay and relaed losses suffered |
AUTHORITY
|
BENCH6
|
|
951 |
CMP/220516/0009467 |
16/05/2022
|
04/11/2022
|
Ajith Murthy |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Payment of PRE-EMI dues & delay compensation, to the tune of Rs. 39,55,541/- along with direction for completion of the Apartment and hand over of the possession |
AUTHORITY
|
BENCH6
|
|
952 |
CMP/201003/0006749 |
03/10/2020
|
03/11/2022
|
SREENIVASA REDDY |
APPLE SPIRE INDIA LLP |
BIRLA APPLE SPIRE |
Apple spire India LLP |
Bengaluru Urban |
support from RERA for complete refund from builder at earliest |
AUTHORITY
|
BENCH6
|
|
953 |
CMP/200705/0006119 |
05/07/2020
|
03/11/2022
|
CHETAN SHETTY |
S V SPRING |
S V Springwoods |
SRI VINAYAKA INFRA |
Bengaluru Urban |
Please take necessary action against the builder and advice him to complete the project immediately and provide us with the BBMP Occupancy certificate & all the amenities promised . |
AUTHORITY
|
FULLBENCH
|
|
954 |
CMP/200704/0006116 |
04/07/2020
|
03/11/2022
|
KISHOR BHARGAV B. M. |
S V SPRINGWOODS |
S V Springwoods |
SRI VINAYAKA INFRA |
Bengaluru Urban |
Please take necessary action against the builder and advice him to complete the project immediately and provide us with the BBMP Occupancy certificate & all the amenities promised |
AUTHORITY
|
FULLBENCH
|
|
955 |
CMP/200826/0006419 |
26/08/2020
|
03/11/2022
|
Saravanan Rajan |
SHRIVISION HOMES PRIVATE LIMITED |
SHRIRAM CHIRPING WOODS |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Rural |
Refrain the Respondent form disruption of maintenance services pending disposal of this complaint. Direct Respondent to form the association and provided audited books with respect to the maintenance |
AUTHORITY
|
FULLBENCH
|
|
956 |
CMP/200916/0006594 |
16/09/2020
|
03/11/2022
|
Saravanan Rajan |
SHRIVISION HOMES PRIVATE LIMITED |
SHRIRAM CHIRPING WOODS |
SHRIVISION HOMES PRIVATE LIMITED |
Bengaluru Rural |
Formation of a single owners association. |
AUTHORITY
|
FULLBENCH
|
|
957 |
CMP/220116/0008805 |
16/01/2022
|
03/11/2022
|
Putrevu Subramanyam |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Compensation for delay and related losses suffered |
AUTHORITY
|
BENCH6
|
|
958 |
CMP/210813/0008243 |
13/08/2021
|
03/11/2022
|
Bhavna Gupta |
OZONE URBANA INFRA DEVELOPERS PVT LTD |
Ozone Urbana |
Ozone Urbana Infra Developers Pvt Ltd |
Bengaluru Urban |
Compensation and refund of invested money with interest |
AUTHORITY
|
BENCH6
|
|
959 |
CMP/200911/0006558 |
11/09/2020
|
02/11/2022
|
Sukanta Kumar Nayak |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
960 |
CMP/200907/0006522 |
07/09/2020
|
02/11/2022
|
Mubeena Kausar |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
961 |
CMP/200804/0006299 |
04/08/2020
|
02/11/2022
|
Vijaya S S |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Case |
AUTHORITY
|
BENCH5
|
|
962 |
CMP/200802/0006166 |
02/08/2020
|
02/11/2022
|
Shashank Aroor |
Mantri Manyata Energia |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of complaint |
AUTHORITY
|
BENCH5
|
|
963 |
CMP/200715/0006177 |
15/07/2020
|
02/11/2022
|
Sriram and Anuradha R |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
964 |
CMP/200804/0006198 |
04/08/2020
|
02/11/2022
|
Anoop Kumar H S R |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
965 |
CMP/200720/0006199 |
20/07/2020
|
02/11/2022
|
Niveditha B K |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
966 |
CMP/210302/0007712 |
02/03/2021
|
02/11/2022
|
Narendra Reddy |
Mantri Castles Pvt Ltd |
Mantri Serenity1 |
Mantri Castles Pvt Ltd |
Bengaluru Urban |
Delay compensation, refund of PRE-EMI and possession of apartment by sale deed and as prayed in the facts of case due to lack of space. |
AUTHORITY
|
BENCH5
|
|
967 |
CMP/200716/0006190 |
16/07/2020
|
02/11/2022
|
Kumaraswamy R S |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
968 |
CMP/200805/0006300 |
05/08/2020
|
02/11/2022
|
Noor Ayesha |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
969 |
CMP/200906/0006301 |
06/09/2020
|
02/11/2022
|
Dr.Akshay Dwarakanath |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
970 |
CMP/200726/0006236 |
26/07/2020
|
02/11/2022
|
Ravi Tomal Raghavendra |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed for in the Facts of complaint |
AUTHORITY
|
BENCH5
|
|
971 |
CMP/200801/0006187 |
01/08/2020
|
02/11/2022
|
Guru Bhadra Singh |
Mantri Developers Private Limited |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
972 |
CMP/220622/0009657 |
22/06/2022
|
02/11/2022
|
MAHESH HEBBALLI & RASHMI ANGADI |
RAJA HOUSING LIMITED |
RAJA RITZ AVENUE - PHASE 1 |
RAJA HOUSING LIMITED |
Bengaluru Urban |
Providing compensation from Raja Housing, for delayed Construction and handover of flat |
AUTHORITY
|
BENCH6
|
|
973 |
CMP/200410/0005824 |
10/04/2020
|
02/11/2022
|
Venkatesh V V |
Mantri Developers Private Limited |
Mantri Webcity3B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
974 |
CMP/200402/0005737 |
02/04/2020
|
02/11/2022
|
Neeraj Sharma |
Mantri Developers Private Limited |
Mantri Webcity3B |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in facts of complaint |
AUTHORITY
|
BENCH5
|
|
975 |
CMP/200522/0005884 |
22/05/2020
|
02/11/2022
|
Ratheesh Kummarkkaroth |
Mantri Developers Private Limited |
Mantri Webcity2A |
Mantri Developers Private Limited |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
976 |
CMP/200715/0006159 |
15/07/2020
|
02/11/2022
|
Amit Kumar Singh |
Mantri Technology Constellations Pvt. Ltd. |
Mantri Manyata Energia |
Mantri Technology Constellations Pvt. Ltd. |
Bengaluru Urban |
As prayed in the Facts of Complaint |
AUTHORITY
|
BENCH5
|
|
977 |
CMP/200602/0005953 |
02/06/2020
|
02/11/2022
|